Order Date | Document | Case Number |
1/4/2016
|
20160104_DATA_REQUEST.pdf
Data Request
|
2015-00382
|
1/5/2016
|
20160105_PSC_ORDER.pdf
Order entered: The accounting treatment requested by Big Rivers to establish a
regulatory asset for the income statement impacts including gains, losses, depreciation
and accretion expense related to its Green and Station Two ash ponds is approved for
2
|
2015-00333
|
1/6/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a Certificate of Public Convenience and
Necessity to construct a wireless telecommunications facility. The proposed facility
consists of a self-supporting antenna tower not to exceed 310 feet in height, with
attached antenna, and is to be located at Buckhorn Road, Beaver, Floyd County,
Kentucky. The coordinates for the proposed facility are North Latitude 37° 24' 3.3" by
West Longitude 82° 40' 4.86".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shaii be retained in the utility's general
correspondence file.
|
2015-00231
|
1/6/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00367
|
1/6/2016
|
PSC_ORDER
Order Entered: The presentation at KRWA's Water and Wastewater Training-McCreary
County training event held on December 18, 2015, in Whitley City, Kentucky, is
accredited and approved for a maximum of six credit hours of water district
management training.
2. KRWA shall retain a record of all water district commissioners attending
the accredited and approved presentations.
3. No later than 30 days after the date of this Order, KRWA shall file with the
Commission:
a. A sworn statement attesting that the accredited instruction was
performed:
b. A description of any changes in the presenters or the proposed
curriculum that occurred after KRWA's application;
c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended;
d. A copy of any written material given to water commissioners
attending the presentations;
e. Documents indicating whether the Kentucky Board of Certification
of Water Treatment and Distribution System Operators approved the training for
continuing education credit; and
f. Documents indicating whether the Kentucky Board of Certification
of Wastewater System Operators approved the training for continuing education credit.
|
2015-00403
|
1/6/2016
|
PSC_ORDER
Order Entered: Big Sandy's request to withdraw its application is granted.
2. This matter shall be removed from the Commission's docket without
prejudice.
|
2015-00405
|
1/6/2016
|
PSC_ORDER
Order Entered: The presentation at the Northeast Regional Meeting scheduled to be held
on January 12, 2016, in Morehead, Kentucky, is accredited and approved for a
maximum of two credit hours of water district management training.
2. The presentation at the Green River Regional Meeting scheduled to be
held on January 14, 2016, in Owensboro, Kentucky, is accredited and approved for a
maximum of two credit hours of water district management training.
3. The presentation at the Western Regional Meeting held on January 21,
2016, in Draffenville, Kentucky, is accredited and approved for a maximum of two credit
hours of water district management training.
4. KRWA shall retain a record of all water district commissioners attending
the accredited and approved presentations.
5. No later than 30 days after the entry of this Order, KRWA shall file with the
Commission:
a. A sworn statement attesting that the accredited instruction was
performed:
b. A description of any changes in the presenters or the curriculum
that occurred after KRWA's application;
c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended;
d. A copy of any written material given to water commissioners
attending the presentations; and
|
2015-00406
|
1/6/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.19 per 1,000 gallons is
approved.
2. South 641's proposed rates are approved, as set forth in Appendix B to
this Order, for water service rendered on and after January 1, 2016.
3. Within 20 days of the date of this Order, South 641 shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2015-00414
|
1/7/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a Certificate of Public Convenience and
Necessity to construct a wireless telecommunications facility. The proposed facility
consists of a self-supporting antenna tower not to exceed 410 feet in height, with
attached antenna, and is to be located at Willis Road, Prestonsburg, Floyd County,
Kentucky. The coordinates for the proposed facility are North Latitude 37° 38' 5.95" by
West Longitude 82° 44' 24.30".
2. The Applicant shall file a copy of the final decision regarding the pending
KAZC application for the proposed construction within ten days of receiving the
decision.
3. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
4. Documents filed, if any, in the future pursuant to ordering paragraphs 2
and 3 herein shall reference this case number and shall be retained in the utility's
general correspondence file.
|
2015-00344
|
1/7/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00358
|
1/7/2016
|
PSC_ORDER
Order Entered: Lyon District is granted a CPCN for the proposed construction as set forth
in its application.
2. Lyon District's proposed plan of financing is approved.
3. Lyon District is authorized to issue $1,900,000 of its Waterworks Revenue
Bonds maturing over 40 years at an interest rate not exceeding 3.00 percent per
annum.
|
2015-00376
|
1/7/2016
|
20160107_PSC_ORDER.pdf
|
2015-00412
|
1/7/2016
|
20160107_PSC_ORDER.pdf
|
2015-00411
|
1/8/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00296
|
1/8/2016
|
DATA_REQUEST
COMMISSION STAFF'S SECOND REQUEST FOR INFORMATION
TO ATMOS ENERGY CORPORATION
|
2015-00384
|
1/8/2016
|
DATA_REQUEST
COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION
TO DUKE ENERGY KENTUCKY. INC.
|
2015-00413
|
1/8/2016
|
20160108_DATA_REQUEST.pdf
Data Request
|
2015-00418
|
1/8/2016
|
20160108_PSC_ORDER.pdf
|
2015-00343
|
1/11/2016
|
PSC_ORDER
Order Entered: 1. The Commission's December 22, 2015 Order requiring the filing of a witness list by January 13, 2016, is suspended indefinitely.
2. The January 20, 2016 hearing in this matter is suspended to a date to be determined.
|
2015-00178
|
1/11/2016
|
20160111_PSC_ORDER.pdf
|
2015-00264
|
1/12/2016
|
PSC_ORDER
Order Entered: 1. EKPC's motion for confidential protection is granted in part and denied in part. 2. EKPC's request for confidential treatment of information set forth in its response to Staff's Post-Hearing Request, Item 2, is granted. The information set forth in EKPC's response to Staff's Post-Hearing Request, Item 2, shall remain confidential for a period of ten years. 3. EKPC's request for confidential treatment of information set forth in EKPC's response to Staff's Post-Hearing Request, Items 8 and 9, is denied. 4. Within seven days of the date of this Order, EKPC shall file a revised response to Staffs Post-Hearing Request, Items 8 and 9, reflecting as unredacted the information that has been denied confidential treatment. 5. The materials set forth in EKPC's response to Staffs Post-Hearing Request, Item 2, for which EKPC's request for confidential treatment has been granted, shall not be placed in the public record or made available for public inspection for a period of ten years. 6. The materials set forth in EKPC's response to Staff's Post-Hearing Request, Items 8 and 9, for which EKPC's request for confidential treatment has been denied, shall not be placed in the public record or made available for inspection for 20 days from the date of this Order to allow Movant to seek a remedy afforded by law. 7. Use of the materials that were granted confidential treatment in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9).
|
2015-00267
|
1/12/2016
|
PSC_ORDER
Final Order Entered: 1. Atmos is authorized to issue up to 2,500,000 shares of common stock through its LTIP, as set forth in its application. 2. The proceeds from the transactions authorized herein shall be used only for the lawful purposes set out in the application.
|
2015-00379
|
1/13/2016
|
PSC_ORDER
Final Order Entered: 1. EKPC's request for a determination that all future LFGTE projects are exempt from the requirements for a CPCN under KRS 278.020(1) is denied. 2. In lieu of filing an application for a declaratory order, EKPC is authorized to request a Staff legal opinion as to whether a future LFGTE project falls within the ordinary course of business exemption pursuant to KRS 278.020(1) or requires a CPCN
based on a demonstration of the information discussed in the findings above.
|
2015-00284
|
1/13/2016
|
STAFF_REPORT
Notice of Filing of Commission Staff Report
|
2015-00306
|
1/13/2016
|
PSC_ORDER
Order Entered: Bush Gardens is required to file written comments regarding the findings in the Commission Staff Report no later than January
29, 2016, or 14 days after the filing of the report, whichever occurs earlier.
|
2015-00306
|
1/13/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Delta and set forth in the Appendix to this Order are approved for final meter readings on and after January 20, 2016. 2. Within 20 days of the date of this Order, Delta shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2015-00423
|
1/13/2016
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Public is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered by Public on and after February 1, 2016. 3. Within 20 days of the date of this Order, Public shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2015-00426
|
1/13/2016
|
PSC_ORDER
Order Entered: KU is granted a CPCN that authorizes it to bid on a franchise offered by
the city of Eddyville, Kentucky, for electric transmission and distribution service.
2. If KU is not the successful bidder, KU shall, within ten days of the award of
the franchise at issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU is the successful bidder, KU shall, within ten days of the award of the
franchise at issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the initial franchise fee.
4. If KU is the successful bidder, KU shall, within ten days of an increase or
decrease in the amount of the initial franchise fee set forth in the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00031
|
1/13/2016
|
PSC_ORDER
Order Entered: KU is granted a CPON that authorizes it to bid on a franchise offered by
the city of Fredonia, Kentucky, for electric transmission and distribution service.
2. If KU is not the successful bidder, KU shall, within ten days of the award of
the franchise at issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU is the successful bidder, KU shall, within ten days of the award of the
franchise at issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the initial franchise fee.
4. If KU is the successful bidder, KU shall, within ten days of an increase or
decrease in the amount of the initial franchise fee set forth in the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00032
|
1/13/2016
|
PSC_ORDER
Order Entered: LGE is granted a OPCN that authorizes it to bid on a franchise offered by
Louisville Metro Government for natural gas transmission and distribution service.
2. If LGE is not the successful bidder, LGE shall, within ten days of the
award of the franchise at issue, file with the Commission a written notice stating that
LGE was not the successful bidder.
3. If LGE is the successful bidder, LGE shall, within ten days of the award of
the franchise at issue, file with the Commission a copy of the executed franchise
agreement and a statement disclosing the amount of the initial franchise fee.
4. If LGE is the successful bidder, LGE shall, within ten days of an increase
or decrease in the amount of the initial franchise fee set forth in the franchise
agreement, file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities within the area subject to the jurisdiction of Louisville Metro Government.
|
2016-00038
|
1/13/2016
|
20160113_PSC_ORDER.pdf
|
2015-00264
|
1/14/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to T. Rowe Price Associates, Inc.
|
2015-00389
|
1/14/2016
|
PSC_ORDER
Order Entered: 1. The proposed special contract between EKPC, Nolin, and AGC is suspended for five months, up to and including June 16, 2016. 2. EKPC shall file responses to the request for information attached as an Appendix to this Order within 14 days of the date of this Order.
3. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and one copy to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2015-00422
|
1/14/2016
|
20160114_PSC_ORDER.pdf
|
2014-00372
|
1/14/2016
|
20160114_PSC_ORDER.pdf
|
2015-00368
|
1/14/2016
|
20160114_DATA_REQUEST.pdf
Data Request
|
2015-00368
|
1/15/2016
|
PSC_ORDER
Order Entered: 1. Movant's motion for confidential protection of its response to the Staff's Initial Request, Item 17, is granted. 2. Pursuant to KRS 61.878, the information for which Movant requests confidential protection shall not be placed in the public record or made available for public inspection for an indefinite period of time, or until further Order of the Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Movant shall inform the Commission if the materials in question become
publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted
confidential treatment by this Order, the Movant shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Movant is unable to make such demonstration, the requested materials shall be made available for inspection.
|
2015-00051
|
1/15/2016
|
PSC_ORDER
Order Entered: . Cannonsburg's request to withdraw its application is granted.
2. This case is closed and removed from the Commission's docket without
prejudice.
|
2015-00399
|
1/15/2016
|
20160115_PSC_ORDER.pdf
|
2015-00143
|
1/15/2016
|
20160115_PSC_ORDER.pdf
|
2015-00210
|
1/19/2016
|
PSC_ORDER
Final Order Entered: 1. KAWC is authorized to continue participating in the AWCC borrowing program under the terms of the Financial Services Agreement that it executed with AWCC on June 15, 2000. 2. a. KAWC is authorized to issue to AWCC securities in the form of notes or debentures in an aggregate amount of $12,250,000 from time to time, prior to December 31 , 2017, for the purpose of refinancing the short-term debt used to fund various construction expenditures and to meet other internal cash requirements. b. KAWC shall obtain an interest rate from AWCC that is no greater than the lowest available rate to KAWC or the average rate available on bonds issued by AWCC. 3. At least 15 days prior to KAWC's issuance of any notes or debentures that have been authorized herein, KAWC shall notify the Commission in writing of the proposed issuance. In this notice, KAWC's President and Treasurer shall certify under oath the amount of the issuance and that the debt issuance does not exceed the total amount authorized in this Order. 4. For all securities or evidences of indebtedness that have a term exceeding two years and that are issued under the Financial Services Agreement's borrowing program, KAWC shall file a report detailing the terms and conditions of the particular
securities issued. It shall include an analysis showing that the interest rate for the securities was the most reasonable under the circumstances at the time of the issuance.
|
2015-00400
|
1/19/2016
|
20160119_PSC_ORDER.pdf
|
2014-00371
|
1/20/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S RENOTICE OF INFORMAL CONFERENCE
|
2015-00358
|
1/20/2016
|
20160120_PSC_ORDER.pdf
|
2015-00039
|
1/20/2016
|
20160120_PSC_ORDER.pdf
|
2014-00372
|
1/20/2016
|
20160120_PSC_ORDER.pdf
|
2014-00371
|
1/21/2016
|
PSC_ORDER
Order Entered: 1. The Trustee's Motion for Rehearing and Supplemental Motion for Rehearing are granted for the limited purposes of considering the legal issues as described in this Order. 2. A ruling on the merits of the Trustee's Motion for Intervention shall be deferred.
3. The Trustee shall file his brief addressing the issues identified in this Order on or before February 4, 2016. 4. BCSD, as receiver, and the AG may file a response brief to the Trustee on or before February 18, 2016. 5. Nothing contained herein shall prevent the Commission from entering
further Orders in this matter.
|
2014-00255
|
1/21/2016
|
PSC_ORDER
Order Entered: Atmos is authorized to negotiate and execute, through the end of its 2016
fiscal year, a term loan for up to five years in an amount not to exceed $200 million with
a variable rate.
2. The proceeds from the transactions authorized herein shall be used only
for the lawful purposes set out in the application.
3. Atmos shall agree only to such terms and prices that are consistent with
the parameters set out in its application.
4. Atmos shall, within 30 days from the date of closing, file with this
Commission a statement setting forth the date or dates of implementation of the term
loan authorized herein, the interest rate, and all fees and expenses, including
underwriting discounts or commissions or other compensation.
|
2015-00384
|
1/21/2016
|
PSC_ORDER
Order Entered: The rates proposed by Atmos and set forth in the Appendix to this Order
are approved for final meter readings on and after February 1, 2016.
2. Within 20 days of the date of this Order, Atmos shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2015-00424
|
1/21/2016
|
PSC_ORDER
Order Entered: The rate proposed by LG&E and set forth in the Appendix to this Order is
approved for gas supplied by LG&E on and after February 1, 2016.
2. Within 20 days of the date of this Order, LG&E shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2015-00429
|
1/21/2016
|
PSC_ORDER
Order Entered: Duke Energy is granted a CPCN that authorizes it to bid on a franchise
offered by the city of Williamstown, Kentucky, for natural gas transmission and
distribution service.
2. If Duke Energy is not the successful bidder, Duke Energy shall, within ten
days of the award of the franchise at issue, file with the Commission a written notice
stating that Duke Energy was not the successful bidder.
3. If Duke Energy is the successful bidder. Duke Energy shall, within ten
days of the award of the franchise at issue, file with the Commission a copy of the
executed franchise agreement and a statement disclosing the amount of the initial
franchise fee.
4. If Duke Energy is the successful bidder. Duke Energy shall, within ten
days of an increase or decrease in the amount of the initial franchise fee set forth in the
franchise agreement, file with the Commission documentation setting forth the revised
fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00049
|
1/21/2016
|
20160121_PSC_ORDER.pdf
|
2015-00416
|
1/21/2016
|
20160121_DATA_REQUEST.pdf
Data Request
|
2015-00312
|
1/25/2016
|
20160125_DATA_REQUEST.pdf
Data Request
|
2015-00355
|
1/25/2016
|
20160125_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2015-00311
|
1/25/2016
|
20160125_PSC_ORDER.pdf
|
2016-00029
|
1/26/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Muhlenberg County Water District No. 3
|
2015-00279
|
1/26/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Big Sandy Rural Electric Cooperative Corporation
|
2015-00337
|
1/26/2016
|
PSC_ORDER
Final Order Entered: 1 . The Applicant is granted a Certificate of Public Convenience and Necessity to construct a wireless telecommunications facility. The proposed facility consists of a monopole antenna tower not to exceed 160 feet in height, with attached antenna, and is to be located at 303 South Way, Bowling Green, Warren County, Kentucky. The coordinates for the proposed facility are North Latitude 36° 59' 12.4 7" by
West Longitude 86° 27' 32.72". 2. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2015-00349
|
1/26/2016
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Navitas KY is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered by Navitas on and after February 1, 2016. 3. Within 20 days of the date of this Order, Navitas KY shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2015-00427
|
1/27/2016
|
PSC_ORDER
Order Entered: Movant's motion for confidential protection of exhibit 5 to its application is
granted.
2. Pursuant to KRS 61.878, the information for which Movant requests
confidential protection shall not be placed in the public record or made available for
public inspection for an indefinite period of time, or until further Order of the
Commission.
3. Use of the materials in question in any Commission proceeding shall be in
compliance with 807 KAR 5:001, Section 13(9).
4. Movant shall inform the Commission if the materials In question become
publicly available or no longer qualify for confidential treatment.
|
2014-00423
|
1/27/2016
|
PSC_ORDER
Order Entered: Duke Kentucky's motion for confidential protection for the attachments to
Its responses to Staffs Fourth Request, Items 6 and 9, Is granted.
2. The materials set forth In the attachments to Duke Kentucky's responses
to Staffs Fourth Request, Items 6 and 9, shall not be placed In the public record or
made available for public Inspection for a period of ten years, or until further Orders of
this Commission.
3. Use of the materials In question In any Commission proceeding shall be In
compliance with 807 KAR 5:001, Section 13(9).
4. Duke Kentucky shall Inform the Commission If the materials In question
become publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to Inspect materials granted
confidential treatment by this Order and the period during which the materials have
been granted confidential treatment has not run, then Duke Kentucky shall have 20
days from receipt of written notice of the request to demonstrate that the materials still
fall within the exclusions from disclosure requirements established In KRS 61.878. If
|
2015-00187
|
1/27/2016
|
PSC_ORDER
Order Entered: GoGo shall have until January 22, 2016, to submit responses to Commission Staff's First Request for Information.
|
2015-00310
|
1/27/2016
|
PSC_ORDER
Order Entered: that the time in which the Commission shall
render its decision on the application is extended an additional 60 days, pursuant to
KRS 278.020(6), up to and including April 7, 2016.
|
2015-00383
|
1/27/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Frontier are denied. 2. The rates set forth in the Appendix to this Order are approved for final
meter readings by Frontier on and after February 1, 2016. 3. Within 20 days of the date of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. Frontier shall provide detailed discussions of its efforts to decrease the incidence of gas loss on its system, as well as any updates to projections for when such losses are expected to decrease to 5 percent or below, with every future application in
which gas cost recovery is proposed with no L&U limit.
|
2015-00425
|
1/27/2016
|
20160127_PSC_ORDER.pdf
|
2015-00194
|
1/27/2016
|
20160127_PSC_ORDER01.pdf
|
2015-00194
|
1/27/2016
|
20160127_PSC_ORDER02.pdf
|
2015-00194
|
1/27/2016
|
20160127_PSC_ORDER.pdf
|
2015-00152
|
1/28/2016
|
PSC_ORDER
Order Entered: 1. Within ten days of the date of this Order, Complainant shall file responses to Staff's Initial Request. 2. If no response is received within ten days of the date of this Order, this case shall be dismissed with prejudice without further Order.
|
2015-00184
|
1/28/2016
|
PSC_ORDER
Order Entered: 1. Within ten days of the date of this Order, Complainant shall file responses to Staff's Initial Request. 2. If no response is received within ten days of the date of this Order, this case will be dismissed with prejudice without further Order.
|
2015-00185
|
1/28/2016
|
PSC_ORDER
Order Entered: 1. Within ten days of the date of this Order, Complainant shall file responses to Staff's Initial Request. 2. If no response is received within ten days of the date of this Order, this case will be dismissed with prejudice without further Order.
|
2015-00186
|
1/28/2016
|
PSC_ORDER
Final Order Entered: 1. The proposed merger between Graves District and Sedalia District is approved, subject to the conditions set forth in ordering paragraphs 2 through 12, as of the date of this Order. 2. The name of the resulting district of this merger shall be "Graves County
Water District." 3. The current members of the Graves District board of commissioners shall, in accordance with KRS 74.363(2), continue to serve as members of the board of commissioners of the resulting district for one year from the date of this Order. 4. No later than one year from the date of this Order, Graves District shall file documentation of compliance with KRS 74.363(3). which requires appointments to be made to its board of commissioners with initial terms of two years for approximately one-third of the commissioners, three years for approximately one-third of the
commissioners, and four years for the remaining commissioners. 5. Graves District shall establish two divisions. Division 1 shall contain the
customers of Graves District's current service territory. Division 2 shall contain the customers of Sedalia District's current service territory.
6. Within 30 days of the date of this Order, the resulting district of this merger shall file an adoption notice in accordance with 807 KAR 5:011, Section 11, adopting, ratifying, and making its own the rates, rules, classifications, and administrative regulations of Graves District and Sedalia District in effect at the time of the merger.
|
2015-00296
|
1/28/2016
|
PSC_ORDER
Order entered: LG&E's motion to amend its application is granted.
2. The GLT rates in the Appendix to this Order are approved for service
rendered by LG&E on and after the date of this Order.
3. LG&E's proposal to include the replacement of Aldyl-A pipe and services
in its GLT program is approved.
4. Within 20 days of the date of this Order, LG&E shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates and tariff revisions approved herein and reflecting that they
were approved pursuant to this Order.
|
2015-00360
|
1/28/2016
|
PSC_ORDER
Order Entered: The Applicant shall file a copy of the final decisions regarding the pending
FAA and KAZC applications for the proposed construction within ten days of receiving
the decisions.
3. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
4. Documents filed, if any, in the future pursuant to ordering paragraphs 2
and 3 herein shall reference this case number and shall be retained in the utility's
general correspondence file.
|
2015-00369
|
1/28/2016
|
PSC_ORDER
Commission Staff's Notice of Informal Conference
|
2015-00389
|
1/28/2016
|
PSC_ORDER
Order Entered: Coalfields Telephone's request for deviation from the filing requirement of
807 KAR 5:001, Section 15(2)(e), is granted.
2. Coalfields Telephone's application is deemed filed as of the date of this
Order.
|
2016-00037
|
1/28/2016
|
PSC_ORDER
Order Entered: 1. This proceeding is established to investigate the reasonableness of the proposed tariff DSM-11. 2. The proposed tariff DSM-11 is suspended for five months from February 1, 2016, up to and including June 30, 2016.
|
2016-00056
|
1/28/2016
|
20160128_DATA_REQUEST.pdf
Data Request
|
2015-00364
|
1/29/2016
|
PSC_ORDER
Order Entered: February 2, 2016 hearing in this matter is indefinitely suspended.
|
2015-00353
|
1/29/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00413
|
1/29/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.25 per 1,000 gallons is approved. 2. Harrison County's proposed rates, as set forth in Appendix B to this Order, are approved for services rendered on and after January 1, 2016. 3. Within 20 days of the date of this Order, Harrison County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00028
|
1/29/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Cincinnati Bell Telephone Company, LLC
|
2016-00034
|
1/29/2016
|
PSC_ORDER
Order Entered: 1 . This proceeding is established to investigate the reasonableness of the seven proposed Service Agreements. 2. The Service Agreements fi led in TFS2015-00781 , TFS2015-00782, TFS2015-00783, TFS2015-00784, and TFS2015-00785, which were all filed on
December 16, 2015, are suspended for five months from January 15, 2016, up to and including June 14, 2016. 3. The Service Agreement filed in TFS2016-00012, which was filed on January 11 , 2016, is suspended for five months from February 10, 2016, up to and including July 9, 2016. 4. The Service Agreement filed in TFS2016-00019, which was filed on January 19, 2016, is suspended for five months from February 18, 2016, up to and including July 17, 2016. 5. Nothing shall prevent the Commission from issuing further orders prior to the end of the suspension periods.
|
2016-00052
|
1/29/2016
|
PSC_ORDER
Order Entered: Kenergy is to satisfy the matters complained of or file a written answer to the complaint within ten days of the date of service of this Order.
|
2016-00055
|
1/29/2016
|
20160129_DATA_REQUEST.pdf
Data Request
|
2015-00382
|
2/1/2016
|
STAFF_REPORT
NOTICE OF FILING OF COMMISSION STAFF REPORT
|
2015-00331
|
2/1/2016
|
20160201_PSC_ORDER.pdf
|
2016-00059
|
2/2/2016
|
PSC_ORDER
Order Entered: 1 . Bush Gardens' request for an informal conference is granted. 2. An informal conference shall be held on February 9, 2016, at
1:30 p.m. Eastern Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky.
|
2015-00306
|
2/2/2016
|
DATA_REQUEST
Commission Staff's Initial Request for Information to Duke Energy Kentucky, Inc.
|
2015-00309
|
2/2/2016
|
PSC_ORDER
Order Entered: The Applicant Is granted a Certificate of Public Convenience and
Necessity to construct a wireless telecommunications facility. The proposed facility
consists of a self-supporting antenna tower not to exceed 360 feet In height, with
attached antenna, and Is to be located at Middle Fork, Salyersvllle, Magoffin County,
Kentucky. The coordinates for the proposed facility are North Latitude 37° 38' 9.93" by
West Longitude 83° 9' 36.92".
2. The Applicant shall file a copy of the final decisions regarding the pending
FAA and KAZC applications for the proposed construction within ten days of receiving
the decisions.
3. The Applicant shall Immediately notify the Commission In writing. If, after
the antenna tower Is built and utility service Is commenced, the tower Is not used for a
period of three months In the manner authorized by this Order.
4. Documents filed. If any. In the future pursuant to ordering paragraphs 2
and 3 herein shall reference this case number and shall be retained In the utility's
general correspondence file.
|
2015-00362
|
2/2/2016
|
PSC_ORDER
Final Order Entered: 1 . North Central is granted a Certificate of Public Convenience and Necessity to construct new facilities as set forth in its application and as described in this order. 2. Should the costs of the construction authorized herein exceed by more than 10 percent the estimated costs contained in the application, North Central shall immediately notify the Commission in writing of the adjustment and include an
explanation of the additional costs for the Commission's approval. 3. As provided for in this Order, North Central shall maintain records that
clearly and sufficiently document the proper allocation of costs for jurisdictional and nonjurisdictional services provided as a result of this construction project. 4. Any documents filed pursuant to ordering paragraph 2 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2015-00410
|
2/2/2016
|
PSC_ORDER
Order Entered: 1. No later than April 15, 2016, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings and recommendations regarding Wood Creek's requested rate adjustment. 2. No later than April 29, 2016, or 14 days after the date of the filing of the Commission Staff Report, whichever occurs earlier, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings and recommendations contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If a party requests a hearing or informal conference, then the party shall make the request in its written comments and state the reason why a hearing or informal conference is necessary. 4. If Commission Staff finds that Wood Creek's financial condition supports a higher rate than Wood Creek proposes or the assessment of an additional rate or charge not proposed in Wood Creek's application, Wood Creek in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the recommended additional rate or charge.
|
2015-00428
|
2/2/2016
|
20160202_PSC_ORDER.pdf
|
2015-00343
|
2/2/2016
|
20160202_PSC_ORDER.pdf
|
2015-00210
|
2/2/2016
|
20160202_PSC_ORDER.pdf
|
2015-00350
|
2/3/2016
|
PSC_ORDER
Order Entered: no later than five days from the date of this
Order, Columbia shall file a statement as to whether there are any material issues of
fact that warrant a hearing or whether this case may be submitted for adjudication
based on the existing record without a hearing.
By
|
2015-00084
|
2/3/2016
|
PSC_ORDER
Final Order Entered: 1. JSEWD is authorized to enter into the loan agreement with KRWFC to borrow no more than $470,000, with a term of 15 years and annual interest rates that vary from 1.95 percent to 3.8 percent per annum. 2. If the actual terms and conditions of the agreement with KRWFC differ from those set forth in its application, JSEWD shall, within 30 days of executing the loan agreement, file with the Commission loan amortization schedules. 3. Within 30 days of executing the proposed agreement, JSEWD shall file a written statement with the Commission setting forth the date on which the agreement was entered, the actual interest rates, and the principal amount. 4. The proceeds from the KRWFC loan authorized herein shall be used only for the lawful purposes specified in JSEWD's application. 5. Any documents filed pursuant to ordering paragraphs 2 and 3 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2015-00397
|
2/3/2016
|
20160203_PSC_ORDER.pdf
|
2015-00039
|
2/4/2016
|
PSC_ORDER
Final Order Entered: 1. Carrollton's Second Motion to Dismiss is granted. 2. Carrollton's Motion to Schedule Depositions is denied as moot.
3. This matter shall be closed and removed from the Commission's docket.
|
2015-00178
|
2/5/2016
|
PSC_ORDER
Order Entered: Order Entered: 1. East Kentucky Power Cooperative ("East Kentucky") shall appear in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, on April 7, 2016, at 9:00a.m., Eastern Daylight Time, to submit itself to examination on the application of its Fuel Adjustment Clause ("FAC") from May 1, 2015, through October 31, 2015. Neither opening statements nor summaries of pre-filed testimony will be permitted. 2. Not less than seven days and no more than 21 days prior to the scheduled hearing, East Kentucky shall publish in a newspaper of general circulation in each area in which it serves notice of the purpose, time, place, and date of the scheduled hearing. In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." 3. East Kentucky shall file with the Commission no later than April 5, 2016, proof of publication of its notice for the hearing. 4. The official record of the proceeding shall be by video only. 5. a. The information requested in the Appendix to this Order is due no later than 14 days from the date of this Order. Responses to requests for information in paper medium shall be appropriately bound, tabbed and indexed. Responses shall include the name of the witness responsible for responding to the questions related to the information provided, with an original in paper medium and an electronic version to the Commission.
|
2016-00002
|
2/5/2016
|
PSC_ORDER
Order Entered: Order Entered: 1. Big Rivers Electric Corporation ("Big Rivers") shall appear in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, on April 7, 2016, at 9:00 a.m., Eastern Daylight Time, to submit itself to examination on the application of its Fuel Adjustment Clause ("FAC") from May 1, 2015, through October 31, 2015. Neither opening statements nor summaries of pre-filed testimony will be permitted. 2. Not less than seven days and no more than 21 days prior to the scheduled hearing, Big Rivers shall publish in a newspaper of general circulation in each area in which it serves notice of the purpose, time, place, and date of the scheduled hearing. In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." 3. Big Rivers shall file with the Commission no later than April 5, 2016, proof of publication of its notice for the hearing. 4. The official record of the proceeding shall be by video only. 5. a. The information requested in the Appendix to this Order is due no later than 14 days from the date of this Order. Responses to requests for information in paper medium shall be appropriately bound, tabbed and indexed. Responses shall include the name of the witness responsible for responding to the questions related to the information provided, with an original in paper medium and an electronic version to the Commission.
|
2016-00006
|
2/5/2016
|
PSC_ORDER
Order Entered: 1. A public hearing shall be held on April 7, 2016, at 9:00 a.m. , Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, to examine the application of the Fuel Adjustment Clause of Big Sandy Rural Electric Cooperative Corporation ("Big Sandy") from May 1, 2015, through October 31, 2015. If no interested party files written notice of its intent to attend this hearing with the Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall be considered submitted for decision based on the evidence in the record. 2. Big Sandy shall file with the Commission, no later than 21 days from the date of this Order, an affidavit attesting to its compliance or noncompliance with the requirements of 807 KAR 5:056. 3. All documents that Big Sandy filed with the Commission pursuant to 807 KAR 5:056, Section 1 (7) and (9), during the period under review are incorporated by reference into the record of this proceeding. 4. Big Sandy shall publish the following notice no less than seven days or more than 21 days prior to the public hearing in a newspaper of general circulation in its service areas or in a trade publication or newsletter going to all customers. Big Sandy shall also file an Affidavit of Publication of Hearing Notice with the Commission no later than April 5, 2016. 5. The official record of the proceeding shall be by video only. 6. Any request for intervention must be filed by March 4, 2016.
|
2016-00007
|
2/5/2016
|
PSC_ORDER
Order Entered: 1. A public hearing shall be held on April 7, 2016, at 9:00 a.m., Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, to examine the application of the Fuel Adjustment Clause of Blue Grass Energy Cooperative Corporation ("Blue Grass") from May 1, 2015, through October 31, 2015. If no interested party files written notice of its intent to attend this hearing with the Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall be considered submitted for decision based on the evidence in the record. 2. Blue Grass shall file with the Commission, no later than 21 days from the date of this Order, an affidavit attesting to its compliance or noncompliance with the requirements of 807 KAR 5:056. 3. All documents that Blue Grass filed with the Commission pursuant to 807 KAR 5:056, Section 1 (7) and (9), during the period under review are incorporated by reference into the record of this proceeding. 4. Blue Grass shall publish the following notice no less than seven days or more than 21 days prior to the public hearing in a newspaper of general circulation in its service areas or in a trade publication or newsletter going to all customers. Blue Grass shall also file an Affidavit of Publication of Hearing Notice with the Commission no later than April 5, 2016. 5. The official record of the proceeding shall be by video only. 6. Any request for intervention must be filed by March 4, 2016.
|
2016-00008
|
2/5/2016
|
PSC_ORDER
Order Entered: 1. A public hearing shall be held on April 7, 2016, at 9:00 a.m., Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, to examine the application of the Fuel Adjustment Clause of Clark Energy Cooperative, Inc. ("Clark Energy") from May 1, 2015, through October 31, 2015. If no interested party files written notice of its intent to attend this hearing with the Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall be considered submitted for decision based on the evidence in the record. 2. Clark Energy shall file with the Commission, no later than 21 days from the date of this Order, an affidavit attesting to its compliance or noncompliance with the requirements of 807 KAR 5:056. 3. All documents that Clark Energy filed with the Commission pursuant to 807 KAR 5:056, Section 1 (7) and (9), during the period under review are incorporated by reference into the record of this proceeding. 4. Clark Energy shall publish the following notice no less than seven days or more than 21 days prior to the public hearing in a newspaper of general circulation in its service areas or in a trade publication or newsletter going to all customers. Clark Energy shall also file an Affidavit of Publication of Hearing Notice with the Commission no later than April 5, 2016. 5. The official record of the proceeding shall be by video only. 6. Any request for intervention must be filed by March 4, 2016.
|
2016-00009
|
2/5/2016
|
PSC_ORDER
Order Entered: 1. A public hearing shall be held on April 7, 2016, at 9:00 a.m., Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, to examine the application of the Fuel Adjustment Clause of Cumberland Valley Electric, Inc. ("Cumberland Valley") from May 1, 2015, through October 31, 2015. If no interested party files written notice of its intent to attend this hearing with the Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall be considered submitted for decision based on the evidence in the record. 2. Cumberland Valley shall file with the Commission, no later than 21 days from the date of this Order, an affidavit attesting to its compliance or noncompliance with the requirements of 807 KAR 5:056. 3. All documents that Cumberland Valley filed with the Commission pursuant to 807 KAR 5:056, Section 1 (7) and (9), during the period under review are incorporated by reference into the record of this proceeding. 4. Cumberland Valley shall publish notice no less than seven days or more than 21 days prior to the public hearing in a newspaper of general circulation in its service areas or in a trade publication or newsletter going to all customers. Cumberland Valley shall also file an Affidavit of Publication of Hearing Notice with the Commission no later than April 5, 2016. 5. The official record of proceeding shall be video only. 6. Any request for intervention must be filed by March 4, 2016.
|
2016-00010
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00011
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00012
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00013
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00014
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00015
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00016
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00017
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00018
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00019
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00020
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00021
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00022
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00023
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00024
|
2/5/2016
|
PSC_ORDER
Order Entered; A public hearing shall be held on April 7, 2016, at 9:00 a.m.. Eastern
Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause
from May 1, 2015, through October 31,
2015. If no interested party files written notice of its intent to attend this hearing with the
Commission by April 5, 2016, this public hearing shall be cancelled and the matter shall
be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Section 1(7) and (9), during the period under review are incorporated by
reference into the record of this proceeding.
shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00025
|
2/5/2016
|
20160205_PSC_ORDER.pdf
|
2016-00040
|
2/5/2016
|
20160205_PSC_ORDER.pdf
|
2015-00418
|
2/5/2016
|
20160205_PSC_ORDER.pdf
|
2016-00001
|
2/5/2016
|
20160205_PSC_ORDER.pdf
|
2016-00003
|
2/5/2016
|
20160205_PSC_ORDER.pdf
|
2016-00004
|
2/5/2016
|
20160205_PSC_ORDER01.pdf
|
2015-00418
|
2/5/2016
|
20160205_PSC_ORDER.pdf
|
2016-00005
|
2/5/2016
|
20160205_PSC_ORDER02.pdf
|
2015-00418
|
2/5/2016
|
20160205_PSC_ORDER.pdf
|
2015-00227
|
2/8/2016
|
PSC_ORDER
Order Entered: KU Is granted a CPCN that authorizes It to bid on a franchise offered by
the city of Mt. Olivet, Kentucky, for electric transmission and distribution service.
2. If KU Is not the successful bidder, KU shall, within ten days of the award of
the franchise at Issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU Is the successful bidder, KU shall, within ten days of the award of the
franchise at Issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the Initial franchise fee.
4. If KU Is the successful bidder, KU shall, within ten days of an Increase or
decrease In the amount of the initial franchise fee set forth In the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities In said city.
|
2016-00058
|
2/8/2016
|
20160208_PSC_ORDER.pdf
|
2015-00343
|
2/8/2016
|
20160208_PSC_ORDER.pdf
(Copied from Case: 2016-00070 )Order
|
2015-00343
|
2/8/2016
|
20160208_PSC_ORDER.pdf
|
2016-00070
|
2/9/2016
|
PSC_ORDER
Order Entered nunc pro tunc, that: 1. The Opening Order, at page 2, numbered paragraph 2, is amended as follows: The Service Agreements attached hereto and incorporated herein as 2016-00052-A, 2016-00052-B, 2016-00052-C, 2016-00052-D, and 2016-00052-E were all filed on December 16, 2015, and are suspended for five months from January 15, 2016, up to and including June 14, 2016. 2. The Opening Order, at page 2, numbered paragraph 3, is amended as follows: The Service Agreement attached hereto and incorporated herein as 2016-00052-F was filed on January 11 , 2016, and is suspended for five months from February 10, 2016, up to and including July 9, 2016. 3. The Opening Order, at page 2, numbered paragraph 4, is amended as follows: The Service Agreement attached hereto and incorporated herein as 2016-00052-G was filed on January 19, 2016, and is suspended for five months from February 18, 2016, up to and including July 17, 2016. 4. All other provisions of the Opening Order not in conflict with this Order shall remain in full force and effect.
|
2016-00052
|
2/9/2016
|
PSC_ORDER
Order Entered: KU Is granted a GPCN that authorizes It to bid on a franchise offered by
the city of Mentor, Kentucky, for electric transmission and distribution service.
2. If KU Is not the successful bidder, KU shall, within ten days of the award of
the franchise at Issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU Is the successful bidder, KU shall, within ten days of the award of the
franchise at Issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the Initial franchise fee.
4. If KU Is the successful bidder, KU shall, within ten days of an Increase or
decrease In the amount of the Initial franchise fee set forth In the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities In said city.
|
2016-00069
|
2/9/2016
|
20160209_PSC_ORDER.pdf
|
2016-00026
|
2/9/2016
|
20160209_PSC_ORDER.pdf
|
2016-00027
|
2/10/2016
|
STAFF_REPORT
NOTICE OF FILING OF COMMISSION STAFF REPORT
|
2015-00341
|
2/10/2016
|
PSC_ORDER
Order Entered: The AMRP rates in the Appendix to this Order are approved for service
rendered by Columbia on and after December 31, 2015.
2. Within 20 days of the date of this Order, Columbia shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2015-00342
|
2/10/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2015-00347
|
2/10/2016
|
PSC_ORDER
Final Order Entered: 1. The proposed acquisition of the water operation assets of Overland by Big Sandy District is approved, subject to the conditions set forth in ordering paragraphs 2 through 8, as of the date of this Order. 2. Big Sandy District shall notify the Commission of the purchase of Overland's water operations assets within ten days of the completion thereof. 3. Big Sandy District shall establish two divisions. Division 1 shall contain the customers of Big Sandy District prior to this approval. Division 2 shall contain the former customers of Overland.
4. Within 30 days of the date of this Order, Big Sandy District shall file an adoption notice in accordance with 807 KAR 5:011, Section 11, adopting, ratifying, and making its own the rates, rules, classifications, and administrative regulations of Overland at the time of the acquisition. The rates, rules, classifications, and administrative regulations of Overland adopted by Big Sandy District shall apply to the new Division 2. 5. Within 30 days of the date of this Order, Big Sandy District shall file with the Commission the journal entries that will be used to record the proposed acquisition. 6. The recording of the acquisition adjustment and its amortization are approved for accounting purposes only. The ratemaking treatment of the adjustment and any associated costs shall be deferred until Big Sandy District's next rate case proceeding.
|
2015-00351
|
2/10/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to B&H Gas Company and B&S Oil and Gas Company
|
2015-00367
|
2/10/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.27 per 1,000 gallons is
approved.
2. Union County's proposed rates, as set forth in Appendix B to this Order,
are approved for services rendered by Union County on and after January 1, 2016.
3. Within 20 days of the date of this Order, Union County shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00046
|
2/11/2016
|
PSC_ORDER
Final Order Entered: 1. EKPC is authorized to establish a regulatory asset as described herein for the undepreciated balance of the Dale Station assets, excluding Projects 5 and 10, which are currently recovered through EKPC's environmental surcharge. 2. EKPC shall amortize the regulatory asset authorized in Ordering paragraph 1 over 42 months after December 31, 2015, as proposed in its application. 3. EKPC shall establish a separate regulatory asset for Projects 5 and 10 as described herein, which shall be deferred and considered for recovery in EKPC's next base rate case. 4. EKPC shall be allowed to record a return, calculated in the same manner as in EKPC's environmental surcharge mechanism, on the unamortized balance of Projects 5 and 10 and the accumulated insurance costs incurred. 5. The regulatory assets approved herein are for accounting purposes only. 6. EKPC shall remove Projects 5 and 10 from its environmental surcharge mechanism effective with the date of this Order. 7. EKPC shall file annually an updated report related to Projects 5 and 10, including the balance of the regulatory asset as of December 31, 2015, and the carrying cost and insurance cost incurred after 2015. Carrying charges are to be calculated on the prior-month ending balance beginning with the December 31, 2015 ending balance of the regulatory asset.
|
2015-00302
|
2/11/2016
|
STAFF_REPORT
Notice of Filing of Corrected Signature Page to Commission Staff Report
|
2015-00331
|
2/11/2016
|
PSC_ORDER
Order Entered: 1. Farmdale District is not required to satisfy or answer Complainant's complaint. 2. Complainant shall file any amendment to its complaint within 20 days of the date of this Order. 3. If Complainant files an amended complaint, the amended complaint must request relief which Complainant has not already received. 4. If the complaint is not amended within 20 days of the date of this Order or within any extension of this time that the Commission may grant, the complaint shall be dismissed without further Order. 5. If an amended complaint is timely filed but does not request relief that the Complainant has not already received, the complaint shall be dismissed as moot.
|
2015-00357
|
2/11/2016
|
PSC_ORDER
Order Entered: 1. The record from Case No. 2014-00342, including the post case referenced correspondence file for that case, is incorporated by reference into the record of the instant case. 2. Mountain District shall file with the Commission, no later than 14 days from the date of this Order, the original and ten copies of the information listed in the Appendix to this Order. 3. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided. b. Each response shall be answered under oath, or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of the person's knowledge, information and belief formed after a reasonable inquiry. c. Mountain District shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material aspect. d. For any request to which Mountain District fails or refuses to furnish all or part of the requested information, the party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2016-00062
|
2/11/2016
|
PSC_ORDER
Final Order Entered: 1. EKPC's motion for a 15-day extension of time is granted. 2. EKPC shall file the journal entries reflecting how the Bluegrass Station transaction was recorded no later than February 12, 2016. 3. This matter is closed and removed from the Commission's docket.
|
2016-00071
|
2/11/2016
|
20160211_PSC_ORDER.pdf
|
2016-00073
|
2/12/2016
|
20160212_PSC_IC_NOTICE.pdf
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2014-00267
|
2/12/2016
|
PSC_ORDER
The water service rates requested by Harrison County are denied.
2. The water service rates set forth in Appendix Bto this Order are approved
for services rendered by Harrison County on and after the date of this Order.
3. Within 20 days of the date of this Order, Harrison County shall file revised
tariff sheets with the Commission, using the Commission's electronic Tariff Filing
System, containing the rates set forth in Appendix B to this Order.
|
2015-00308
|
2/12/2016
|
PSC_ORDER
Order Entered: 1. Jimmy Dalton shall file with the Commission, no later than 14 days from the date of this Order, the original and two copies of the information listed in the Appendix to this Order, with a copy to Western Pulaski District. Mr. Dalton's failure to file the requested information in a timely manner shall be considered as notice that he does not wish to be considered for appointment to Western Pulaski District Board. 2. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and two copies to the Commission. b. Each response shall be answered under oath, or, for representatives of a public or private corporation or a partnership or association or a
governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of the person's knowledge, information and belief formed after a reasonable inquiry. c. Mr. Dalton shall make timely amendment to any prior response if he obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material aspect.
|
2015-00352
|
2/12/2016
|
PSC_ORDER
Final Order Entered: The EAS traffic agreement is approved.
|
2015-00430
|
2/12/2016
|
PSC_ORDER
Order Entered: Nathan Edward Rainwater shall advise the Commission in writing by February 24, 2016, whether his complaint against Kenergy
has been resolved to his satisfaction.
|
2016-00055
|
2/12/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Sections 6 and 7, related to the service and filing of documents. 4. The Attorney General shall serve any request for information to Mountain District no later than seven days from the date of this Order. 5. Mountain District shall file with the Commission and serve upon all parties of record its responses to the Attorney General's request for information no later than 21 days from the date of this Order. 6. Mountain District's responses to the Attorney General's request shall comply with ordering paragraph 3 of the February 11, 2016 Order. 7. All provisions of the February 11, 2016 Order that are not in conflict with the terms of this Order shall remain in effect. 8. Nothing contained herein shall prevent the Commission from entering further Orders in this matter.
|
2016-00062
|
2/12/2016
|
PSC_ORDER
Order Entered: The presentation scheduled to be held February 23-24, 2016, in Central
City, Kentucky, is accredited and approved for water district commissioners to receive a
maximum of 12 credit hours of water district management training.
2. Russ shall retain a record of all water district commissioners attending the
accredited and approved presentations.
3. No later than 30 days after the entry of this Order, Russ shall file with the
Commission:
a. A sworn statement attesting that the accredited instruction was
performed:
b. A description of any changes in the presenters or the curriculum
that occurred after Russ's application;
c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended;
d. A copy of any written material given to water commissioners
attending the presentations; and
e. Documents indicating whether the Kentucky Board of Certification
of Water Treatment and Distribution System Operators approved the training for
continuing education credit.
|
2016-00066
|
2/12/2016
|
20160212_DATA_REQUEST.pdf
Data Request
|
2015-00368
|
2/12/2016
|
20160212_PSC_ORDER.pdf
|
2015-00039
|
2/12/2016
|
20160212_PSC_ORDER.pdf
|
2015-00277
|
2/15/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Atmos Energy Corporation
|
2015-00298
|
2/15/2016
|
PSC_ORDER
Final Order Entered: 1. The Stipulation is adopted and approved in its entirety as a complete resolution of all issues in this case. 2. In the event that Rhonda James, Lester "John" Collins, Toni Akers, or Mike Litafik assume the role as commissioner of Mountain District in the future, each as
a new Commissioner shall complete the mandatory new-commissioner training required pursuant to KRS 74.020(8)(a), and as a new commissioner shall, in addition to the mandatory training, complete an extra five hours of Commission accredited training within 12 months of his or her appointment. 3. Mountain District shall pay $500 as a civil penalty within 30 days of the date of this Order by cashier's check or money order payable to the Kentucky State Treasurer and mailed or delivered to the Office of General Counsel, Public Service Commission, 211 Sower Boulevard, P.O. Box 615, Frankfort, Kentucky 40602. 4. Upon payment of the $500 civil penalty, this case shall be closed and removed from the Commission's docket without further Order of the Commission.
|
2015-00353
|
2/15/2016
|
DATA_REQUEST
|
2016-00060
|
2/15/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Navitas KY, NG, LLC
|
2016-00065
|
2/15/2016
|
20160215_DATA_REQUEST.pdf
Data Request
|
2015-00398
|
2/16/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00084
|
2/16/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Conference Call
|
2015-00383
|
2/16/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00053
|
2/18/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2015-00100
|
2/18/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2015-00101
|
2/18/2016
|
PSC_ORDER
Order Entered: 1. Kentucky Power's motion to dismiss, or in the alternative, for summary judgment, is denied. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information shall be appropriately bound, tabbed and indexed, and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and an original and seven copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information that indicates the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2015-00260
|
2/18/2016
|
PSC_ORDER
Order Entered: 1. EKPC's motion to file supplemental testimony is granted, and the supplemental testimony is accepted for filing as of the date of this Order. 2. EKPC's motion to schedule an informal conference is granted. 3. EKPC's motion to suspend the procedural schedule is granted.
4. The date by which EKPC is to either request a hearing or submit the case for decision based on the record is suspended until further Order of the Commission. 5. An informal conference shall be held on Wednesday, March 2, 2016, at 1 :30 p.m. Eastern Standard Time at the Commission's offices at 211 Sower Boulevard, Frankfort, KY 40602.
|
2015-00281
|
2/18/2016
|
PSC_ORDER
Order Entered: 1. A hearing in this matter shall be held on Wednesday, March 2, 2016, beginning at 1 0:00 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, for the purpose of hearing evidence in this case.
2. Bush Gardens shall give notice of the hearing pursuant to KRS 424.300 and 807 KAR 5:076, Section 12. 3. Bush Gardens shall provide a copy of the public notice to the Commission on or before the date of the hearing. In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." 4. Bush Gardens shall file a list of its anticipated witnesses and a summary of their testimony no later than February 24, 2016. 5. Pursuant to KRS 278.360 and 807 KAR 5:001 Section 9(9)(a), the record of the formal hearing in this matter shall be by videotape only.
|
2015-00306
|
2/18/2016
|
20160218_PSC_ORDER.pdf
|
2016-00054
|
2/19/2016
|
20160219_PSC_IC_NOTICE.pdf
COMMISSION STAFF'S NOTICE OF CANCELLATION
OF INFORMAL CONFERENCE
|
2014-00267
|
2/19/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulation, 807 KAR 5:001 , Section 7, related to the service and filing of documents 4. Within seven days of entry of this Order, the Attorney General shall
provide his electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Attorney General in accordance with 807 KAR 5:001, Section 4(8)(b).
|
2015-00367
|
2/19/2016
|
PSC_ORDER
Final Order Entered: 1. Warren District is granted a CPCN to proceed with the proposed construction as set forth in its application. 2. Warren District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved shall be undertaken only with the prior approval of the Commission. 4. Warren District shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project. 5. Warren District is authorized to enter the proposed Assistance Agreement with KIA and, under the terms of that agreement, to borrow from KIA an amount not to exceed $1 ,090,050 to be repaid over a 20-year period at an interest rate of 3.0 percent per annum. 6. Within 30 days of executing its proposed Assistance Agreement with KIA, Warren District shall file with the Commission an executed copy of the Assistance Agreement. Warren District shall use $1,090,050 of the proceeds from the proposed Assistance Agreement with KIA only for the lawful purposes set forth in its application.
|
2016-00035
|
2/19/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Atmos Energy Corporation
|
2016-00052
|
2/19/2016
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and six copies to the Commission. b. Each response shall be answered under oath, or for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the
response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
e. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10), encrypt or redact the paper so that the personal information cannot be read.
|
2016-00063
|
2/19/2016
|
20160219_DATA_REQUEST.pdf
(Copied from Case: 2016-00070 )Data Request
|
2015-00343
|
2/19/2016
|
20160219_DATA_REQUEST.pdf
Data Request
|
2016-00070
|
2/19/2016
|
20160219_DATA_REQUEST.pdf
Data Request
|
2015-00343
|
2/22/2016
|
PSC_ORDER
Final Order Entered: 1. North Central is granted a Certificate of Public Convenience and Necessity to construct new facilities as set forth in its application and as described in this Order. 2. Should the costs of the construction authorized herein exceed by more than 10 percent the estimated costs contained in the application, North Central shall immediately notify the Commission in writing of the adjustment and include an
explanation of the additional costs for the Commission's approval. 3. As provided for in this Order, North Central shall maintain records that
clearly and sufficiently document the proper allocation of costs for jurisdictional and nonjurisdictional services provided as a result of this construction project. 4. Any documents filed pursuant to ordering paragraph 2 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2015-00409
|
2/22/2016
|
PSC_ORDER
Final Order Entered: 1. Cincinnati Bell is granted a CPCN that authorizes it to bid on a franchise offered by the city of Dry Ridge, Kentucky, for telephone service. 2. If Cincinnati Bell is not the successful bidder, Cincinnati Bell shall, within ten days of the award of the telephone franchise at issue, file with the Commission a written notice stating that Cincinnati Bell was not the successful bidder. 3. If Cincinnati Bell is the successful bidder, Cincinnati Bell shall, within ten days of the award of the telephone franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Cincinnati Bell is the successful bidder, Cincinnati Bell shall, within ten days of an increase or decrease in the amount of the initial telephone franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00034
|
2/22/2016
|
PSC_ORDER
Order Entered: The presentation at the KRWA 2016 Management Conference held
February 17-18, 2016, In Bowling Green, Kentucky, Is accredited and approved for a
maximum of 12 credit hours of water district management training.
2. KRWA shall retain a record of all water district commissioners attending
the accredited and approved presentations.
3. No later than 30 days after each presentation, KRWA shall file with the
Commission:
a. A sworn statement attesting that the accredited Instruction was
performed;
b. A description of any changes In the presenters or the proposed
curriculum that occurred after KRWA's application;
c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended;
d. A copy of any written material given to water commissioners
attending the presentations; and
e. Documents Indicating whether the Kentucky Board of Certification
of Water Treatment and Distribution System Operators and the Kentucky Board of
Certification of Wastewater System Operators approved the training for continuing
education credit.
|
2016-00036
|
2/22/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.21 per 1,000 gallons is
approved.
2. Dexter-Almo's proposed rates, as set forth in Appendix B to this Order, are
approved for services rendered by Dexter-Almo on and after January 1, 2016.
3. Within 20 days of the date of this Order, Dexter-Almo shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
4. Dexter-Almo shall file its next purchased water adjustment between June
1, 2016, and July 20, 2016.
|
2016-00064
|
2/22/2016
|
20160222_PSC_ORDER.pdf
|
2015-00418
|
2/23/2016
|
PSC_ORDER
Final Order Entered: 1. The presentations scheduled to be held March 14, 2016, in Morehead, Kentucky, and March 16, 2016, in Maysville, Kentucky, are each accredited and approved for water district commissioners to receive a maximum of six credit hours of water district management training. 2. RCAP shall retain a record of all water district commissioners attending the accredited and approved presentations.
3. No later than 60 days after the entry of this Order, RCAP shall file with the Commission: a. A sworn statement attesting that the accredited instruction was performed: b. A description of any changes in the presenters or the curriculum that occurred after RCAP's application; c. The name of each attending water district commissioner, his or her water district, and the number of hours that he or she attended; d. Documents demonstrating the Kentucky Board of Certification of Water Treatment and Distribution System Operators' approval of the training for continuing education credit.
|
2016-00074
|
2/24/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulation, 807 KAR 5:001 , Section 7, related to the service and filing of documents. 4. Within seven days of entry of this Order, the Attorney General shall
provide his electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Attorney General in accordance with 807 KAR 5:001, Section 4(8)(b).
|
2016-00077
|
2/24/2016
|
20160224_PSC_ORDER.pdf
|
2016-00027
|
2/25/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Johnny D. Pennington
|
2015-00260
|
2/25/2016
|
DATA_REQUEST01
Commission Staff's First Request for Information to Kentucky Power Company
|
2015-00260
|
2/25/2016
|
PSC_ORDER
Order Entered: 1. Within seven days of the date of this Order, Mr. Graham shall file a reply, if any, to the Applicant's response in opposition to Mr. Graham's request for intervention. 2. Upon the expiration of the seven-day period afforded to Mr. Graham for filing a reply, if any, his request for intervention shall stand submitted for a decision based on the record.
|
2015-00404
|
2/25/2016
|
20160225_DATA_REQUEST.pdf
Data Request
|
2015-00355
|
2/26/2016
|
DATA_REQUEST
Commission Staff's Initial Request for Information to Kentucky Utilities Company and Louisville Gas and Electric Company
|
2016-00063
|
2/26/2016
|
PSC_ORDER
Order Entered: 1 . Hardin No. 1's request for a deviation from the requirement of 807 KAR 5:001 , Section 7(1), regarding the filing of ten additional copies in paper medium for its application is granted. 2. Hardin No. 1, unless ordered otherwise, is permitted to hereafter file an original unbound and three additional copies in paper medium when filing a "paper," as the term is defined by 807 KAR 5:001, Section 1 (9), with the Commission in this proceeding. 3. Hardin No. 1's application in this case is accepted for filing as of the date of this Order.
|
2016-00075
|
2/26/2016
|
20160226_DATA_REQUEST.pdf
Data Request
|
2016-00040
|
2/26/2016
|
20160226_PSC_ORDER.pdf
|
2016-00026
|
2/26/2016
|
20160226_PSC_ORDER.pdf
|
2016-00027
|
2/29/2016
|
PSC_ORDER
Order Entered: 1. Bush Gardens is granted a deviation from the time requirement in 807 KAR 5:076, Section 12(4). 2. Bush Gardens shall provide notice of the hearing to its customers at its earliest opportunity. 3. All other provisions of the Commission's February 18, 2016 Order not in
conflict with this Order shall remain in full force and effect.
|
2015-00306
|
2/29/2016
|
PSC_ORDER01
Order Entered: A telephone line shall be established to receive public comments during
the March 2, 2016 hearing.
2. Public comments may be tendered during the March 2, 2016 hearing,
commencing at 10:00 a.m. Eastern Standard Time, through dialing (502) 782-2663 and
entering conference code 22633.
3. Public comments may also be tendered in person during the March 2,
2016 hearing or submitted in writing during the pendency of this case.
|
2015-00306
|
2/29/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2015-00358
|
2/29/2016
|
PSC_ORDER
Order Entered: The complaint of Nathan Edwin Rainwater against Kenergy Corp. is
dismissed with prejudice.
2. This matter shall be closed and removed from the Commission's docket.
|
2016-00055
|
2/29/2016
|
PSC_ORDER
Order Entered: The rates proposed by Columbia and set forth in the Appendix to this
Order are approved for billing for the March 2016 billing cycle beginning on March 1,
2016.
2. Columbia shall revise its GCA tariff and mechanism so that its ACA and
BA are calculated quarterly, effective with its GCA filing for the June 2016 billing cycle
as described herein.
3. Within 20 days of the date of this Order, Columbia shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates and ACA and BA mechanism revisions approved herein and
reflecting that they were approved pursuant to this Order.
|
2016-00060
|
2/29/2016
|
20160229_PSC_ORDER.pdf
|
2015-00418
|
2/29/2016
|
20160229_PSC_ORDER.pdf
|
2015-00364
|
2/29/2016
|
20160229_PSC_ORDER.pdf
|
2016-00061
|
3/1/2016
|
DATA_REQUEST
COMMISSION STAFF'S INITIAL REQUEST FOR INFORMATION
TO THOMAS RICHARD TRACKER AND SHANNON CHAPMAN TRACKER
|
2015-00269
|
3/1/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2015-00320
|
3/1/2016
|
DATA_REQUEST
COMMISSION STAFF'S SECOND REQUEST FOR INFORMATION
TO EAST KENTUCKY POWER COOPERATIVE. INC.
|
2016-00002
|
3/1/2016
|
DATA_REQUEST
COMMISSION STAFF'S SECOND REQUEST FOR INFORMATION
TO BIG RIVERS ELECTRIC CORPORATION
|
2016-00006
|
3/1/2016
|
PSC_ORDER
Order Entered: Coalfields Telephone is granted a Certificate of Public Convenience and
Necessity to construct new facilities as set forth in its application and as described in
this Order.
|
2016-00037
|
3/1/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2016-00080
|
3/1/2016
|
20160301_PSC_ORDER.pdf
|
2015-00280
|
3/1/2016
|
20160301_DATA_REQUEST.pdf
Data Request
|
2016-00005
|
3/1/2016
|
20160301_DATA_REQUEST.pdf
Data Request
|
2016-00004
|
3/1/2016
|
20160301_DATA_REQUEST.pdf
Data Request
|
2016-00003
|
3/1/2016
|
20160301_DATA_REQUEST.pdf
Data Request
|
2016-00001
|
3/1/2016
|
20160301_DATA_REQUEST.pdf
Data Request
|
2015-00382
|
3/1/2016
|
20160301_STAFF_REPORT.pdf
Staff Report
|
2014-00131
|
3/1/2016
|
20160301_PSC_ORDER.pdf
|
2016-00026
|
3/2/2016
|
PSC_ORDER
Order Entered: EKPC's motion to extend for 90 days, through May 28, 2016, the period of
abeyance is granted to the extent that the Commission shall take no action on EKPC's
application during that time period to allow the parties and Commission Staff to further
discuss the issues in this case.
2. The temporary suspension of the requirement in the PJM Integration
Order for EKPC to file a rate mechanism to flow back capacity market benefits to
customers shall continue during the period of abeyance, as extended by this Order.
3. EKPC shall file, on or before April 13, 2016, and at the end of the
extended period of abeyance, written reports summarizing the status of the efforts by
the parties and Commission Staff to reach a consensus on the issue of a flow-back rate
mechanism.
4. Nothing shall prevent the parties from filing documents or the Commission
from entering further Orders during the abeyance of this case.
|
2015-00358
|
3/2/2016
|
PSC_ORDER
Order Entered: This case is opened for the purpose of considering U.S. 60's motion for an
extension of time.
2. U.S. 60's motion for a 45-day extension of time within which to fulfil the
requirements set forth in numbered paragraph 2 to the Stipulation in Case No. 2015-
00037 is granted.
3. All other terms of the Commission's August 17, 2015 Order and the
Stipulation in Case No. 2015-00037 not in conflict with this Order shall remain in full
force and effect.
4. This case is closed and removed from the Commission's docket.
|
2016-00089
|
3/2/2016
|
20160302_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2015-00315
|
3/3/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2014-00255
|
3/3/2016
|
PSC_ORDER
Order Entered: that this case is dismissed with prejudice and
removed from the Commission's docket.
|
2015-00184
|
3/3/2016
|
PSC_ORDER
Order Entered: that this case is dismissed with prejudice and
removed from the Commission's docket.
|
2015-00185
|
3/3/2016
|
PSC_ORDER
Order Entered: that this case is dismissed with prejudice and
removed from the Commission's docket.
|
2015-00186
|
3/3/2016
|
PSC_ORDER
Order Entered: The water service rates requested by McKinney are denied.
2. The water service rates set forth in Appendix A to this Order are approved
for services rendered by McKinney on and after the date of this Order.
3. Within 20 days of the date of this Order, McKinney shall file revised tariff
sheets with the Commission, using the Commission's electronic Tariff Filing System,
containing the rates set forth in Appendix A to this Order.
4. In all future reporting periods, McKinney shall use the "PSG Approved
Service Life" set forth in Appendix B to this Order for the listed asset groups when
calculating and reporting depreciation for all reporting periods after the date of this
Order. No adjustment to accumulated depreciation or retained earnings should be
made to account for this change in accounting estimate.
|
2015-00331
|
3/3/2016
|
20160303_PSC_ORDER.pdf
|
2016-00073
|
3/4/2016
|
PSC_ORDER
Order Entered: that William Harris of Columbia, Kentucky, is
appointed to fill the existing vacancy on Adair County District's Board of
Commissioners. His term shall expire August 10, 2018.
|
2015-00305
|
3/7/2016
|
PSC_ORDER
Order Entered: Duke Kentucky's revised proposed Rider Premier Power Service tariff is
approved for service rendered on and after the date of this Order.
2. Duke Kentucky's proposal to file an annual summary report in lieu of filing
the individual special contracts is denied.
3. Duke Kentucky's request for approval of the proposed Standard Contract
in lieu of filing individual customer contracts is denied.
4. Duke Kentucky shall file with the Commission all special contracts related
to Rider PPS.
5. Duke Kentucky's request to record the revenues, capital costs, and
expenses associated with the proposed Rider Premier Power Service tariff below the
line for accounting purposes is denied.
6. Duke Kentucky shall record the revenues, capital costs, and expenses
associated with the proposed Rider Premier Power Service tariff above the line for
accounting purposes.
|
2015-00347
|
3/7/2016
|
PSC_ORDER
Final Order Entered: 1. Duke Kentucky's Application for a declaratory Order that Commission approval of the proposed acquisition is not required under KRS 278.020(5) or KRS 278.020(6) is granted, subject to Duke Kentucky's written acknowledgment filed February 5, 2016, accepting and agreeing to be bound by Duke Kentucky's commitment not to seek a higher rate or return on equity than would have been sought if the proposed acquisition had not occurred. 2. Duke Kentucky shall make an informational filing reflecting its post-transaction organizational structure once the transaction has been consummated and the organizational structure finalized. 3. Any documents filed in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the utility's general correspondence file.
|
2015-00413
|
3/7/2016
|
PSC_ORDER
Order Entered: Atmos Is granted a CPCN that authorizes it to bid on a franchise offered
by the city of Danville, Kentucky, for the transmission and distribution of natural gas.
2. If Atmos is not the successful bidder, Atmos shall, within ten days of the
award of the franchise at issue, file with the Commission a written notice stating that
Atmos was not the successful bidder.
3. If Atmos is the successful bidder, Atmos shall, within ten days of the
award of the franchise at issue, file with the Commission a copy of the executed
franchise agreement and a statement disclosing the amount of the initial franchise fee.
4. If Atmos is the successful bidder, Atmos shall, within ten days of an
increase or decrease in the amount of the initial franchise fee set forth in the franchise
agreement, file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00079
|
3/7/2016
|
PSC_ORDER
Order Entered: KU is granted a CPCN that authorizes it to bid on a franchise offered by
the city of California, Kentucky, for electric transmission and distribution service.
2. If KU is not the successful bidder, KU shall, within ten days of the award of
the franchise at issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU is the successful bidder, KU shall, within ten days of the award of the
franchise at issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the initial franchise fee.
4. If KU is the successful bidder, KU shall, within ten days of an increase or
decrease in the amount of the initial franchise fee set forth in the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00088
|
3/7/2016
|
PSC_ORDER
Order Entered: Duke Energy is granted a OPCN that authorizes It to bid on a franchise
offered by the city of Erlanger, Kentucky, for electric and natural gas transmission and
distribution service.
2. If Duke Energy is not the successful bidder, Duke Energy shall, within ten
days of the award of the franchise at issue, file with the Commission a written notice
stating that Duke Energy was not the successful bidder.
3. If Duke Energy is the successful bidder. Duke Energy shall, within ten
days of the award of the franchise at issue, file with the Commission a copy of the
executed franchise agreement and a statement disclosing the amount of the initial
franchise fee.
4. If Duke Energy is the successful bidder. Duke Energy shall, within ten
days of an increase or decrease in the amount of the initial franchise fee set forth in the
franchise agreement, file with the. Commission documentation setting forth the revised
fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00096
|
3/7/2016
|
20160307_DATA_REQUEST.pdf
Data Request
|
2015-00418
|
3/8/2016
|
PSC_ORDER
Order Entered: 1 . Within ten days of the date of this Order, the Companies shall respond to Staff's First Request issued on February 10, 2016.
2. If responses are not received within ten days of the date of this Order, a show cause proceeding will be initiated to determine whether there are any reasons why penalties should not be imposed pursuant to KRS 278.990 for the failure to file responses.
|
2015-00367
|
3/9/2016
|
PSC_ORDER
Order Entered, nunc pro tunc, that:
1. Footnote 1 in the Appendix to the February 29, 2016 Order in this matter is amended to read as follows: 1/ The Gas Cost Adjustment, as shown, is an adjustment per Mcf determined in accordance with the "Gas Cost Adjustment Clause" as set forth on Sheets 48 through 51 of Columbia's Tariff. The Gas Cost Adjustment applicable to a customer who is receiving service under Rate Schedule GS or IUS and received service under Rate Schedule SVGTS shall be $4.3062 per Mcf only for those months of the prior 12 months during which they were served under Rate
Schedule SVGTS. 2. All other provisions of the February 29, 2016 Order shall remain in full force and effect.
|
2016-00060
|
3/10/2016
|
PSC_ORDER
Order Entered, Nunc pro tunc, that:
1. Page 3 of the Order served electronically on March 4, 2016, is corrected to reflect that it was "Entered MAR 04 2016 ... . "
2. All other provisions of the Order served electronically on March 4, 2016, shall remain in full force and effect.
|
2015-00305
|
3/10/2016
|
20160310_PSC_ORDER.pdf
|
2016-00059
|
3/10/2016
|
20160310_PSC_ORDER01.pdf
|
2016-00059
|
3/11/2016
|
PSC_ORDER
Order Entered: Complainant's complaint is dismissed with prejudice.
2. This matter shall be closed and removed from the Commission's docket.
|
2015-00357
|
3/11/2016
|
PSC_ORDER
Order Entered: The procedural schedule set forth in the Appendix to this Order shall be
followed in this proceeding.
|
2016-00053
|
3/11/2016
|
PSC_ORDER
Order Entered: The rates proposed by Western Lewis are denied.
2. The rates set forth in the Appendix to this Order are approved for service
rendered by Western Lewis on and after April 1, 2016.
3. Within 20 days of the date of this Order, Western Lewis shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
4. Western Lewis shall file the information required in finding paragraph 8
concurrent with the filing of its next application for OCR rates.
|
2016-00085
|
3/11/2016
|
PSC_ORDER
Order Entered: The rates proposed by Martin and set forth in the Appendix to this Order
are approved for service rendered on and after April 1, 2016.
2. Within 20 days of the date of this Order, Martin shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00093
|
3/11/2016
|
PSC_ORDER
Order Entered: Ridgelea shall continue to operate its utility facilities during the pendency
of this matter and shall continue operating until the Commission issues an Order
adjudicating Ridgelea's request to abandon or transfer its facilities.
2. An informal conference shall be held at the Commission's offices at 211
Sower Boulevard, Frankfort, Kentucky, on Tuesday, March 29, 2016, at 10:00 a.m.
Daylight Savings Time.
3. The Acting Executive Director shall serve copies of this Order upon the
Attorney General's Office of Rate Intervention and the Franklin County Fiscal Court.
|
2016-00106
|
3/11/2016
|
20160311_PSC_ORDER.pdf
|
2015-00355
|
3/11/2016
|
20160311_PSC_ORDER.pdf
|
2015-00271
|
3/11/2016
|
20160311_PSC_ORDER.pdf
|
2015-00315
|
3/11/2016
|
20160311_PSC_ORDER.pdf
|
2015-00382
|
3/11/2016
|
20160311_DATA_REQUEST.pdf
Data Request
|
2016-00026
|
3/11/2016
|
20160311_DATA_REQUEST.pdf
Data Request
|
2016-00027
|
3/11/2016
|
20160311_PSC_ORDER.pdf
|
2016-00109
|
3/14/2016
|
PSC_ORDER
Order Entered: The water service rates requested by Laurel No. 2 are denied.
2. The water service rates set forth in Appendix Ato this Order are approved
for services rendered by Laurel No. 2 on and after the date of this Order.
3. Within 20 days of the date of this Order, Laurel No. 2 shall file revised tariff
sheets and special contracts with the Commission, using the Commission's electronic
Tariff Filing System, containing the rates setforth in Appendix Aof this Order.
4. In all future reporting periods. Laurel No. 2 shall use the "PSC Approved
Service Life set forth in Appendix B to this Order for the listed asset groups when
calculating and reporting depreciation for all reporting periods after the date of this
|
2015-00341
|
3/14/2016
|
PSC_ORDER
Order Entered: T. Rowe Price's Application for a declaratory
Order that its proposed increase in beneficial ownership of NiSource does not require
Commission approval under KRS 278.020(6) is granted, subject to T. Rowe Price's
written acknowledgement, filed within ten days of the date of this Order, accepting and
agreeing to be bound by T. Rowe Price's commitment that, if its investment policy
changes and it seeks to acquire control or influence control of NiSource or Columbia
Gas, T. Rowe Price will provide notice to the Commission before taking action and will
file an application for approval of the acquisition pursuant to KRS 278.020(6).
|
2015-00389
|
3/14/2016
|
PSC_ORDER
Order Entered: The revised Special Contract as filed on March 4, 2016, for service among
EKPC, Nolin, and AGC is approved. EKPC shall file by March 31 of each year, beginning in 2016, a report
detailing the prior calendar year's interruption of AGC as described in the findings
above.
3. Any documents filed pursuant to ordering paragraph 2 of this Order shall
reference the number of this case and shall be retained in the utility's general
correspondence file.
4. The Executive Director is delegated authority to grant reasonable
extensions of time for the filing of any documents required by this Order upon EKPC's
showing of good cause for such extension.
|
2015-00422
|
3/14/2016
|
PSC_ORDER
Order Entered: The procedural schedule set forth in the Appendix to this Order shall be
followed.
|
2016-00077
|
3/14/2016
|
20160314_PSC_ORDER.pdf
|
2015-00355
|
3/14/2016
|
20160314_PSC_ORDER.pdf
|
2015-00364
|
3/16/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a Certificate of Public Convenience and
Necessity to construct a wireless telecommunications facility. The proposed facility
consists of a self-supporting antenna tower not to exceed 310 feet in height, with
attached antenna, and is to be located on US 421, Lenarue, Marian County, Kentucky.
The coordinates for the proposed facility are North Latitude 36° 48' 32.77" by West
Longitude 83° 16' 6.64".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00391
|
3/16/2016
|
PSC_ORDER
Order Entered: Ballard Telephone's request for a deviation from the filing requirements of
807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q), 16(4)(r), and
16(5), is granted.
2. Ballard Telephone's 2014 annual financial report on file with the
Commission is incorporated into the record by reference only.
3. Ballard Telephone's application is deemed filed as of the date of this
Order.
|
2016-00042
|
3/16/2016
|
PSC_ORDER
Order Entered: North Central Telephone's request for a deviation from the filing
requirements of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q),
16(4)(r), and 16(5), is granted.
2. North Central Telephone's 2014 annual financial report on file with the
Commission is incorporated into the record by reference only.
3. North Central Telephone's application is deemed filed as of the date of
this Order.
|
2016-00043
|
3/16/2016
|
PSC_ORDER
Order Entered: Peoples Telephone's request for a deviation from the filing requirements
of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q), 16(4)(r), and
16(5), is granted.
2. Peoples Telephone's 2014 annual financial report on file with the
Commission is incorporated into the record by reference only.
3. Peoples Telephone's application is deemed filed as of the date of this
Order.
|
2016-00044
|
3/16/2016
|
PSC_ORDER
South Central Telephone's request for a deviation from the filing
requirements of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(r),
and 16(5), is granted.
2. South Central Telephone's 2015 annual financial report on file with the
Commission is incorporated into the record by reference only.
3. South Central Telephone's application is deemed filed as of the date of
this Order.
|
2016-00045
|
3/16/2016
|
PSC_ORDER
Order Entered: Mountain Telephone's request for a deviation from the filing requirements
of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q), 16(4)(r), and
16(5), is granted.
2. Mountain Telephone's 2014 annual financial report on file with the
Commission is incorporated into the record by reference only.
3. Mountain Telephone's application is deemed filed as of the date of this
Order.
|
2016-00047
|
3/16/2016
|
PSC_ORDER
Order Entered: The rates proposed by Citipower are denied.
2. The rates set forth in the Appendix to this Order are approved for service
rendered by Citipower on and after April 1, 2016.
3. Citipower shall submit all invoices received from Citigas and Citizens Gas
as part of all future OCR rate filings.
4. Within 20 days of the date of this Order, Citipower shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00102
|
3/16/2016
|
20160316_DATA_REQUEST.pdf
Data Request
|
2015-00039
|
3/16/2016
|
20160316_PSC_ORDER.pdf
|
2015-00411
|
3/16/2016
|
20160316_PSC_ORDER.pdf
|
2015-00412
|
3/17/2016
|
20160317_PSC_IC_NOTICE.pdf
Commission Staff's Notice of Informal Conference
|
2014-00267
|
3/17/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.07 per 1 ,000 gallons is approved. 2. Bath District's proposed rates are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Bath District on and after February 15, 2016. 4. Within 20 days of the date of this Order, Bath District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00098
|
3/17/2016
|
20160317_PSC_ORDER.pdf
|
2015-00311
|
3/18/2016
|
DATA_REQUEST
COMMISSION STAFF'S THIRD REQUEST FOR INFORMATION
TO BIG SANDY RURAL ELECTRIC COOPERATIVE CORPORATION
|
2015-00337
|
3/18/2016
|
DATA_REQUEST
Commission Staff's Third Request for Information to East Kentucky Power Cooperative, Inc.
|
2016-00002
|
3/18/2016
|
DATA_REQUEST
COMMISSION STAFF'S THIRD REQUEST FOR INFORMATION
TO BIG RIVERS ELECTRIC CORPORATION
|
2016-00006
|
3/18/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Atmos Energy Corporation
|
2016-00052
|
3/18/2016
|
PSC_ORDER
Order Entered: The rates proposed by Burkesville are denied.
2. The rates set forth in the Appendix to this Order are approved for service
rendered by Burkesville on and after March 28, 2016.
3. Within 20 days of the date of this Order, Burkesville shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00090
|
3/18/2016
|
PSC_ORDER
Final Order Entered: 1.The purchased water adjustment factor of $0.49 per 1,000 gallons is approved. 2. Monroe District's proposed rates are approved. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Monroe District on and after March 1, 2016. 4. Within 20 days of the date of this Order, Monroe District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00092
|
3/18/2016
|
PSC_ORDER
Order Entered: The amended rate proposed by Bluegrass and set forth in the Appendix to
this Order is approved for service rendered on and after April 1, 2016.
2. Within 20 days of the date of this Order, Bluegrass shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00094
|
3/18/2016
|
PSC_ORDER
Order Entered: The rate proposed by Natural Energy Is denied
2. The rate set forth in the Appendix to this Order is approved for service
rendered by Natural Energy on and after April 1, 2016.
3. Within 20 days of the date of this Order, Natural Energy shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00095
|
3/18/2016
|
PSC_ORDER
Order Entered: The rates proposed by Millennium and set forth in the Appendix to this
Order are approved for service rendered on and after April 1, 2016.
2. Within 20 days of the date of this Order, Millennium shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00097
|
3/18/2016
|
PSC_ORDER
Order Entered: The rate proposed by Valley Gas and set forth in the Appendix to this
Order is approved for service rendered on and after April 1, 2016.
2. Within 20 days of the date of this Order, Valley Gas shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00105
|
3/18/2016
|
PSC_ORDER
Order Entered: Owen Electric is granted a OPCN that authorizes It to bid on a franchise
offered by the city of Erlanger, Kentucky, for electric transmission and distribution
service.
2. If Owen Electric is not the successful bidder, Owen Electric shall, within
ten days of the award of the franchise at issue, file with the Commission a written notice
stating that Owen Electric was not the successful bidder.
3. If Owen Electric is the successful bidder, Owen Electric shall, within ten
days of the award of the franchise at issue, file with the Commission a copy of the
executed franchise agreement and a statement disclosing the amount of the initial
franchise fee.
4. If Owen Electric is the successful bidder, Owen Electric shall, within ten
days of an increase or decrease in the amount of the initial franchise fee set forth in the
franchise agreement, file with the Commission documentation setting forth the revised
fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a Certificate of Public
Convenience and Necessity to construct utility facilities in said city.
|
2016-00121
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00082
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00083
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00084
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
(Copied from Case: 2016-00070 )Data Request
|
2015-00343
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00070
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2015-00227
|
3/18/2016
|
20160318_PSC_ORDER.pdf
|
2015-00315
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2015-00343
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00005
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00003
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00001
|
3/18/2016
|
20160318_DATA_REQUEST.pdf
Data Request
|
2016-00004
|
3/21/2016
|
20160321_PSC_ORDER.pdf
|
2016-00073
|
3/21/2016
|
20160321_DATA_REQUEST.pdf
Data Request
|
2015-00312
|
3/22/2016
|
PSC_ORDER
Final Order Entered: 1. The Applicant is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located on KY 568, approximately 0.5 miles northeast of Cranks, Harlan County, Kentucky. The coordinates for the proposed facility are North Latitude 36° 46' 15.03" by West Longitude 83° 9' 40.17". 2. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2015-00363
|
3/22/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a monopole antenna
tower not to exceed 190 feet in height, with attached antenna, and is to be located off of
McKnight Road, Benham, Marian County, Kentucky. The coordinates for the proposed
facility are North Latitude 36° 57' 44.96" by West Longitude 82° 56' 58.33".
2. The Applicant shall file a copy of the final decisions regarding the pending
FAA and KAZC applications for the proposed construction within ten days of receiving
the decisions.
3. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
4. Documents filed, if any, in the future pursuant to ordering paragraphs 2
and 3 herein shall reference this case number and shall be retained in the utility's
general correspondence file.
|
2015-00420
|
3/22/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.20 per 1,000 gallons is
approved.
2. North Hopkins's proposed rates, as set forth in Appendix Bto this Order,
are approved for services rendered on and after March 15, 2016.
3. Within 20 days of the date of this Order, North Hopkins shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00099
|
3/22/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $(0.17) per 1 ,000 gallons is approved. 2. Henderson District's proposed rates are denied. 3. The rates, as set forth in Appendix B to this Order, are approved for water service rendered by Henderson District on and after March 1, 2016. 4. Within 20 days of the date of this Order, Henderson District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00101
|
3/22/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.22 per 1,000 gallons is approved. 2. Nebo District's proposed rates, as set forth in Appendix B to this Order, are approved for services rendered on and after March 15, 2016. 3. Within 20 days of the date of this Order, Nebo District shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00103
|
3/22/2016
|
20160322_PSC_Notice.pdf
Notice
|
2015-00418
|
3/23/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to East Kentucky Network, LLC d/b/a Appalachian Wireless
|
2015-00380
|
3/23/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to East Kentucky Power Cooperative, Inc.
|
2016-00116
|
3/23/2016
|
20160323_PSC_ORDER.pdf
|
2015-00382
|
3/23/2016
|
20160323_PSC_ORDER.pdf
|
2016-00026
|
3/24/2016
|
PSC_ORDER
Final Order Entered: 1. Kentucky Power's request for a declaration that the biannual ground-inspection requirements of 807 KAR 5:006, Section 26(4)(e), are inapplicable to its 34.5-kV and 46-kV electric line facilities and that these facilities are instead subject to the ground-inspection requirements of 807 KAR 5:006, Section 26(4)(c), is denied. 2. Kentucky Power's request for a declaration that, to the extent that it complies with the ground-inspection requirements of 807 KAR 5:006, Section 26(4)(c), with respect to its electric lines operating at or above 69 kV, it may make the inspections required by 807 KAR 5:006, Section 26(4)(b)4 aerially is granted. 3. Kentucky Power's request for a deviation from the inspection requirements of 807 KAR 5:006, Section 26(4)(e), for its 34.5-kV and 46-kV electric line facilities is denied. 4. Kentucky Power's request for a deviation from the prohibition in 807 KAR 5:006, Section 26(4)(g), as it applies to inspection requirements under 807 KAR 5:006, Section 26(4)(b)4 is denied as moot.
|
2014-00479
|
3/24/2016
|
PSC_ORDER
Final Order Entered: 1. BGE's proposed rate is denied. 2. The recommendations and findings contained in Commission Staff's Report, as modified herein, are adopted and incorporated by reference into this Order as if fully set out herein. 3. The rate set forth in the Appendix to this Order is approved for service rendered by BGE on and after the date of this Order. 4. The nonrecurring charge set forth in the Appendix to this Order is approved. 5. BGE's proposed Late Payment Charge is denied. 6. BGE shall work closely with the Commission's Tariff Branch Staff to craft language that clearly states the utility's policies and complies with the applicable statutes and regulations. 7. Within 20 days of the date of this Order, BGE shall file revised tariff sheets with the Commission, using the Commission's electronic Tariff Filing System, setting forth the rate approved herein.
|
2015-00306
|
3/24/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located 1.1
-2- Case No. 2015-00373
mile southeast of Fredville, Magoffin County, Kentucky. The coordinates for the
proposed facility are North Latitude 37°35' 29" by West Longitude 82° 57' 22".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00373
|
3/24/2016
|
PSC_ORDER
Order Entered: The motion of Atmos Energy to intervene is granted.
2. Atmos Energy shall be entitled to the full rights of a party and shall be
served with the Commission's Orders and with filed testimony, exhibits, pleadings,
correspondence, and all other documents submitted by parties after the date of this
Order.
3. Atmos Energy shall comply with all provisions of the Commission's
regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents.
4. Atmos Energy shall adhere to the procedural schedule set forth in the
Commission's March 11, 2016 Order and as amended by subsequent Orders.
5. Within seven days of entry of this Order, Atmos Energy shall provide the
electronic mail address to which all electronic documents issued by the Commission
and other parties of record may be served upon Atmos Energy in accordance with 807
KAR 5:001, Section 4(8)(b).
|
2016-00053
|
3/24/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to WKG Storage, Inc.
|
2016-00053
|
3/24/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 265 feet in height, with attached antenna, and is to be located at
1999 US 460 West, West Liberty, Morgan County, Kentucky. The coordinates for the
proposed facility are North Latitude 37° 53' 33.99" by West Longitude 83° 17' 14.13".
2. The Applicant shall file a copy of the revised FAA application for the
proposed construction within ten days of filing the revised application and a copy of the
final decision regarding the revised FAA application within ten days of receiving the
decision.
3. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
4. Documents filed, if any, in the future pursuant to ordering paragraphs 2
and 3 herein shall reference this case number and shall be retained in the utility's
general correspondence file.
|
2016-00076
|
3/24/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Licking Valley Rural Electric Cooperative Corporation
|
2016-00077
|
3/24/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Columbia Gas of Kentucky
|
2016-00107
|
3/24/2016
|
20160324_PSC_ORDER.pdf
|
2016-00100
|
3/24/2016
|
20160324_PSC_ORDER.pdf
|
2016-00040
|
3/28/2016
|
PSC_ORDER
Order Entered: 1 . Movant's motions for confidential protection of certain information in its Back-Up Power Supply Plant, and its response to Commission Staffs First Request for Information, Item 10, and its attachments to Items 8 and 9, are granted. 2. Pursuant to KRS 61.878, the information for which Movant requests confidential protection shall not be placed in the public record or made available for public inspection for ten years from the date of this Order, or until further Order of the Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Movant shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order, the Movant shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Movant is unable to make such demonstration, the requested materials shall be made available for inspection.
|
2015-00075
|
3/28/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Duke Energy Kentucky, Inc.
|
2016-00112
|
3/28/2016
|
20160328_DATA_REQUEST.pdf
Data Request
|
2016-00073
|
3/29/2016
|
PSC_ORDER
Final Order Entered: 1. The Applicants are granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located on Campground Road, Corbin, Knox County, Kentucky. The coordinates for the proposed facility are North Latitude 36° 58' 22.02" by West Longitude 84° 3' 51.38". 2. The Applicants shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2015-00371
|
3/29/2016
|
PSC_ORDER
Final Order Entered: 1. The proposed acquisition of Pinewood's wastewater assets by Western Mason is approved. 2. Pinewood shall notify the Commission within ten days of the transfer's completion. 3. Within 60 days of the date of transfer of Pinewood's assets to Western Mason, Pinewood shall file with the Commission its 2016 Annual Report covering the period of January 1, 2016, through the date of transfer. 4. If there is a material revision to the proposed acquisition, Pinewood shall apply for Commission approval for the revision, and no material revision will be effective without prior Commission approval. 5. The Executive Director is delegated authority to grant reasonable extensions of time for the filing of any documents required by this Order upon Pinewood's showing of good cause for such extension. 6. Any documents filed in the future pursuant to ordering paragraphs 2 and 3 of this Order shall reference the case number and shall be retained in the utility's general correspondence file.
|
2015-00383
|
3/29/2016
|
PSC_ORDER
Order Entered: 1. Foothills Rural Telephone's request for a deviation from the filing requirements of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q), 16(4)(r), and 16(5), is granted. 2. Foothills Rural Telephone's 2014 annual financial report on file with the Commission is incorporated into the record by reference only. 3. Foothills Rural Telephone's application is deemed filed as of the date of this Order.
|
2016-00051
|
3/29/2016
|
PSC_ORDER
Final Order Entered: 1. The Applicant is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 275 feet in height, with attached antenna, and is to be located at 3293 KY 134, Hazel Green, Morgan County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 45' 3.84" by West Longitude 83° 15' 17.98". 2. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00072
|
3/29/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Hardin County Water District No. 1
|
2016-00075
|
3/29/2016
|
20160329_PSC_ORDER.pdf
|
2016-00054
|
3/29/2016
|
20160329_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00084
|
3/30/2016
|
PSC_ORDER
Order Entered: 1. Complainant shall file responses to Kentucky Power and Commission Staff's requests for information within ten days of the date of this Order. 2. If Complainant fails to file, within ten days of the date of this Order, responses to Kentucky Power and Commission Staffs requests for information or a written request for additional time explaining why additional time is needed, his Complaint shall be dismissed with prejudice.
|
2015-00260
|
3/30/2016
|
PSC_ORDER
Final Order Entered: 1. Muhlenberg District #3's request to withdraw its application is granted. 2. Muhlenberg District #3's application for a CPCN and financing is dismissed. 3. This case is closed and removed from the Commission's docket.
|
2015-00279
|
3/30/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Platinumtel Communications, LLC
|
2016-00030
|
3/30/2016
|
PSC_ORDER
Order Entered: 1. Logan Telephone's request for a deviation from the filing requirements of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q), 16(4)(r), and 16(5), is granted. 2. Logan Telephone's 2014 annual financial report on file with the Commission is incorporated into the record by reference only. 3. Logan Telephone's application is deemed filed as of the date of this Order.
|
2016-00041
|
3/30/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulation, 807 KAR 5:001 , Section 7, related to the service and filing of documents. 4. The Attorney General shall adhere to the procedural schedule set forth in
the Commission's March 11 , 2016 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, the Attorney General shall provide his electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Attorney General in accordance with 807 KAR 5:001, Section 4(8)(b).
|
2016-00053
|
3/30/2016
|
PSC_ORDER
Final Order Entered: 1 . The Applicant is granted a Certificate of CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 265 feet in height, with attached antenna, and is to be located off of Old US 23, approximately 0.5 of a mile east of Wittenville, Johnson County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 51 ' 45.37" by West Longitude 82° 4 7' 11 . 75". 2. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00057
|
3/30/2016
|
PSC_ORDER
Final Order Entered: 1. Henry District is granted a CPCN to proceed with the proposed construction as set forth in its application. 2. Henry District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved shall be undertaken only with the prior approval of the Commission. 4. Henry District shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project. 5. Henry District is authorized to enter the proposed Assistance Agreement with KIA and, under the terms of that Agreement, to borrow from KIA an amount not to exceed $2,800,000 to be repaid over a 20-year period at an interest rate of 1.75 percent per annum. 6. Within 30 days of executing its proposed Assistance Agreement with KIA, Henry District shall file with the Commission an executed copy of the Assistance Agreement. Henry District shall use $2,800,000 of the proceeds from the proposed Assistance Agreement with KIA only for the lawful purposes set forth in its application.
|
2016-00080
|
3/31/2016
|
PSC_ORDER
Order Entered: EKPC's motion to withdraw its March 15,
2016 motion to submit this matter on the existing record and to file a revised response
to Commission Staff's First Request for Information, Item 1, is granted.
|
2015-00281
|
3/31/2016
|
PSC_ORDER
Atmos's proposed PBR tariff revisions are approved as of the date of this
Order and shall continue in effect through May 31, 2021.
2. Atmos's PBR mechanism shall be extended for an additional five years
through May 31, 2021.
3. Atmos's report on the results of the current PBR mechanism is accepted.
4. Atmos shall file annual reports of its activity under the extended PBR
including the same information as contained in the report filed in this proceeding. These
reports shall be filed by August 31 of each calendar year, commencing in 2016.
5. Within 90 days of the end of the fourth year of the five-year extension,
Atmos shall file an evaluation report on the results of the PBR for the first four years of
the extension period, and the Commission shall review same for purposes of
determining whether the PBR should be continued, modified, or terminated.
6. Atmos shall, within 20 days of the date of this Order, file its revised tariff
sheets setting out the revisions to its PBR tariff approved herein, and reflecting that they
were approved pursuant to this Order.
|
2015-00298
|
3/31/2016
|
PSC_ORDER
Order Entered: The amounts billed by Big Rivers through its environmental surcharge for
the period August 1, 2013, through July 31, 2015, are approved.
2. The amounts billed by each of the Member Cooperatives through their
respective environmental surcharge pass-through mechanisms for the period August 1,
2013, through July 31, 2015, for all customers with dedicated delivery points are
approved; and the amounts billed by each of the Member Cooperatives through their
respective environmental surcharge pass-through mechanisms for the periods
September 1, 2013, through August 31, 2015, for all other customers, are approved.
|
2015-00320
|
3/31/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located 0.6
of a mile north of Relief, Morgan County, Kentucky. The coordinates for the proposed
facility are North Latitude 37° 57' 9.70" by West Longitude 82° 59' 40.52".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00366
|
3/31/2016
|
PSC_ORDER
Order Entered: 1. Mr. Graham's Request to Intervene is denied. 2. Petitioners' Joint Request to Intervene is denied. 3. Petitioners' tendered documents shall be considered as public comment.
|
2015-00404
|
3/31/2016
|
PSC_ORDER
Order Entered: EKPC's motion for confidential protection is hereby granted.
2. The materials contained in EKPC's Responses to Staffs Request, Items
15, 19, and 20, are hereby granted confidential protection. The materials granted
confidential protection will not be placed In the public record nor made available for
public inspection for a period of ten years from the date of this Order, or upon further
Orders of this Commission.
|
2016-00002
|
3/31/2016
|
PSC_ORDER
Order Entered: West Kentucky Telephone's request for a deviation from the filing
requirements of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q),
16(4)(r), and 16(5), is granted.
2. West Kentucky Telephone's 2014 annual financial report on file with the
Commission is incorporated into the record by reference only.
3. West Kentucky Telephone's application is deemed filed as of the date of
this Order.
|
2016-00048
|
3/31/2016
|
PSC_ORDER
Order Entered: Duo County Telephone's request for a deviation from the filing
requirements of 807 KAR 5:001, Sections 16(4)(b), 16(4)(h), 16(4)(i), 16(4)(n), 16(4)(q),
16(4)(r), and 16(5), is granted.
2. Duo County Telephone's 2014 annual financial report on file with the
Commission is incorporated into the record by reference only.
3. Duo County Telephone's application is deemed filed as of the date of this
Order.
|
2016-00050
|
3/31/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to East Kentucky Power Cooperative, Inc.
|
2016-00056
|
3/31/2016
|
PSC_ORDER
Final Order Entered: 1 . Logan is granted a CPCN to construct new facilities as set forth in its application and as described in this Order. 2. Should the costs of the construction authorized herein exceed by more than 10 percent the estimated costs contained in the application, Logan shall immediately notify the Commission in writing of the adjustment and include an explanation of the additional costs for the Commission's approval.
3. As provided for in this Order, Logan shall maintain records that clearly and sufficiently document the proper allocation of costs for jurisdictional and nonjurisdictional services provided as a result of this construction project. 4. Any documents filed pursuant to ordering paragraph 2 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00081
|
3/31/2016
|
PSC_ORDER
Order Entered nunc pro tunc, that:
1. Footnote 3 on page 2 to the Commission's March 22, 2016 Order is amended to read:
TFS 2016-00003 (Ky. PSG filed Jan. 4, 2016); The tariff was accepted for filing by the Commission by letter dated March 1, 2016.
2. The rate for 2-inch meters, as listed in Appendix B of the Commission's March 22, 2016 Order, is amended as follows:
Next 14,000 gallons 6.13 per 1,000 gallons
3. All other provisions of the Commission's March 22, 2016 Order not in conflict with this Order shall remain in full force and effect.
|
2016-00101
|
3/31/2016
|
PSC_ORDER
Order Entered: The GLT rates in the Appendix to this Order are approved for service
rendered by LG&E on and after April 29, 2016.
2. Within 20 days of the date of this Order, LG&E shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00108
|
3/31/2016
|
DATA_REQUEST
Commission Staff's First Information Request to Delta Natural Gas Company, Inc.
|
2016-00110
|
3/31/2016
|
PSC_ORDER
Final Order Entered: 1. Western Lewis-Rectorville is granted a CPCN for the proposed construction as set forth in its application. 2. Western Lewis-Rectorville's proposed plan of financing is approved. 3. Western Lewis-Rectorville is authorized to obtain a KIA loan in an amount
not to exceed $1,266,500 with 30 percent principal forgiveness at an interest rate not to exceed 0.75 percent per annum, maturing over 20 years.
4. The proceeds from the ARC grant and KIA loan shall be used only for the purposes specified in Western Lewis-Rectorville's application.
5. Western Lewis-Rectorville shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Western Lewis-Rectorville may use such surplus to construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in Western Lewis-Rectorville's rates for service. Western Lewis-Rectorville shall provide written notice of this additional
construction in accordance with 807 KAR 5:069, Section 4. 7. Western Lewis-Rectorville shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs (e.g., engineering, legal, and administrative) within 60 days of date that construction is substantially completed.
|
2016-00111
|
3/31/2016
|
PSC_ORDER
Final Order Entered: 1 . KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Bonnieville, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00125
|
3/31/2016
|
PSC_ORDER
Final Order Entered: 1 . KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Ravenna, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00126
|
3/31/2016
|
PSC_ORDER
Final Order Entered: 1 . KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Ghent, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00128
|
3/31/2016
|
20160331_PSC_ORDER.pdf
|
2015-00355
|
3/31/2016
|
20160331_PSC_ORDER.pdf
|
2015-00312
|
3/31/2016
|
20160331_PSC_ORDER.pdf
|
2014-00078
|
3/31/2016
|
20160331_PSC_ORDER.pdf
|
2015-00382
|
3/31/2016
|
20160331_PSC_ORDER.pdf
|
2015-00398
|
3/31/2016
|
20160331_PSC_ORDER.pdf
|
2016-00005
|
3/31/2016
|
20160331_DATA_REQUEST.pdf
Data Request
|
2016-00104
|
4/1/2016
|
DATA_REQUEST
COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION
TO REID VILLAGE WATER DISTRICT
|
2016-00086
|
4/1/2016
|
PSC_ORDER
Order Entered: 1 . Big Rivers and each of its three Member Cooperatives listed in footnote 2 shall be made parties to this case. 2. The procedural schedule set forth in Appendix A to this Order shall be followed in this proceeding. 3. Any person who submits a motion to intervene after May16, 2016, and upon a showing of good cause is granted full intervention, shall accept and abide by the existing procedural schedule.
4. Big Rivers shall, by the date set forth in Appendix A to this Order, file its prepared direct testimony in support of the reasonableness of the application of its environmental surcharge mechanism and the three Member Cooperatives, or Big Rivers on their behalf shall file by that date their prepared direct testimony in support of the reasonableness of the application of the pass-through mechanism during the periods under review. 5. Any party filing testimony shall file an original and seven copies. 6. a. The information requested herein is due on or before the date
specified in Appendix A to this Order. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and seven copies to the Commission.
|
2016-00124
|
4/1/2016
|
20160401_PSC_ORDER.pdf
|
2016-00059
|
4/1/2016
|
20160401_PSC_ORDER.pdf
|
2015-00418
|
4/4/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Ridgelea Investments, Inc.
|
2016-00106
|
4/4/2016
|
PSC_ORDER
Final Order Entered: 1. AT&T Kentucky's petition regarding the Pooling Administrator's denial of its application for assignment of additional numbering resources is granted. 2. The decision of the Pooling Administrator denying AT&T Kentucky's request for the assignment of two new thousands-blocks for the Georgetown rate center in Kentucky is hereby overturned. 3. The Pooling Administrator shall assign AT&T Kentucky two thousands-blocks of 2,000 consecutive numbers for the Georgetown rate center. 4. The numbering resources considered in this Order are to be assigned for the sole use of AT&T Kentucky's customer, Toyota. If the numbering resources requested by AT&T Kentucky are no longer required to meet the service, the associated numbering resources approved in this Order shall be returned to the Pooling Administrator.
|
2016-00113
|
4/4/2016
|
20160404_PSC_ORDER.pdf
|
2016-00084
|
4/4/2016
|
20160404_PSC_ORDER.pdf
|
2015-00368
|
4/5/2016
|
PSC_ORDER
Order Entered: Movants petition for confidential protection Is hereby granted.
2. The materials contained In Movant's responses to comments filed by the
AG and Sierra Club meet the criteria for confidential protection as set forth In KRS
61.878(1)(c) and are hereby granted confidential protection. The materials granted
confidential protection will not be placed In the public record or made available for public
Inspection for an Indefinite period of time, or upon further Orders of this Commission.
3. Use of the materials In question In any Commission proceeding shall be In
compliance with 807 KAR 5:001, Section 13(9).
4. Movant shall Inform the Commission If the materials granted confidential
protection become publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to Inspect materials granted
confidential treatment by this Order and the period during which the materials have
been granted confidential treatment has not run, Movant shall have 20 days from receipt
of written notice of the request to demonstrate that the materials still fall within the
exclusions from disclosure requirements established In KRS 61.878. If Movant Is
unable to make such demonstration, the requested materials shall be made available
for Inspection. Otherwise, the Commission shall deny the request for Inspection.
|
2014-00166
|
4/5/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located on
Boardtree Fork Road approximately 2.5 miles south of Hendricks, Magoffin County,
Kentucky. The coordinates for the proposed facility are North Latitude 37° 40' 19.88" by
West Longitude 83° 7' 5.35".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00372
|
4/5/2016
|
PSC_ORDER
Final Order Entered: 1. The Applicant is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located off Racetrack Branch, Saldee, Breathitt County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 27' 3.22" by West Longitude 83° 22' 17.77". 2. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2015-00378
|
4/5/2016
|
PSC_ORDER
Final Order Entered: 1. The Applicant is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 265 feet in height, with attached antenna, and is to be located at 490 Jacobs Ridge Road, Pippa Passes, Knott County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 20' 33.17" by West Longitude 82° 53' 0".
2. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00067
|
4/5/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.07 per 1,000 gallons is
approved.
2. Sharpsburg District's proposed rates, as set forth in Appendix B to this
Order, are approved for water service rendered on and after February 15, 2016.
3. Within 20 days of the date of this Order, Sharpsburg District shall file with
the Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00118
|
4/5/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.07 per 1,000 gallons is approved. 2. Meade County's proposed rates are approved, as set forth in Appendix B to this Order, for services rendered on and after March 1, 2016. 3. Within 20 days of the date of this Order, Meade County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00122
|
4/5/2016
|
PSC_ORDER
Order Entered: Nexus's request to withdraw as an ETC is granted.
2. This case is now closed and removed from the Commission's docket.
|
2016-00123
|
4/5/2016
|
20160405_PSC_ORDER.pdf
|
2016-00026
|
4/5/2016
|
20160405_PSC_ORDER01.pdf
|
2016-00026
|
4/5/2016
|
20160405_PSC_ORDER.pdf
|
2016-00027
|
4/5/2016
|
20160405_PSC_ORDER01.pdf
|
2016-00027
|
4/5/2016
|
20160405_PSC_ORDER.pdf
|
2015-00152
|
4/5/2016
|
20160405_PSC_ORDER.pdf
|
2015-00382
|
4/5/2016
|
20160405_PSC_ORDER01.pdf
|
2015-00382
|
4/6/2016
|
PSC_ORDER
Order Entered: 1. The AG's motion to deviate from the procedural schedule is approved. 2. The procedural schedule previously established in this matter is amended as set forth in the Appendix to this Order and shall be followed for the remainder of this proceeding.
|
2016-00053
|
4/6/2016
|
20160406_PSC_ORDER.pdf
|
2016-00083
|
4/6/2016
|
20160406_DATA_REQUEST.pdf
Data Request
|
2016-00059
|
4/6/2016
|
20160406_DATA_REQUEST01.pdf
Data Request
|
2016-00059
|
4/6/2016
|
20160406_DATA_REQUEST02.pdf
Data Request
|
2016-00059
|
4/6/2016
|
20160406_DATA_REQUEST03.pdf
Data Request
|
2016-00059
|
4/6/2016
|
20160406_DATA_REQUEST04.pdf
Data Request
|
2016-00059
|
4/7/2016
|
PSC_ORDER
Order Entered: Big Sandy's Prepay Program is approved on a permanent basis on and
after the date of this Order.
2. Big Sandy's Prepay Program tariff as revised and corrected through
discovery is approved on and after the date of this Order.
3. Big Sandy's request for a deviation from the requirement to mail paper
bills to Prepay Program participants is denied as moot.
4. Big Sandy's request for a deviation from 807 KAR 5:006, Section 15{1)(f),
is granted.
5. Big Sandy shall make annual filings for calendar years 2016, 2017, and
2018 as set forth in the findings above, and thereafter shall maintain records so as to be
able to provide the same information upon request.
6. Within ten days of the date of this Order, Big Sandy shall file its Prepay
Program tariff and Prepay Agreement for Participation, using the Commission's
|
2015-00337
|
4/7/2016
|
PSC_ORDER
Order Entered: 1. Reid Village's motion for extension of time to respond to Commission Staff's First Request for Information is granted. 2. Reid Village shall file with the Commission its responses to Commission Staffs First Request for Information no later than May 1, 2016. 3. Reid Village's Application for approval of the loan to fund the purchase of improved real property is continued beyond the 60-day period specified in KRS
278.300(2).
|
2016-00086
|
4/7/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Atmos and set forth in the Appendix to this Order are approved for final meter readings on and after May 1, 2016. 2. Within 20 days of the date of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00129
|
4/7/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Frontier are denied. 2. The rates set forth in the Appendix to this Order are approved for final
meter readings by Frontier on and after May 1, 2016. 3. Within 20 days of the date of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order. 4 . Frontier shall provide detailed discussions of its efforts to decrease the incidence of gas loss on its system, as well as any updates to projections for when such losses are expected to decrease to 5 percent or below, with every future application in which gas cost recovery is proposed with no L&U limit.
|
2016-00135
|
4/7/2016
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Owingsville, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00141
|
4/7/2016
|
20160407_PSC_ORDER.pdf
|
2016-00082
|
4/7/2016
|
20160407_PSC_ORDER.pdf
|
2016-00119
|
4/8/2016
|
PSC_ORDER
Final Order Entered: 1. The amounts billed by EKPC through its environmental surcharge for the period July 1, 2013, to June 30, 2015, are approved. 2. Beginning in the first full-billing month following the date of this Order, EKPC shall increase its jurisdictional environmental revenue requirement by $195,578 for one month, and $195,577 for one month. 3. EKPC's request to include the over-recovery for June 2015 through
February 2016 in the adjustment in this review is denied. 4. EKPC shall use a rate of return of 6.045 percent in all monthly environmental surcharge filings subsequent to the date of this Order. 5. EKPC's Member Cooperatives shall include the applicable monthly retail pass-through adjustments, shown in the Appendix to this Order, in the determination of each Member Cooperative's respective pass-through mechanism, as discussed herein, following the date of this order. 6. The Member Cooperatives shall use the proposed calculation methodology as discussed herein to calculate their monthly over/under amounts beginning with the next review proceeding to be opened following the closure of this
matter.
|
2015-00281
|
4/8/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 250 feet in height, with attached antenna, and is to be located at
348 R. Grider Road, Russell Springs, Adair County, Kentucky. The coordinates for the
proposed facility are North Latitude 37°4' 30.16" by West Longitude 85° 10' 8.56".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00314
|
4/8/2016
|
PSC_ORDER
Final Order Entered: 1. LG&E's request to withdraw its petition for a state waiver for the reassessment of the Ballardsville Pipeline is granted.
2. This case is dismissed and removed from the Commission's docket.
|
2015-00419
|
4/8/2016
|
PSC_ORDER
Final Order Entered: 1. Mountain District's Petition for Modification is denied. 2. Ordering paragraph 8 of the October 9, 2015 Order in Case No. 2014-00342 is modified to the limited extent that the time schedule within which Mountain District shall obtain the services of an outside independent consultant to provide the services described therein is extended to 60 days from the date of this Order. 3. Ordering paragraph 9 of the October 9, 2015 Order in Case No. 2014-00342 is modified to the limited extent that the time schedule with in which Mountain District shall submit to the Commission the required written report is extended to 120 days from the date of this Order. 4. All other provisions of the Commission's October 9, 2015 Order and November 17, 2015 Order on rehearing in Case No. 2014-00342 shall remain in full force and effect.
|
2016-00062
|
4/8/2016
|
PSC_ORDER
Final Order Entered: The Companies' proposed depreciation rates for the Brown Solar Facility are approved.
|
2016-00063
|
4/8/2016
|
PSC_ORDER
Order Entered: A hearing in this matter shall be held on Tuesday, May 3, 2016, at 9:00
a.m. Daylight Saving Time, at the offices of the Public Service Commission, 211 Sower
Boulevard, Frankfort, Kentucky.
2. Ridgelea Investments, Inc. ("Ridgelea") shall give notice of the hearing in
compliance with 807 KAR 5:001, Section 9(2)(b). In addition, the notice of hearing shall
include the following statement: "This hearing will be streamed live and may be viewed
on the PSC website, psc.ky.gov." At the time the notice is mailed or publication is
requested, Ridgelea shall forward a duplicate of the notice and request to the
Commission.
3. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9)(a), the record
of the formal hearing in this matter shall be by digital video recording.
|
2016-00106
|
4/8/2016
|
20160408_PSC_ORDER.pdf
Order Entered: 1. The motion of Aleris to intervene is granted. 2. Aleris shall be entitled to the full rights of a party and shall be served with
the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documen
|
2016-00117
|
4/8/2016
|
20160408_PSC_ORDER01.pdf
Order Entered: 1. The motion of Attorney General to intervene is granted. 2. Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, an
|
2016-00117
|
4/8/2016
|
20160408_PSC_ORDER02.pdf
Order Entered: 1. The procedural schedule set forth in the Appendix, which is attached hereto and incorporated herein, shall be followed.
2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the n
|
2016-00117
|
4/8/2016
|
PSC_ORDER
Final Order Entered: 1. The rate as proposed by Public and set forth in the Appendix to this Order is approved for service rendered on and after May 1, 2016. 2. Within 20 days of the date of this Order, Public shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00136
|
4/8/2016
|
PSC_ORDER
Final Order Entered: 1. The rate as proposed by LG&E and set forth in the Appendix to this Order is approved for gas supplied by LG&E on and after May 1, 2016. 2. Within 20 days of the date of this Order, LG&E shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2016-00137
|
4/8/2016
|
PSC_ORDER
Order Entered: . This investigation is opened to provide Sentra an opportunity to present evidence to demonstrate: (a) that its cost of gas from its affiliate is no greater than market as required by KRS 278.2207(1)(b); (b) that the PGA component of Sentra's rates and the wholesale rates charged to Sentra are just and reasonable as required by KRS 278.274 for natural gas purchased from an affiliate; (c) why the PGA component of Sentra's rates should not be reduced to market with a corresponding reduction to the cost of gas sold to Sentra under KRS 278.274; and (d) why Sentra's PGA clause should not be revised to provide a better match of its gas cost and its gas cost revenue. 2. Sentra and its affiliate supplier, MHP, shall be parties to this case. 3. Sentra shall collect the PGA component of its rates subject to refund effective for bills rendered after the date of this Order until further Commission Order. 4. The procedural schedule set forth in Appendix A shall be followed. 5. Sentra and MHP shall individually or jointly file, within 14 days of the date of this Order, responses to the requests for information attached hereto as Appendix B, along with any other information relevant to Sentra's cost of gas purchased from MHP.
|
2016-00139
|
4/8/2016
|
PSC_ORDER
Order Entered: 1. This proceeding is established to investigate the reasonableness of the proposed AMRP tariff, Gas Tariff, P.S.C. Ky. No. 5, Twelfth Revised Sheet No. 58. 2. The proposed AMRP tariff is suspended for five months from May 31, 2016, up to and including October 30, 2016. 3. Nothing shall prevent the Commission from issuing further Orders prior to the end of the suspension period.
|
2016-00140
|
4/8/2016
|
20160408_DATA_REQUEST.pdf
Data Request
|
2016-00026
|
4/8/2016
|
20160408_DATA_REQUEST.pdf
Data Request
|
2016-00027
|
4/8/2016
|
20160408_PSC_ORDER.pdf
|
2014-00339
|
4/8/2016
|
20160408_PSC_ORDER.pdf
|
2015-00143
|
4/11/2016
|
PSC_ORDER
Final Order Entered: 1. Cedar Hills' and Daviess Fiscal Court's proposed findings of fact are rejected. 2. The request of Cedar Hills to abandon its facilities is granted. 3. Cedar Hills shall continue operating until the Franklin Circuit Court attaches Cedar Hills' assets and appoints a receiver.
4. No later than 60 days following the date of this Order, Cedar Hills shall submit its Report of Gross Operating Revenues and an Annual Report for the period spanning January 1, 2016, through the date of abandonment. 5. Commission Staff shall bring an action in the Franklin Circuit Court for the attachment of Cedar Hills' assets and the appointment of RWRA as receiver.
|
2015-00100
|
4/11/2016
|
PSC_ORDER
Final Order Entered: 1. Friendly Park's and Daviess Fiscal Court's proposed findings of fact are rejected. 2. The request of Friendly Park to abandon its facilities is granted. 3. Friendly Park shall continue operating until the Franklin Circuit Court attaches Friendly Park's assets and appoints a receiver. 4. No later than 60 days following the date of this Order, Friendly Park shall submit its Report of Gross Operating Revenues and an Annual Report for the period spanning January 1, 2016, through the date of abandonment. 5. Commission Staff shall bring an action in the Franklin Circuit Court for the attachment of Friendly Park's assets and the appointment of RWRA as receiver.
|
2015-00101
|
4/11/2016
|
PSC_ORDER
Order Entered: Jimmy Dalton is appointed to fill the existing
vacancy on Western Pulaski County Water District's Board of Commissioners. His term
shall expire on May 22, 2019.
|
2015-00352
|
4/11/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located
approximately 2.5 miles west of Gunlock, Magoffin County, Kentucky. The coordinates
for the proposed facility are North Latitude 37° 32' 29.57" by West Longitude 82° 58'
14".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00370
|
4/11/2016
|
PSC_ORDER
Order Entered: The Applicant Is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located off
Route 1110, approximately 0.7 of a mile northwest of Haddix, Breathitt County,
Kentucky. The coordinates for the proposed facility are North Latitude 37° 29' 29.21" by
West Longitude 83° 21' 33.90".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of 3 months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00390
|
4/11/2016
|
PSC_ORDER
Order Entered: 1. Mr. Graham's request for reconsideration is denied. 2. Mr. Graham's tendered documents shall be considered as public
comment.
|
2015-00404
|
4/11/2016
|
PSC_ORDER
Final Order Entered: 1. EKPC's request for the amendment and extension of its unsecured revolving credit agreement for up to $800 million, as described in its application, for five years from the date of closing and two one-year extensions is approved. 2. EKPC's proposal to amortize the balance in deferred financing fees and the new amendment fees and expenses over the life of the new credit facility is approved. 3. The proceeds resulting from the proposed amendments and extension of the unsecured revolving credit agreement shall be used only for the lawful purposes set out in EKPC's application. 4. The terms and conditions of proposed amendments and extension of the unsecured revolving credit agreement shall be consistent with the terms and conditions described in EKPC's application. 5. EKPC shall, within 30 days of the issuance, file with Commission a statement setting forth the date or dates of issuance of the term loan, accordion feature, or the extension provision authorized herein. For the term loan and accordion feature, the statement shall include the proceeds of such issuances, the interest rate(s), the maturity date(s) and all fees and expenses involved in the issuances of these evidences of indebtedness. 6. Any document filed pursuant to ordering paragraph 5 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00116
|
4/11/2016
|
PSC_ORDER
Order Entered: This matter is continued, pursuant to KRS 278.020(6), for an additional 60
days.
2. Jed Weinberg and Zachery Weinberg are hereby joined as parties to this
action.
3. The procedural schedule set forth in Appendix A to this Order shall be
followed.
a. The information requested in Appendix B to this Order is due on or
before April 29, 2016. Responses to requests for information shall be appropriately
bound, tabbed and indexed, and shall include the name of the witness responsible for
responding to the questions related to the information provided, with copies to all parties
of record, and the original and ten copies to the Commission.
b. Each response shall be answered under oath or, for
representatives of a public or private corporation or a partnership or association or a
governmental agency, be accompanied by a signed certification of the preparer or the
person supervising the preparation of the response on behalf of the entity that the
response is true and accurate to the best of that person's knowledge, information, and
belief formed after a reasonable inquiry.
c. Any party shall make timely amendment to any prior responses if it
obtains information which indicates that the response was incorrect when made or,
though correct when made, is now incorrect in any material respect.
|
2016-00120
|
4/11/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Delta and set forth in the Appendix to this Order are approved for final meter readings on and after April 25, 2016. 2. Within 20 days of the date of this Order, Delta shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00130
|
4/11/2016
|
PSC_ORDER
Order Entered: 1. Oldham Woods' request for deviation from the requirement of 807 KAR 5:076, Section 5(4)(e), is granted. 2. Oldham Woods' application is deemed filed as of the date of this Order.
|
2016-00131
|
4/11/2016
|
20160411_PSC_ORDER.pdf
Order Entered: 1 . This proceeding is initiated to investigate the deficiencies identified in the Commission's December 12, 2014 Inspection Report, Martin District's compliance with the Required Action plan set forth in Appendix A of the Commission's April
|
2016-00142
|
4/11/2016
|
20160411_DATA_REQUEST.pdf
Data Request
|
2015-00418
|
4/11/2016
|
20160411_PSC_ORDER.pdf
|
2015-00355
|
4/11/2016
|
20160411_PSC_ORDER.pdf
|
2015-00271
|
4/11/2016
|
20160411_PSC_ORDER.pdf
|
2016-00104
|
4/12/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 360 feet in height, with attached antenna, and is to be located near
4777 Route 850, approximately 0.8 of a mile north of Hippo, Floyd County, Kentucky.
The coordinates for the proposed facility are North Latitude 37° 32' 38.5" by West
Longitude 82° 51' 56.9".
2. The Applicant shaii file a copy of the final decisions regarding the pending
FAA and KAZC applications for the proposed construction within ten days of receiving
the decisions.
3. The Applicant shale immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
|
2015-00380
|
4/12/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 190 feet in height, with attached antenna, and is to be located near
the corner of Gap Branch Road and East Main Street, Lynch, Marian County, Kentucky.
The coordinates for the proposed facility are North Latitude 36° 57' 47.07" by West
Longitude 82° 54' 26.94".
2. The Applicant shall file a copy of the final decisions regarding the pending
FAA and KAZC applications for the proposed construction within ten days of receiving
the decisions
3. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
4. Documents filed, if any, in the future pursuant to ordering paragraphs 2
and 3 herein shall reference this case number and shall be retained in the utility's
general correspondence file.
|
2015-00421
|
4/12/2016
|
PSC_ORDER
Order Entered: Logan Telephone's petition for confidential treatment is granted.
2. The materials for which Logan Telephone seeks confidential treatment
shall not be placed in the public record or made available for public inspection for a
period of five years from the date of this Order, or until further Order of this Commission.
3. Use of the materials in question in this proceeding shall be in compliance
with 807 KAR 5:001, Section 13(9).
4. Logan Telephone shall inform the Commission if the materials in question
become publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to inspect materials granted
confidential treatment by this Order and the period during which the materials have
been granted confidential treatment has not run, Logan Telephone shall have 20 days
from receipt of written notice of the request to demonstrate that the materials still fall
within the exclusions from disclosure requirements established in KRS 61.878. If Logan
Telephone is unable to make such demonstration, the requested materials shall be
|
2016-00041
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. Ballard Telephone's petition for confidential treatment is granted. 2. The materials for which Ballard Telephone seeks confidential treatment shall not be placed in the public record or made available for public inspection for a period of five years from the date of this Order, or until further Order of this Commission. 3. Use of the materials in question in this proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Ballard Telephone shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, Ballard Telephone shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in
KRS 61.878. If Ballard Telephone is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Ballard Telephone to seek a remedy afforded by law. Otherwise, the Commission shall deny the request for inspection.
|
2016-00042
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. North Central Telephone's petition for confidential treatment is granted. 2. The materials for which North Central Telephone seeks confidential treatment shall not be placed in the public record or made available for public inspection for a period of five years from the date of this Order, or until further Order of this Commission. 3. Use of the materials in question in this proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. North Central Telephone shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, North Central Telephone shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If North Central Telephone is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow North Central Telephone to seek a remedy afforded by law. Otherwise, the Commission shall deny the request for inspection.
|
2016-00043
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. Peoples Rural Telephone's petition for confidential treatment is granted. 2. The materials for which Peoples Rural Telephone seeks confidential treatment shall not be placed in the public record or made available for public inspection for a period of five years from the date of this Order, or until further Order of this Commission. 3. Use of the materials in question in this proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Peoples Rural Telephone shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, Peoples Rural Telephone shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Peoples Rural Telephone is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Peoples Rural Telephone to seek a remedy afforded by law. Otherwise, the Commission shall deny the request for inspection.
|
2016-00044
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. South Central Telephone's petition for confidential treatment is granted. 2. The materials for which South Central Telephone seeks confidential treatment shall not be placed in the public record or made available for public inspection for a period of five years from the date of this Order, or until further Order of this Commission. 3. Use of the materials in question in this proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. South Central Telephone shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, South Central Telephone shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If South Central Telephone is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow South Central Telephone to seek a remedy afforded by law. Otherwise, the Commission shall deny the request for inspection.
|
2016-00045
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. Mountain Rural Telephone's petition for confidential treatment is granted. 2. The materials for which Mountain Rural Telephone seeks confidential treatment shall not be placed in the public record or made available for public inspection for a period of five years from the date of this Order, or until further Order of this Commission. 3. Use of the materials in question in this proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Mountain Rural Telephone shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, Mountain Rural Telephone shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Mountain Rural Telephone is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Mountain Rural Telephone to seek a remedy afforded by law. Otherwise, the Commission shall deny request for inspection.
|
2016-00047
|
4/12/2016
|
PSC_ORDER
Order Entered: West Kentucky Rural Telephone's petition for confidential treatment is
granted.
2. The materials for which West Kentucky Rural Telephone seeks
confidential treatment shall not be placed in the public record or made available for
public inspection for a period of five years from the date of this Order, or until further
Order of this Commission.
3. Use of the materials in question in this proceeding shall be in compliance
with 807 KAR 5:001, Section 13(9).
4. West Kentucky Rural Telephone shall inform the Commission if the
materials in question become publicly available or no longer qualify for confidential
treatment.
5. If a non-party to this proceeding requests to inspect materials granted
confidential treatment by this Order and the period during which the materials have
been granted confidential treatment has not run. West Kentucky Rural Telephone shall
have 20 days from receipt of written notice of the request to demonstrate that the
|
2016-00048
|
4/12/2016
|
PSC_ORDER
Order Entered: Duo County Telephone's petition for confidential treatment Is granted.
2. The materials for which Duo County Telephone seeks confidential
treatment shall not be placed In the public record or made available for public Inspection
for a period of five years from the date of this Order, or until further Order of this
Commission.
3. Use of the materials In question In this proceeding shall be In compliance
with 807 KAR 5:001, Section 13(9).
4. Duo County Telephone shall Inform the Commission If the materials In
question become publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to Inspect materials granted
confidential treatment by this Order and the period during which the materials have
been granted confidential treatment has not run. Duo County Telephone shall have 20
days from receipt of written notice of the request to demonstrate that the materials still
fall within the exclusions from disclosure requirements established In KRS 61.878. If
Duo County Telephone Is unable to make such demonstration, the requested materials
|
2016-00050
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. Foothills Rural Telephone's petition for confidential treatment is granted. 2. The materials for which Foothills Rural Telephone seeks confidential treatment shall not be placed in the public record or made available for public inspection for a period of five years from the date of this Order, or until further Order of this Commission. 3. Use of materials in question in this proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Foothills Rural Telephone shall inform Commission if materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, Foothills Rural Telephone shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Foothills Rural Telephone is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Foothills Rural Telephone to seek a remedy afforded by law. Otherwise, the Commission shall deny the request for inspection.
|
2016-00051
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. The New Service Agreement attached hereto and incorporated herein as 2016-00052-H is made part of this proceeding in order for the Commission to investigate its reasonableness. 2. The New Service Agreement identified as 2016-00052-H herein, was filed
on March 16, 2016, and is suspended for five months from April 15, 2016, up to and including September 14, 2016. 3. Atmos shall respond to all previously issued requests for information in this matter that are pertinent to New Service Agreement 2016-00052-H, within 14 days of the date of this Order. 4. Any additional service agreements renegotiated pursuant to the special contract reformations discussed in pages 14-16 of the Direct Testimony of Gary L. Smith in Case No. 2015-003432 shall be filed for approval into the record of this proceeding along with all information pertaining to such agreements previously required to be submitted in requests for information. 5. All other provisions in this matter not in conflict with this Order shall remain in full force and effect. 6. Nothing shall prevent the Commission from issuing further Orders prior to the end of the suspension period.
|
2016-00052
|
4/12/2016
|
PSC_ORDER
Final Order Entered: 1. Hardin District is granted a CPCN to proceed with the proposed construction as set forth in its application. 2. Hardin District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the approved construction shall be undertaken only with prior approval of Commission. 4. Hardin District shall require construction to be inspected under general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that construction work is done in accordance with contract drawings and specifications and in conformance with best practices of
construction trades involved in the project. 5. Hardin District shall file documentation of total costs of project including cost of construction and all other capitalized costs, (e.g., engineering, legal, and administrative) within 60 days of the date that construction authorized under this CPCN is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of
Accounts for water utilities prescribed by the Commission. 6. Hardin District shall file a copy of the "as-built" drawings and a certified
statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the construction certificated herein.
|
2016-00075
|
4/12/2016
|
PSC_ORDER
Order Entered: 1. EKPC's motion for confidential protection is granted. 2. The materials for which EKPC seeks confidential treatment shall not be
placed in the public record or made available for public inspection for a period of ten years from the date of this Order, or until further Order of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9).
4. EKPC shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, then EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow EKPC to seek a remedy afforded by law.
|
2016-00116
|
4/13/2016
|
PSC_ORDER
Final Order Entered: 1. Neither the EISA Smart Grid Information Standard nor the EISA 2007 Smart Grid Investment Standard shall be adopted.
2. The Joint Utilities shall develop policies and procedures that provide customers access to historical information regarding their energy use and tariff rate and shall endeavor to provide this information to customers in as close to real-time as practical. Furthermore, the Joint Utilities shall provide aggregated information to CAC upon its reasonable request. 3. The Joint Utilities shall develop internal policies and procedures governing customer privacy, customer education, and cybersecurity as set forth in this Order. 4. Within 60 days of the date of this Order, the Joint Utilities shall file with the Commission their internal procedures governing customer privacy and customer education. 5. Within 60 days of the date of this Order, the Joint Utilities shall certify to the Commission that they have developed internal cybersecurity procedures. 6. The jurisdictional electric utilities shall not be required to develop Dynamic Pricing programs and tariffs, but they are encouraged to do so.
7. Customer participation in any Dynamic Pricing program or tariff shall be voluntary. 8. Provisions allowing customers to opt out of smart meter deployments shall be considered as they are proposed by individual utilities.
|
2012-00428
|
4/13/2016
|
PSC_ORDER
Order Entered: 1. The Staff Report on EKPC's 2015 IRP represents the final substantive action in this matter. 2. Any comments with respect to the Staff Report shall be filed within ten days of the date of this Order. 3. An Order closing this case and removing it from the Commission's docket
shall be issued after the period for comments on the Staff Report has expired.
|
2015-00134
|
4/13/2016
|
PSC_ORDER
Order Entered: GoGo's application for authority to construct
a wireless communication tower pursuant to KRS 278.650 is rejected due to lack of
Commission jurisdiction.
|
2015-00310
|
4/13/2016
|
PSC_ORDER
Order Entered: 1. The Companies' request to hold this case in abeyance is denied. 2. The procedural schedule appended hereto shall be followed for the remainder of this proceeding.
|
2015-00367
|
4/13/2016
|
PSC_ORDER
Order Entered: The rate proposed by Navitas KY is denied.
2. The rate set forth in the Appendix to this Order is approved for service
rendered by Navitas on and after May 1, 2016.
3. Within 20 days of the date of this Order, Navitas KY shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00149
|
4/13/2016
|
20160413_PSC_ORDER.pdf
|
2014-00131
|
4/13/2016
|
20160413_PSC_ORDER.pdf
|
2016-00127
|
4/13/2016
|
20160413_PSC_ORDER.pdf
|
2015-00364
|
4/14/2016
|
PSC_ORDER
Order Entered: 1. The Trustee's Motion for Rehearing of the Order granting the Joint Motion of the AG and BCSD to dismiss the surcharge application without prejudice is denied. 2. The Trustee's Motion to Intervene is denied. 3. This case is dismissed without prejudice and is removed from the Commission's docket.
|
2014-00255
|
4/14/2016
|
PSC_ORDER
Order Entered: 1. Logan's proposed increases in basic local residential exchange service rates, and reduction of the rate for Caller ID, as set forth in the tariffs attached to its Application filed on March 30, 2014, and shown in the Appendix attached to this Order, are approved. 2. Within 20 days of the date of this Order, Logan shall file, using the Commission's electronic Tariff Filing System, its revised tariff sheets containing the
rates approved herein and signed by an officer of the utility authorized to issue tariffs. The tariff sheets shall reflect that they were approved pursuant to this Order and shall contain an effective date of June 1, 2016. 3. Any future increases to basic local exchange rates necessitated by the FCC's ICC/USF Order shall be filed as an Application in compliance with Commission regulations.
|
2016-00041
|
4/14/2016
|
PSC_ORDER
Final Order Entered: 1. Ballard's proposed increases in basic local exchange residential and business service rates, as set forth in the tariffs attached to its Application filed March 16, 2016, and shown in the Appendix attached to this Order, are approved. 2. Within 20 days of the date of this Order, Ballard shall file, using the Commission's electronic Tariff Filing System, its revised tariff sheets containing the rates approved herein and signed by an officer of the utility authorized to issue tariffs. The tariff sheets shall reflect that they were approved pursuant to this Order and shall contain an effective date of June 1, 2016. 3. Any future increases to basic local exchange rates necessitated by the FCC's ICC/USF Order shall be filed as an Application in compliance with Commission regulations.
|
2016-00042
|
4/14/2016
|
PSC_ORDER
Final Order Entered: 1. North Central's proposed increases in basic local exchange residential service rate, as set forth in the tariffs attached to its Application filed on March 16, 2016, and shown in the Appendix attached to this Order, are approved. 2. Within 20 days of the date of this Order, North Central shall file, using the Commission's electronic Tariff Filing System, its revised tariff sheets containing the rates approved herein and signed by an officer of the utility authorized to issue tariffs. The tariff sheets shall reflect that they were approved pursuant to this Order and shall contain an effective date of June 1, 2016. 3. Any future increases to basic local exchange rates necessitated by the FCC's ICC/USF Order shall be filed as an Application in compliance with Commission regulations.
|
2016-00043
|
4/14/2016
|
PSC_ORDER
Final Order Entered: 1. Peoples' proposed increase in basic residential local service rates and expansion of the local calling area, as set forth in the tariff attached to its Application filed on March 16, 2016, and shown in the Appendix attached to this Order, is approved. 2. Within 20 days of the date of this Order, Peoples shall file, using the Commission's electronic Tariff Filing System, its revised tariff sheets containing the rates approved herein and signed by an officer of the utility authorized to issue tariffs. The tariff sheets shall reflect that they were approved pursuant to this Order and shall contain an effective date of June 1, 2016. 3. Any future increases to basic local exchange rates necessitated by the
FCC's ICC/USF Order shall be filed as an Application in compliance with Commission regulations.
|
2016-00044
|
4/14/2016
|
PSC_ORDER
Final Order Entered: 1. South Central's proposed increases in basic local exchange residential service rates and business rates, as set forth in the tariffs attached to its Application filed on March 16, 2016, and shown in the Appendix attached to this Order, are approved. 2. Within 20 days of the date of this Order, South Central shall file, using the Commission's electronic Tariff Filing System, its revised tariff sheets containing the rates approved herein and signed by an officer of the utility authorized to issue tariffs. The tariff sheets shall reflect that they were approved pursuant to this Order and shall contain an effective date of June 1, 2016. 3. Any future increases to basic local exchange rates necessitated by the
FCC's ICC/USF Order shall be filed as an Application in compliance with Commission regulations.
|
2016-00045
|
4/14/2016
|
PSC_ORDER
Final Order Entered: Mountain's proposed increase in basic local residential exchange service rate and expansion of its local calling area, as set forth in the tariffs attached to its Application filed March 16, 2016, and shown in the Appendix attached to this Order, are approved. 2. Within 20 days of the date of this Order, Mountain shall file, using the Commission's electronic Tariff Filing System, its revised tariff sheets containing the
rates approved herein and signed by an officer of the utility authorized to issue tariffs. The tariff sheets shall reflect that they were approved pursuant to this Order and shall contain an effective date of June 1, 2016. 3. Any future increases to basic local exchange rates necessitated by the FCC's ICC/USF Order shall be filed as an Application in compliance with Commission regulations.
|
2016-00047
|
4/14/2016
|
PSC_ORDER
Final Order Entered: 1. West Kentucky's proposed increases in basic local residential exchange service rates, as set forth in the tariffs attached to its Application filed on March 31, 2016, and shown in the Appendix attached to this Order, are approved. 2. Within 20 days of the date of this Order, West Kentucky shall file, using the Commission's electronic Tariff Filing System, its revised tariff sheets containing the rates approved herein and signed by an officer of the utility authorized to issue tariffs. The tariff sheets shall reflect that they were approved pursuant to this Order and shall contain an effective date of June 1, 2016. 3. Any future increases to basic local exchange rates necessitated by the FCC's ICC/USF Order shall be filed as an Application in compliance with Commission regulations.
|
2016-00048
|
4/14/2016
|
PSC_ORDER
Order Entered: Duo County's proposed increase in basic local residential exchange
service rate and expansion of its toll-free calling area, as set forth in the tariffs attached
|
2016-00050
|
4/14/2016
|
PSC_ORDER
Order Entered: Foothills' proposed increase in basic local residential exchange service
rate, and the expansion of local calling, as set forth in the tariffs attached to its
Application filed on March 29, 2016, and shown in the Appendix attached to this Order,
are approved.
|
2016-00051
|
4/14/2016
|
PSC_ORDER
Final Order Entered: 1. The Applicant is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located at 1112 Cindas Creek, West Liberty, Morgan County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 57' 33.38" by West Longitude 83° 2' 32.4". 2. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00091
|
4/14/2016
|
PSC_ORDER
Order Entered: 1 . EKPC and each of its Member Cooperatives listed in footnote 2 shall be parties to this case. 2. The procedural schedule set forth in Appendix A to this Order shall be followed in this proceeding. 3. Any person who submits a motion to intervene after May 16, 2016, and
upon a showing of good cause is granted full intervention, shall accept and abide by the existing procedural schedule. 4.. EKPC shall, by the date set forth in Appendix A, file its prepared direct testimony in support of the reasonableness of the application of its environmental surcharge mechanism and the application of the pass-through mechanism during the periods under review. 5. Any party filing testimony shall file an original and seven copies. 6. a. EKPC and each of its 16 Member Cooperatives shall file responses to the questions asked of the particular cooperative in Appendix B. The information requested herein is due no later than May 6, 2016. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and seven copies to the Commission.
|
2016-00144
|
4/15/2016
|
PSC_ORDER
Final Order Entered: 1. Complainant's Complaint is dismissed with prejudice. 2. This matter is closed and removed from the Commission's docket.
|
2015-00260
|
4/15/2016
|
STAFF_REPORT
NOTICE OF FILING OF COMMISSION STAFF REPORT
|
2015-00428
|
4/15/2016
|
PSC_ORDER
Final Order Entered: 1. The Transportation Agreement between Navitas and FSR is approved. 2. Navitas shall construct the facilities required to serve FSR to meet all applicable requirements as set out in Title 49 CFR Part 192 and 807 KAR 5:022. 3. Navitas shall ensure the facilities are constructed and tested by individuals qualified to perform the work described in the application. 4. Navitas shall notify the Commission one week prior to the actual start of construction, at the 50 percent completion point, and when construction is complete. 5. Navitas shall file a report with the Commission, before the pipeline is placed into service, certifying the maximum allowable operating pressure of the pipeline and also certifying that the pipeline has been constructed and tested in accordance with the applicable requirements as set out in Title 49 CFR Part 192 and 807 KAR 5:022.
|
2016-00065
|
4/15/2016
|
PSC_ORDER
Final Order Entered: 1. The Applicant is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located near 13476 S. E. Licking River Road, approximately 1.6 miles northwest of Gapville, Magoffin County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 38'
18.55" by West Longitude 82° 59' 1 0.77". 2. The Applicant shall file a copy of the final decisions regarding the pending FAA and KAZC applications for the proposed construction within 10 days of receiving the decisions. 3. The Applicant shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 4. Documents filed, if any, in the future pursuant to ordering paragraphs 2 and 3 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00087
|
4/15/2016
|
DATA_REQUEST
COMMISSION STAFF'S INITIAL REQUEST FOR INFORMATION
TO DEXTER-ALMO HEIGHTS WATER DISTRICT
|
2016-00114
|
4/15/2016
|
PSC_ORDER
Order Entered: 1. No later than July 11, 2016, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings and recommendations regarding Oldham Woods's requested rate adjustment. 2. No later than July 25, 2016, or 14 days after the date of the filing of the Commission Staff Report, whichever occurs earlier, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings and recommendations contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If a party requests a hearing or informal conference, then the party shall make the request in its written comments and state the reason why a hearing or informal conference is necessary. 4. If Commission Staff finds that Oldham Woods's financial condition supports a higher rate than Oldham Woods proposes or the assessment of an additional rate or charge not proposed in Oldham Woods's application, Oldham Woods in its response to the Commission Staff Report shall also state its position in writing on
whether the Commission should authorize the assessment of the higher rate or the recommended additional rate or charge.
|
2016-00131
|
4/15/2016
|
PSC_ORDER
Final Order Entered: 1. Henderson County is authorized to enter into an agreement with KRWFC to borrow no more than $3,547,500 for the purpose of re-amortizing the outstanding indebtedness, but only under such terms and conditions that will produce both positive gross savings and net present value savings. 2. If the actual terms and conditions of the agreement with KRWFC differ from those set forth in its application, Henderson County shall, within 30 days of executing the loan agreement, file with the Commission amortization schedules and work papers showing the actual gross savings and net present value savings that will result from the refinancing. 3. Within 30 days of executing the proposed agreement, Henderson County shall file a copy of the executed Assistance Agreement and any documents referenced in the executed Assistance Agreement that Henderson County has not previously filed with the Commission. 4. The proceeds from the Assistance Agreement shall be used only for the lawful purposes specified in Henderson County's application. 5. Any documents filed pursuant to ordering paragraphs 2 and 3 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00133
|
4/15/2016
|
PSC_ORDER
Final Order Entered: 1. Warren County is authorized to enter into an agreement with KRWFC to borrow no more than $2,601,500 for the purpose of re-amortizing the outstanding indebtedness, but only under such terms and conditions that will produce both positive gross savings and net present value savings. 2. If the actual terms and conditions of the agreement with KRWFC differ from those set forth in its application, Warren County shall, within 30 days of executing the loan agreement, file with the Commission amortization schedules and work papers showing the actual gross savings and net present value savings that will result from the refinancing. 3. Within 30 days of executing the proposed agreement, Warren County shall file a copy of the executed Assistance Agreement and any documents referenced in the executed Assistance Agreement that Warren County has not previously filed with the Commission. 4 . The proceeds from the Assistance Agreement shall be used only for the
lawful purposes specified in Warren County's application. 5. Any documents filed pursuant to ordering paragraphs 2 and 3 of this Order
shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00134
|
4/15/2016
|
PSC_ORDER
Final Order Entered: 1. Christian County is authorized to enter into an agreement with KRWFC to borrow no more than $2,546,500 for the purpose of re-amortizing the outstanding indebtedness, but only under such terms and conditions that will produce both positive gross savings and net present value savings. 2. If the actual terms and conditions of the agreement with KRWFC differ from those set forth in its application, Christian County shall, within 30 days of executing the loan agreement, file with the Commission amortization schedules and work papers the loan agreement, file with the Commission amortization schedules and work papers showing the actual gross savings and net present value savings that will result from the refinancing. 3. Within 30 days of executing the proposed agreement, Christian County shall file a copy of the executed Assistance Agreement and any documents referenced in the executed Assistance Agreement that Christian County has not previously filed
with the Commission. 4. The proceeds from the Assistance Agreement shall be used only for the lawful purposes specified in Christian County's application. 5. Any documents filed pursuant to ordering paragraphs 2 and 3 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00138
|
4/15/2016
|
PSC_ORDER
Order Entered: The presentations at the KRWA regional meetings held April 12, 2016, in
Morehead, Kentucky; April 14, 2016, in Hartford, Kentucky; and to be held on April 21,
2016, In Draffenville, Kentucky, are accredited and approved for a maximum of two
credit hours of water district management training per meeting.
2. KRWA shall retain a record of all water district commissioners attending
the accredited and approved presentations.
3. No later than 30 days after each presentation, KRWA shall file with the
Commission:
a. A sworn statement attesting that the accredited instruction was
performed;
b. A description of any changes in the presenters or the proposed
curriculum that occurred after KRWA's application;
c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended;
d. A copy of any written material given to water commissioners
attending each presentation; and
e. Documents indicating whether the Kentucky Board of Certification
of Water Treatment and Distribution System Operators and the Kentucky Board of
Certification of Wastewater System Operators approved the trainings for continuing
education credit.
|
2016-00150
|
4/15/2016
|
PSC_ORDER
Order Entered: The presentation at the 2016 Operator EXPO, to be held May 24-25,
2016, in Glendale, Kentucky, is accredited and approved for a maximum of ten credit
hours of water district management training.
2. KRWA shall retain a record of all water district commissioners attending
the accredited and approved presentations.
3. No later than 30 days after each presentation, KRWA shall file with the
Commission:
a. A sworn statement attesting that the accredited instruction was
performed;
b. A description of any changes in the presenters or the proposed
curriculum that occurred after KRWA's application;
c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended;
d. A copy of any written material given to water commissioners
attending the presentations; and
e. Documents indicating whether the Kentucky Board of Certification
of Water Treatment and Distribution System Operators and the Kentucky Board of
Certification of Wastewater System Operators approved the training for continuing
education credit.
|
2016-00151
|
4/15/2016
|
PSC_ORDER
Final Order Entered: 1. Delta is granted a CPCN that authorizes it to bid on a franchise offered by the city of Owingsville, Kentucky, for the distribution of natural gas. 2. If Delta is not the successful bidder, Delta shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Delta was not the successful bidder. 3. If Delta is the successful bidder, Delta shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Delta is the successful bidder, Delta shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00155
|
4/15/2016
|
20160415_PSC_ORDER.pdf
|
2015-00039
|
4/18/2016
|
20160418_DATA_REQUEST.pdf
Data Request
|
2015-00227
|
4/19/2016
|
20160419_PSC_IC_NOTICE.pdf
Commission Staff's Notice of Informal Conference
|
2014-00267
|
4/21/2016
|
DATA_REQUEST
COMMISSION STAFF'S SECOND REQUEST FOR INFORMATION TO
LICKING VALLEY RURAL ELECTRIC COOPERATIVE CORPORATION
|
2016-00077
|
4/21/2016
|
NOTICE
Notice of Filing of Commission Staff Correction
|
2016-00086
|
4/21/2016
|
PSC_ORDER
Order Entered: North Mercer is HEREBY ORDERED to satisfy the matters complained of or file a written answer to the complaint within ten
days from the date of service of this Order.
|
2016-00154
|
4/21/2016
|
20160421_DATA_REQUEST.pdf
Data Request
|
2016-00073
|
4/29/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to B&H Gas Company and B&S Oil and Gas Company
|
2015-00367
|
4/29/2016
|
20160429_DATA_REQUEST.pdf
Commission Staff's First Request for Information to Kenergy Corp. and Big Rivers Electric Corporation
|
2016-00117
|
4/29/2016
|
20160429_DATA_REQUEST.pdf
Data Request
|
2015-00343
|
4/29/2016
|
20160429_DATA_REQUEST.pdf
(Copied from Case: 2016-00070 )Data Request
|
2015-00343
|
4/29/2016
|
20160429_DATA_REQUEST.pdf
Data Request
|
2016-00070
|
5/2/2016
|
20160502_PSC_ORDER.pdf
The motion of KlUC to intervene is granted.
|
2016-00117
|
5/2/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00139
|
5/2/2016
|
20160502_PSC_ORDER.pdf
|
2016-00026
|
5/2/2016
|
20160502_PSC_ORDER.pdf
|
2016-00027
|
5/3/2016
|
PSC_ORDER
Final Order Entered: 1. EKPC shall file its next IRP no later than April 1, 2019. 2. This case is closed and removed from the Commission's docket.
|
2015-00134
|
5/3/2016
|
PSC_ORDER
Order Entered: PlatinumTel's motion to withdraw its petition for designation as an ETC in
Kentucky is granted.
2. This matter is closed and removed from the Commission's docket.
|
2016-00030
|
5/3/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $(0.79) per 1,000 gallons is
approved.
2. Beech Grove's proposed rates are denied.
3. The rates set forth in Appendix B to this Order are approved for water
service rendered by Beech Grove on and after March 1, 2016.
4. Within 20 days of the date of this Order, Beech Grove shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00145
|
5/3/2016
|
PSC_ORDER
Final Order Entered: 1. Atmos is granted a CPCN that authorizes it to bid on a franchise offered by the city of Calhoun, Kentucky, for the transmission and distribution of natural gas. 2. If Atmos is not the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Atmos was not the successful bidder. 3. If Atmos is the successful bidder, Atmos shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Atmos is the successful bidder, Atmos shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00156
|
5/4/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00106
|
5/4/2016
|
DATA_REQUEST
COMMISSION STAFF'S SECOND REQUEST FOR INFORMATION
TO COLUMBIA GAS OF KENTUCKY
|
2016-00107
|
5/4/2016
|
DATA_REQUEST
Commission Staff's Initial Request for Information to Columbia Gas of Kentucky, Inc.
|
2016-00140
|
5/4/2016
|
20160504_STAFF_REPORT.pdf
Staff Report
|
2016-00054
|
5/5/2016
|
PSC_ORDER
Final Order Entered: 1 . The Applicant is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 310 feet in height, with attached antenna, and is to be located at 4156 Coffee Creek Road, West Liberty, Morgan County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 53' 7.29" by West Longitude 83° 2' 20.37".
2. The Applicant shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2015-00385
|
5/5/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to WKG Storage, Inc.
|
2016-00053
|
5/5/2016
|
PSC_ORDER
Order Entered: No later than July 21, 2016, Commission Staff shall file with the
Commission and serve upon all parties of record a written report containing its findings
and recommendations regarding Morgan District's requested rate adjustment.
2. No later than 14 days after the date of the filing of the Commission Staff
Report each party of record shall file with the Commission:
a. Its written comments on and any objections to the findings
contained in the Commission Staff Report; and
|
2016-00068
|
5/5/2016
|
DATA_REQUEST
Commission Staff's Supplemental Request for Information to William Weinberg, Lois Weinberg, Jed Weinberg, and Zachery Weinberg
|
2016-00120
|
5/5/2016
|
20160505_PSC_ORDER.pdf
Order Entered: 1. Martin District's Motion for Extension is granted. Martin District's responses to Staff's Initial Request shall be filed on or before May 9, 2016. 2. The informal conference scheduled for May 17, 2016, is rescheduled to May 18, 2016, at 1
|
2016-00142
|
5/5/2016
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Corinth, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00165
|
5/5/2016
|
20160505_PSC_ORDER.pdf
|
2016-00082
|
5/5/2016
|
20160505_PSC_ORDER.pdf
|
2016-00083
|
5/5/2016
|
20160505_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00059
|
5/5/2016
|
20160505_DATA_REQUEST.pdf
Data Request
|
2016-00109
|
5/5/2016
|
20160505_PSC_ORDER.pdf
|
2015-00382
|
5/5/2016
|
20160505_PSC_ORDER.pdf
|
2016-00059
|
5/5/2016
|
20160505_PSC_ORDER01.pdf
|
2016-00059
|
5/5/2016
|
20160505_PSC_ORDER.pdf
|
2015-00312
|
5/5/2016
|
20160505_PSC_ORDER.pdf
|
2016-00146
|
5/5/2016
|
20160505_PSC_ORDER.pdf
|
2016-00152
|
5/9/2016
|
DATA_REQUEST
COMMISSION STAFF'S SECOND SUPPLEMENTAL REQUEST FOR INFORMATION
TO WILLIAM WEINBERG. LOIS WEINBERG. JED WEINBERG. AND ZACHERY
WEINBERG
|
2016-00120
|
5/9/2016
|
PSC_ORDER
Order Entered: The motion of the Attorney General to intervene is granted.
2. The Attomey General shall be entitled to the full rights of a party and shall
be served with the Commission's Orders and with filed testimony, exhibits, pleadings,
correspondence, and ail other documents submitted by parties after the date of this
Order.
3. The Attorney General shall comply with all provisions of the Commission's
regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents.
4. Within seven days of entry of this Order, the Attomey General shall
provide his electronic mail address to which ail electronic documents issued by the
Commission and other parties of record may be served upon the Attomey General in
accordance with 807 KAR 5:001, Section 4(8)(b).
5. Pursuant to 807 KAR 5:004, Section 11(d), the Attorney General shall be
subject to the existing procedural schedule.
|
2016-00139
|
5/10/2016
|
PSC_ORDER
Order Entered: 1. Within 14 days of the date of this Order, Wood Creek shall notify its customers of its intent to implement the water and sewer service rates set forth in the Appendix to this Order by publishing notice of the increase in a newspaper of general circulation in its territory or placing an insert in bills rendered to its customers. The customer notice shall be in the format set forth in the Appendix to this Order. 2. Wood Creek shall provide proof of publication of the notice to the Commission no later than 30 days from the date of this Order. 3. If the Commission does not receive any written requests for intervention or a hearing in this matter within 30 days of publication of new rates, this case shall stand
submitted to the Commission for decision based upon the existing record.
|
2015-00428
|
5/10/2016
|
PSC_ORDER
Order Entered: Reid Village is authorized to enter into the proposed Assistance
Agreement with KIA and, under the terms of that Agreement, to borrow from KIA an
amount not to exceed $401,625 to be repaid over a 30-year period at an interest rate of
1.75 percent per annum.
2. Within 30 days of executing the proposed Assistance Agreement with KIA,
Reid Village shall file with the Commission an executed copy of the Assistance
Agreement. Reid Village shall use the proceeds from the proposed Assistance
Agreement with KIA only for the lawful purposes set forth in its application. None of the
proceeds shall be used for the construction of any other improvements or any other
project except those clearly identified in Reid Village's application in this proceeding,
unless and until Reid Village obtains prior Commission approval for the use of the
proceeds.
3. Any documents filed in the future pursuant to ordering paragraph 2 shall
reference this case number and shall be retained in the utility's general correspondence
file.
®
|
2016-00086
|
5/10/2016
|
PSC_ORDER
Order Entered: Duke Kentucky's request to amend the
Smart Saver EE Products program as set out in its application is approved.
|
2016-00112
|
5/10/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Sentra Corporation
|
2016-00139
|
5/10/2016
|
20160510_PSC_ORDER.pdf
|
2016-00059
|
5/11/2016
|
20160511_DATA_REQUEST.pdf
Data Request
|
2016-00162
|
5/11/2016
|
20160511_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00160
|
5/11/2016
|
20160511_DATA_REQUEST.pdf
Data Request
|
2016-00147
|
5/11/2016
|
20160511_PSC_ORDER.pdf
|
2016-00054
|
5/12/2016
|
20160512_PSC_ORDER.pdf
|
2015-00418
|
5/13/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to EQT Midstream
|
2015-00269
|
5/13/2016
|
PSC_ORDER
Final Order Entered: 1. Hardin District is granted a CPCN for the proposed construction as set forth in its application. 2. Hardin District's proposed plan of financing is approved. 3. Hardin District is authorized to issue $5,000,000 of its water system revenue bonds maturing over 40 years at an interest rate not exceeding 4.125 percent per annum. 4. The proceeds from the proposed bond issuance shall be used only for the purposes specified in Hardin District's application. 5. Hardin District shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Hardin District may use such surplus to construct additional plant facilities if AD approves of the use and the additional construction will not result in a change in Hardin District's rates for service. Hardin District shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4. 7. Hardin District shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs (e.g., engineering, legal, and administrative) within 60 days of the date that construction is substantially completed.
|
2016-00148
|
5/13/2016
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Danville, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00170
|
5/13/2016
|
20160513_DATA_REQUEST.pdf
Data Request
|
2016-00159
|
5/13/2016
|
20160513_PSC_ORDER.pdf
(Copied from Case: 2016-00070 )Order
|
2015-00343
|
5/13/2016
|
20160513_PSC_ORDER.pdf
|
2016-00070
|
5/13/2016
|
20160513_PSC_ORDER.pdf
|
2015-00343
|
5/13/2016
|
20160513_PSC_ORDER.pdf
|
2016-00073
|
5/17/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located near
124 Charles Back Drive, approximately seven-tenths of a mile northwest of Wolf Coal,
Breathitt County, Kentucky. The coordinates for the proposed facility are North Latitude
37° 24' 4.83" by West Longitude 83° 23' 26.19".
2. The Applicant shall immediately notify the Commission in writing if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00377
|
5/17/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located
approximately 1.3 miles south of Gunlock, Magoffin County, Kentucky. The coordinates
for the proposed facility are North Latitude 37° 31' 42.88" by West Longitude 82° 55'
21.03".
2. The Applicant shall immediately notify the Commission in writing if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00381
|
5/17/2016
|
PSC_ORDER
Order Entered: KU Is granted a CPCN that authorizes it to bid on a franchise offered by
the city of Nortonville, Kentucky, for electric transmission and distribution service.
2. If KU is not the successful bidder, KU shall, within ten days of the award of
the franchise at issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU is the successful bidder, KU shall, within ten days of the award of the
franchise at issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the initial franchise fee.
4. If KU is the successful bidder, KU shall, within ten days of an increase or
decrease in the amount of the initial franchise fee set forth in the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00171
|
5/17/2016
|
20160517_PSC_ORDER.pdf
|
2016-00152
|
5/18/2016
|
20160518_DATA_REQUEST.pdf
Data Request
|
2016-00026
|
5/18/2016
|
20160518_DATA_REQUEST.pdf
Data Request
|
2016-00027
|
5/19/2016
|
PSC_ORDER
Order Entered: The PRP rates in Appendix A to this Order are approved for billing by
Delta for meters read on and after May22, 2016.
2. Delta shall file the information requested in Appendix B to this Order when
it files its future annual PRP applications.
3. Within 20 days of the date of this Order, Delta shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00110
|
5/19/2016
|
PSC_ORDER
Order Entered: No later than August 11, 2016, Commission Staff shall file with the
Commission and serve upon all parties of record a written report containing its findings
and recommendations regarding Marion District's requested rate adjustment.
2. No later than 14 days after the date of the filing of the Commission Staff
Report each party of record shall file with the Commission:
a. Its written comments on and any objections to the findings
contained in the Commission Staff Report; and
|
2016-00163
|
5/19/2016
|
20160519_PSC_ORDER.pdf
|
2016-00143
|
5/19/2016
|
20160519_PSC_ORDER.pdf
|
2015-00039
|
5/20/2016
|
PSC_ORDER
Final Order Entered: 1 . Lake Village is granted a CPCN for the proposed construction as set forth in its application. 2. Lake Village's proposed plan of financing is approved. 3. Lake Village is authorized to issue $656,000 of its water system revenue bonds maturing over 40 years at an interest rate not exceeding 3.5 percent per annum. 4. The proceeds from the proposed bond issuance shall be used only for the purposes specified in Lake Village's application. 5. Lake Village shall obtain approval from the Commission prior to performing any additional construction not expressly authorized by this Order. 6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after the approved construction has been completed, Lake Village may use such surplus to construct additional plant facilities if RD approves of the use and the additional construction will not result in a change in Lake Village's rates for service. Lake Village shall provide written notice of this additional construction in accordance with 807 KAR 5:069, Section 4. 7. Lake Village shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs within 60 days of the date that construction is substantially completed.
|
2016-00153
|
5/20/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.06 per 1,000 gallons is
approved.
2. Garrard County's proposed rates, as set forth in Appendix Bto this Order,
are approved for services rendered on and after May 3, 2016.
3. Within 20 days of the date of this Order, Garrard County shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00161
|
5/20/2016
|
PSC_ORDER
Order Entered: KU is granted a CPCN that authorizes it to bid on a franchise offered by
the city of Mt. Olivet, Kentucky, for electric transmission and distribution service.
2. If KU is not the successful bidder, KU shall, within ten days of the award of
the franchise at issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU is the successful bidder, KU shall, within ten days of the award of the
franchise at issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the initial franchise fee.
4. If KU is the successful bidder, KU shall, within ten days of an increase or
decrease in the amount of the initial franchise fee set forth in the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00175
|
5/20/2016
|
20160520_PSC_ORDER.pdf
|
2016-00160
|
5/23/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located at
260 Hog Branch, West Liberty, Morgan County, Kentucky. The coordinates for the
proposed facility are North Latitude 37° 55' 7.80" by West Longitude 83° 2' 40.45".
2. The Applicant shall immediately notify the Commission in writing if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00386
|
5/23/2016
|
PSC_ORDER
Order Entered: The Applicants are granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 295 feet in height, with attached antenna, and is to be located at
751 Forrest Road, Grand Rivers, Livingston County, Kentucky. The coordinates for the
proposed facility are North Latitude 37° 2' 46.21" by West Longitude 88° 16' 25.36".
2. The Applicants shall immediately notify the Commission in writing if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00078
|
5/23/2016
|
20160523_PSC_ORDER.pdf
Order Entered: no later than May 25, 2016, each of the
intervenors to this matter shall file a statement as to whether there are any material
issues of fact that warrant a hearing, along with a detailed description of those issues,
or whether this case
|
2016-00117
|
5/23/2016
|
DATA_REQUEST
Commission Staff's Supplemental Request for Information to Columbia Gas of Kentucky, Inc.
|
2016-00140
|
5/23/2016
|
20160523_PSC_ORDER.pdf
|
2016-00073
|
5/23/2016
|
20160523_DATA_REQUEST.pdf
Data Request
|
2015-00418
|
5/23/2016
|
20160523_DATA_REQUEST.pdf
Data Request
|
2016-00152
|
5/24/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00056
|
5/24/2016
|
20160524_PSC_ORDER.pdf
|
2015-00312
|
5/24/2016
|
20160524_DATA_REQUEST.pdf
Data Request
|
2016-00169
|
5/27/2016
|
PSC_ORDER
Order Entered: 1. Within seven days of the date of this Order, the Companies shall respond to the Staff's and AG's Supplemental Requests.
2. If responses are not received with seven days of the date of this Order, a show cause proceeding will be initiated to determine whether there are any reasons why penalties should not be imposed upon the Companies pursuant to KRS 278.990 for their failure to comply with this Order.
|
2015-00367
|
5/27/2016
|
20160527_PSC_ORDER.pdf
|
2016-00167
|
5/27/2016
|
20160527_DATA_REQUEST.pdf
Data Request
|
2016-00143
|
5/27/2016
|
20160527_PSC_ORDER.pdf
|
2016-00059
|
5/31/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2016-00077
|
5/31/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Big Rivers Electric Corporation
|
2016-00124
|
5/31/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Columbia and set forth in the Appendix to this Order are approved for billing for the June 2016 billing cycle beginning on May 31, 2016. 2. Within 20 days of the date of this Order, Columbia shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates and ACA and BA mechanism revisions approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00166
|
5/31/2016
|
20160531_PSC_ORDER.pdf
|
2015-00382
|
5/31/2016
|
20160531_PSC_ORDER.pdf
|
2016-00147
|
5/31/2016
|
20160531_PSC_ORDER.pdf
|
2015-00418
|
6/2/2016
|
20160602_PSC_ORDER.pdf
|
2016-00168
|
6/3/2016
|
20160603_DATA_REQUEST.pdf
Data Request
|
2016-00174
|
6/6/2016
|
PSC_ORDER
Final Order Entered: 1. Dexter-Almo's request to deviate from the water storage requirements of 807 KAR 5:066, Section 4(4), is approved through December 31, 2018. 2. Dexter-Almo shall inform the Commission if changes occur in either system that would cause Murray to have insufficient storage for Dexter-Almo. 3. Any documents filed in the future pursuant to this Order shall reference this case number and shall be retained in Dexter-Almo's general correspondence file.
|
2016-00114
|
6/6/2016
|
PSC_ORDER
Order Entered: 1. Frontier's request for deviation from the filing requirements of 807 KAR 5:001, Sections 16(4)(g)-U), 16(4)(1-n), 16(4)(r), and 16(4)(u), is granted. 2. Frontier's request for deviation from the filing requirements of 807 KAR 5:00 , Section 16(4)(k), is denied. 3. Frontier's application in this matter shall not be accepted for filing until it has cured its deficiency pursuant to 807 KAR 5:001, Section 16(4)(k), which requires an
independent auditor's annual opinion report, with any written communication which indicates existence of material weakness in internal controls.
|
2016-00132
|
6/6/2016
|
PSC_ORDER
Final Order Entered: 1. LGE is granted a CPCN that authorizes it to bid on a franchise offered by Louisville Metro Government for natural gas transmission and distribution service. 2. If LGE is not the successful bidder, LGE shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that LGE was not the successful bidder. 3. If LGE is the successful bidder, LGE shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If LGE is the successful bidder, LGE shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities within the area subject to the jurisdiction of Louisville Metro Government.
|
2016-00193
|
6/6/2016
|
20160606_DATA_REQUEST.pdf
Data Request
|
2015-00343
|
6/6/2016
|
20160606_PSC_ORDER.pdf
|
2016-00026
|
6/6/2016
|
20160606_PSC_ORDER.pdf
|
2016-00027
|
6/6/2016
|
20160606_PSC_ORDER.pdf
|
2016-00033
|
6/6/2016
|
20160606_PSC_ORDER.pdf
|
2016-00172
|
6/8/2016
|
PSC_ORDER
Order Entered: 1. The Companies' motion requesting an extension of time to file their responses to Staffs Second Request and the AG's Supplemental Request is granted. 2. The Companies shall file their responses to the AG's Supplemental Request by June 13, 2016.
|
2015-00367
|
6/9/2016
|
DATA_REQUEST
Commission Staff's Third Request for Information to Columbia Gas of Kentucky
|
2016-00107
|
6/10/2016
|
PSC_ORDER
Order Entered: 1. EKPC's motion to extend for 30 days, through June 27, 2016, the period of abeyance is granted to the extent that the Commission shall take no action on EKPC's application during that time period to allow EKPC time to reduce into writing the proposal for the mechanism to flow back the net PJM-related capacity benefits to EKPC's customers and to discuss the details of that proposal with the parties to this case and Commission Staff. 2. The temporary suspension of the requirement for EKPC to file a rate mechanism shall continue during the period of abeyance, as extended by this Order. 3. Nothing shall prevent the parties from filing documents or the Commission from entering further Orders during the abeyance of this case.
|
2015-00358
|
6/10/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to New Cingular Wireless PCS, LLC and American Towers, LLC
|
2015-00404
|
6/10/2016
|
PSC_ORDER
Order Entered: The proposed GCR tariff, attached hereto and incorporated herein as an
Appendix to this Order, is included in the record of this proceeding and is suspended for
five months from July 1, 2016, up to and including December 1, 2016.
2. Within 14days of the date of this Order, the Attorney General shall file any
requests for information, comments, or a statement regarding its lack of objection to the
proposed tariff, to which Sentra shall respond within 14 days of the date of the Attorney
General's filing.
3. Nothing shall prevent the Commission from issuing further Orders with
regard to Sentra's proposed GCR tariff prior to the end of the suspension period.
|
2016-00139
|
6/10/2016
|
PSC_ORDER
Order Entered: 1. North Mercer's motion for an extension of time is granted. 2. North Mercer shall file its Answer to the complaint within ten days of the date of this Order. 3. North Mercer's answer shall address the allegations set forth in the formal complaint and discuss in detail the issues raised and relief requested in the pending action in the Mercer Circuit Court.
|
2016-00154
|
6/10/2016
|
20160610_PSC_ORDER.pdf
|
2016-00172
|
6/10/2016
|
20160610_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00169
|
6/10/2016
|
20160610_PSC_ORDER.pdf
|
2016-00162
|
6/13/2016
|
PSC_ORDER
Order Entered: 1. Ordering paragraphs 1, 2, 3, 4, 5, and 6 of the December 18, 2013, Order are stricken. 2. TracFone is not a utility as defined by KRS 278.010(3)(e). 3. TracFone is not subject to the reporting requirements of KRS 278.140. 4. TracFone is not subject to the annual assessment requirements of KRS 278.150.
|
2011-00322
|
6/13/2016
|
20160613_DATA_REQUEST.pdf
Data Request
|
2016-00159
|
6/13/2016
|
20160613_DATA_REQUEST.pdf
Data Request
|
2015-00312
|
6/13/2016
|
20160613_PSC_ORDER.pdf
|
2016-00162
|
6/13/2016
|
20160613_PSC_ORDER01.pdf
|
2016-00162
|
6/14/2016
|
PSC_ORDER
Order Entered: 1. The Attorney General's Motion to Intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, that apply to this matter. 4. The Attorney General and Atmos shall have seven days from the date of this Order to file written comments or to request an evidentiary hearing. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days from the date of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served. 6. All other provisions of the Commission's prior Orders in this case not in conflict with this Order shall remain in full force and effect. 7. Nothing shall prevent the Commission from issuing further orders in this matter.
|
2016-00052
|
6/14/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Burkesville and set forth in the Appendix to this Order are approved for service rendered by Burkesville on and after June 28, 2016. 2. Within 20 days of the date of this Order, Burkesville shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00178
|
6/14/2016
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Bluegrass is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered by Bluegrass on and after July 1, 2016. 3. Within 20 days of the date of this Order, Bluegrass shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00183
|
6/14/2016
|
PSC_ORDER
Final Order Entered: . The rate proposed by Natural Energy is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered by Natural Energy on and after July 1, 2016. 3. Within 20 days of the date of this Order, Natural Energy shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2016-00185
|
6/14/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Martin and set forth in the Appendix to this Order are approved for service rendered on and after July 1, 2016. 2. Within 20 days of the date of this Order, Martin shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00188
|
6/14/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Millennium and set forth in the Appendix to this Order are approved for service rendered on and after July 1, 2016. 2. Within 20 days of the date of this Order, Millennium shall file with this Commission , using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00189
|
6/14/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Citipower are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered by Citipower on and after July 1, 2016. 3. Citipower shall submit all invoices received from Citigas and Citizens Gas as part of all future GCR filings. 4. Within 20 days of the date of this Order, Citipower shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00190
|
6/14/2016
|
20160614_PSC_ORDER.pdf
|
2016-00177
|
6/15/2016
|
PSC_ORDER
Order Entered: 1. Frontier's request for deviation from the filing requirements of 807 KAR 5:001, Section 16(4)(k), is granted. 2. Frontier's application in this matter is accepted for filing as of June 8, 2016.
|
2016-00132
|
6/16/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00358
|
6/16/2016
|
PSC_ORDER
Order Entered: Windstream's petition regarding the Pooling Administrator's denial of its
application for assignment of additional numbering resources is granted.
2. The decision of the Pooling Administrator denying Windstream's request
for an LRN and assignment of a new NXX code along with a thousands-block of
numbers in the Albany rate center of Kentucky is hereby overturned.
3. The NANPA and/or the Pooling Administrator shall assign Windstream the
NXX code and thousands-block requested in their petition for the affected rate center.
4. The numbering resources considered in this Order are to be assigned for
the sole use of serving the need for an LRN and a new thousands-block for deployment
of a packet switch and Windstream's corresponding services in connection with a
Connect America Fund Phase II project. If the numbering resources requested by
Windstream are no longer required to meet its service requirements, the associated
|
2016-00194
|
6/16/2016
|
20160616_PSC_ORDER.pdf
|
2016-00180
|
6/16/2016
|
20160616_PSC_ORDER.pdf
|
2015-00343
|
6/17/2016
|
PSC_ORDER
Order Entered: 1. The AG's motion to compel is denied. 2. Any request for an evidentiary hearing shall be filed by June 24, 2016. 3. If no request for an evidentiary hearing is filed by June 24, 2016, any written comments on all issues including the jurisdictional issue shall be filed by July 8,
2016. 4. Any responses to written comments shall be filed by July 22, 2016. 5. Nothing shall prevent the Commission from issuing further orders in this matter.
|
2016-00053
|
6/17/2016
|
PSC_ORDER
Order Entered: 1. Sentra's request for an extension time, until June 21 , 2016, to submit its responses to the AG's supplemental request for information is granted. 2. The date for parties to make a filing indicating whether they desire a public hearing in this matter is extended from June 24, 2016, to July 1, 2016.
|
2016-00139
|
6/17/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Valley Gas, Inc.
|
2016-00200
|
6/17/2016
|
PSC_ORDER
Order Entered: 1. B&H, B&S, and Bud Rife shall appear in Hearing Room No. 1 of the Commission offices in Frankfort, Kentucky, at 10:00 a.m. Eastern Daylight Time, on July 6, 2016, to show cause why they should not subject to penalties pursuant to KRS 278.990 as described in finding paragraph 2 of this Order. 2. Pursuant to KRS 278.360, the record of any formal hearing shall be kept by videotape.
|
2016-00204
|
6/17/2016
|
20160617_PSC_ORDER.pdf
|
2015-00418
|
6/17/2016
|
20160617_PSC_ORDER.pdf
|
2016-00182
|
6/17/2016
|
20160617_DATA_REQUEST.pdf
Data Request
|
2016-00152
|
6/17/2016
|
20160617_PSC_ORDER.pdf
|
2016-00180
|
6/21/2016
|
20160621_DATA_REQUEST.pdf
Commission Staff's Second Request for Information to Martin County Water District
|
2016-00142
|
6/21/2016
|
20160621_DATA_REQUEST.pdf
Data Request
|
2015-00418
|
6/22/2016
|
20160622_DATA_REQUEST.pdf
Data Request
|
2016-00059
|
6/22/2016
|
20160622_DATA_REQUEST01.pdf
Data Request
|
2016-00059
|
6/22/2016
|
20160622_DATA_REQUEST02.pdf
Data Request
|
2016-00059
|
6/22/2016
|
20160622_DATA_REQUEST03.pdf
Data Request
|
2016-00059
|
6/22/2016
|
20160622_DATA_REQUEST04.pdf
Data Request
|
2016-00059
|
6/22/2016
|
20160622_DATA_REQUEST05.pdf
Data Request
|
2016-00059
|
6/22/2016
|
20160622_DATA_REQUEST06.pdf
Data Request
|
2016-00059
|
6/22/2016
|
20160622_DATA_REQUEST07.pdf
Data Request
|
2016-00059
|
6/23/2016
|
PSC_ORDER
Order Entered: 1. LG&E shall submit to the Commission a written response to the allegations contained in the Staff Report within 20 days of the date of this Order. 2. LG&E shall appear on August 9, 2016, at 9:00 a.m., Eastern Daylight Time ("EDT"), in Hearing Room 1 of the Commission's offices at 211 Sower Blvd. in Frankfort, Kentucky, for the purpose of presenting evidence concerning the alleged violations of KRS 278.042, the most recent edition of the NESC, and the LG&E Safety Manual, and showing cause why it should not be subject to the penalties prescribed in
KRS 278.990(1) for these alleged violations. 3. The August 9, 2016 hearing shall be recorded by videotape only. 4. The Staff Report in the Appendix to this Order is made a part of the record in this case. 5. At the scheduled hearing in this matter, LG&E shall also present evidence
on the adequacy, safety, and reasonableness of its practices related to the construction, installation, and repair of electric facilities as they relate to the facts of this case, and whether such practices require revision as related to this incident. 6. Any request for an informal conference with Commission Staff to discuss the issues in this case shall be set forth in writing and filed with the Commission within 20 days of the date of this Order.
|
2016-00202
|
6/23/2016
|
20160623_PSC_ORDER.pdf
|
2016-00026
|
6/23/2016
|
20160623_PSC_ORDER.pdf
|
2016-00186
|
6/23/2016
|
20160623_PSC_ORDER.pdf
|
2015-00283
|
6/27/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Kentucky Power Company and Licking Valley Rural Electric Cooperative Corporation
|
2016-00176
|
6/29/2016
|
PSC_ORDER
Final Order Entered: 1. KU's Motion to Strike Complainants' Response to KU's Motion to Dismiss is denied. 2. KU's Motion to Dismiss the Complaint with prejudice is granted. 3. KU's Motion to Strike Complainants' Request for Information is denied as moot. 4. KU shall include in its next application for a general adjustment in rates testimony in support of the monthly billing demand provisions of Rate PS. 5. This case is closed and removed from the Commission's docket.
|
2015-00417
|
6/29/2016
|
PSC_ORDER
Order Entered: Licking Valley shall file any responsive comments in support of its application by July 8, 2016.
|
2016-00077
|
6/29/2016
|
PSC_ORDER
Final Order Entered: 1. The proposed transfer of ownership and control of Cedarbrook's facilities that serve the Cedarbrook Subdivision is approved. 2. The Commission shall petition the Franklin Circuit Court, Division II, in Civil Action No. 15-CI-00417, for an order confirming the transfer of the Cedarbrook facilities approved herein, terminating the existing receivership under which HCSD has had control of those facilities, and requiring a final accounting to the Court of the revenues and expenses of HCSD while acting as receiver. 3. Within ten days of the Franklin Circuit Court confirming the transfer of the Cedarbrook facilities from HCSD as receiver to HCSD as owner, HCSD shall notify the Commission in writing that the proposed transfer has occurred. 4. Any documents filed pursuant to ordering paragraph 3 shall reference this case number and shall be retained in Cedarbrook's general correspondence file. 5. The Commission's Executive Director shall forward a copy of this Order to
HCWA.
|
2016-00164
|
6/29/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.05 per 1,000 gallons is approved. 2. North Shelby's proposed rates, as set forth in Appendix B to this Order, are approved for services rendered on and after July 1, 2016. 3. Within 20 days of the date of this Order, North Shelby shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00192
|
6/29/2016
|
20160629_PSC_ORDER.pdf
|
2015-00418
|
6/30/2016
|
PSC_ORDER
Order Entered: 1. B&H shall continue to collect the Gas Cost Adjustment ("GCA") component of its rates subject to refund. 2. B&H shall establish an interest-bearing escrow account in which to deposit all GCA revenues above $4.84 per Mcf collected after the date of this Order. 3. GCA revenues collected pursuant to ordering paragraph 2 above shall remain in the interest-bearing account until further Order of the Commission.
4. A request for an evidentiary hearing or statement that a party does not desire a hearing shall be filed by July 8, 2016. 5. If no request for an evidentiary hearing is filed by July 8, 2016, any written comments shall be filed by July 20, 2016. 6. Nothing shall prevent the Commission from issuing further Orders in this matter.
|
2015-00367
|
6/30/2016
|
PSC_ORDER
Final Order Entered: The proposed DSM-11 tariff is denied without prejudice for East Kentucky to submit a new outdoor lighting program tariff should it choose to do so.
|
2016-00056
|
6/30/2016
|
PSC_ORDER
Order Entered: Columbia's existing EECR Rider and EECR Program shall remain in effect pending the Commission's Final Order in this proceeding.
|
2016-00107
|
6/30/2016
|
20160630_PSC_ORDER.pdf
Order Entered: The 2016 Wholesale Amendment and the 2016 Retail Agreement are
approved as filed.
2. By March 31 of each year, Big Rivers shall file an annual report with the
Commission detailing, for the prior calendar year, revenues received from Aleri
|
2016-00117
|
6/30/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Western Lewis are denied. 2. Western Lewis's request to use 24-month sales volumes in the calculation of its current quarter AA is approved. 3. The rates set forth in the Appendix to this Order are approved for service rendered by Western Lewis on and after July 1, 2016. 4. Within 20 days of the date of this Order, Western Lewis shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order. 5. Western Lewis shall file the information required in finding paragraph 8 concurrent with the filing of its next application for GCR rates.
|
2016-00191
|
6/30/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.05 per 1,000 gallons is
approved.
2. West Shelby's proposed rates, as set forth in Appendix B to this Order,
are approved for water service rendered by West Shelby on and after July 1, 2016.
3. Within 20 days of the date of this Order, West Shelby shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00195
|
6/30/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.27 per 1,000 gallons is
approved.
2. Dexter-Almo's proposed rates, as set forth in Appendix B to this Order, are
approved for services rendered on and after July 1, 2016.
3. Within 20 days of the date of this Order, Dexter-Almo shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00196
|
6/30/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.05 per 1,000 gallons is
approved.
2. North Nelson's proposed rates, as set forth in Appendix B to this Order,
are approved for water service rendered by North Nelson on and after July 1, 2016.
3. Within 20 days of the date of this Order, North Nelson shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00197
|
6/30/2016
|
PSC_ORDER
Order Entered: Valley Gas's request for an extension of time, until July 20, 2016, to submit its responses to Staff's First Request is granted.
|
2016-00200
|
6/30/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.26 per 1,000 gallons is approved. 2. Bronston's proposed rates, as set forth in Appendix B to this Order, are approved for services rendered on and after June 13, 2016. 3. Within 20 days of the date of this Order, Bronston shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00201
|
7/6/2016
|
PSC_ORDER
Order Entered: Atmos Is granted a CPCN that authorizes it to bid on a franchise offered
by the city of Earlington, Kentucky, for the transmission and distribution of natural gas.
2. If Atmos is not the successful bidder, Atmos shall, within ten days of the
award of the franchise at issue, file with the Commission a written notice stating that
Atmos was not the successful bidder.
3. If Atmos is the successful bidder, Atmos shall, within ten days of the
award of the franchise at issue, file with the Commission a copy of the executed
franchise agreement and a statement disclosing the amount of the initial franchise fee.
4. If Atmos is the successful bidder, Atmos shall, within ten days of an
increase or decrease in the amount of the initial franchise fee set forth in the franchise
agreement, file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00206
|
7/7/2016
|
PSC_ORDER
Order Entered: With the PJM Billing Code adjustment addressed in ordering paragraph 2
below, the charges and credits billed by East Kentucky through its FAC for the period
May 1, 2015, through October 31, 2015, are approved.
2. With its first FAC filing made subsequent to the date of this Order, East
Kentucky shall be authorized to collect a total of $153,855.55 through its FAC.
3. Beginning with the first FAC backup file submitted subsequent to the date
of this Order, East Kentucky shall use the MSHA coal district numbers when identifying
the source of its coal purchases.
|
2016-00002
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits billed by Big Rivers
through its FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00006
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits applied by Big
Sandy through the FAG for the period May 1, 2015, through October 31, 2015, are
approved.
|
2016-00007
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits applied by Blue
Grass through the FAG for the period May 1, 2015, through October 31, 2015, are
approved.
|
2016-00008
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits applied by Clark
through the FAG for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00009
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits applied by
Cumberland Valley through the FAG for the period May 1, 2015, through October 31,
2015, are approved.
|
2016-00010
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits applied by Farmers
through the FAG for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00011
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits applied by Fleming-
Mason through the FAG for the period May 1, 2015, through October 31, 2015, are
approved.
|
2016-00012
|
7/7/2016
|
PSC_ORDER
Order Entered: that the charges and credits applied by Grayson
through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00013
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Inter-County through the FAC for the period May 1, 2015, through October 31, 2015, are
approved.
|
2016-00014
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Jackson Energy through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00015
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Licking Valley through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00016
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Nolin through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00017
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Owen through the FAG for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00018
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Salt River through the FAC for the period May 1, 2015 through October 31, 2015 are approved.
|
2016-00019
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Shelby through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00020
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by South Kentucky through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00021
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Taylor County through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00022
|
7/7/2016
|
PSC_ORDER
Final Order Entered: charges and credits applied by Jackson Purchase through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00023
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Kenergy through the FAC for the period May 1, 2015, through October 31, 2015, are approved.
|
2016-00024
|
7/7/2016
|
PSC_ORDER
Final Order Entered: The charges and credits applied by Meade County through the FAC for the period May 1, 2015, through October 31, 2015, are approved .
|
2016-00025
|
7/7/2016
|
STAFF_REPORT
Notice of Filing of Commission Staff Report
|
2016-00131
|
7/7/2016
|
20160707_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00109
|
7/7/2016
|
20160707_PSC_ORDER.pdf
|
2016-00001
|
7/7/2016
|
20160707_PSC_ORDER.pdf
|
2016-00003
|
7/7/2016
|
20160707_PSC_ORDER.pdf
|
2016-00004
|
7/7/2016
|
20160707_PSC_ORDER.pdf
|
2016-00005
|
7/8/2016
|
PSC_ORDER
Order Entered: The Applicants are granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 265 feet in height, with attached antenna, and is to be located at
395 Miller Ridge Road, Pine Ridge, Wolfe County, Kentucky. The coordinates for the
proposed facility are North Latitude 37° 46' 24.18" by West Longitude 83° 38' 8.92".
2. The Applicants' motion in limine to prevent responsive information to
Staffs First Request from being included in the record of the case is denied.
3. The Applicants' motion to quash is denied as moot.
4. The Applicants shall immediately notify the Commission in writing if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
5. Documents filed, if any, in the future pursuant to ordering paragraph 4
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2015-00404
|
7/8/2016
|
PSC_ORDER
Order Entered: The proposed transfer of the aforementioned stock in Martin Gas from
William and Lois Weinberg to Jed and Zachary Weinberg is approved.
2. Commission authorization of the proposed transfer of stock of Martin Gas
is effective for one year from the date of this Order and shall lapse if the acquisition is
not completed within this period.
3. William and Lois Weinberg shall notify the Commission within ten days of
the consummation of the stock transfer or, in the alterative, shall notify the
Commission if the proposed transaction does not occur.
4. Martin Gas shall file within ten days of the transfer of its stock a list of its
stockholders, the number of shares held by each, and a list of the corporate officers.
5. Any documents filed pursuant to ordering paragraphs 3 and 4 of this Order
shall reference the number of this case and shall be retained in the utility's general
correspondence file.
|
2016-00120
|
7/8/2016
|
PSC_ORDER
Order Entered: 1. Frontier's proposed rates are suspended for five months, up to and including December 7, 2016. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties of record and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or
person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it
obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2016-00132
|
7/8/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.10 per 1,000 gallons is
approved.
2. Judy Water's proposed rates, as set forth in Appendix B to this Order, are
approved for services rendered on and after July 1, 2016.
3. Within 20 days of the date of this Order, Judy Water shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00205
|
7/8/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.14 per 1,000 gallons is
approved.
2. Reid Village's proposed rates, as set forth in Appendix Bto this Order, are
approved for services rendered on and after July 1, 2016.
3. Within 20 days of the date of this Order, Reid Village shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00208
|
7/8/2016
|
PSC_ORDER
Order Entered: Windstream's petition regarding the Pooling Administrator's denial of its
application for assignment of additional numbering resources is granted.
2. The decision of the Pooling Administrator denying Windstream's request
for an LRN and assignment of a new NXX code along with a thousand-block of
numbers in the Bardwell rate center is hereby overturned.
3. The NANAPA and/or the Pooling Administrator shall assign Windstream
the NXX code and thousands-block requested in their petition for the affected rate
center.
4. The numbering resources considered in this Order are to be assigned for
the sole use of serving the need for an LRN and a new thousands-block for deployment
of a packet switch and Windstream's corresponding services in connection with a
Connect America Fund Phase II project. If the numbering resources requested by
Windstream are no longer required to meet its service requirements, the associated
numbering resources approved in this Order shall be returned to the NANPA and/or the
Pooling Administrator.
|
2016-00209
|
7/8/2016
|
20160708_DATA_REQUEST.pdf
Data Request
|
2016-00162
|
7/11/2016
|
STAFF_REPORT
NOTICE OF FILING OF COMMISSION STAFF REPORT
|
2016-00068
|
7/11/2016
|
PSC_ORDER
Order Entered: Airview's Notice is rejected for filing.
2. Airview shall, within seven days of the date of this Order, supplement its
June 16, 2016 Notice to demonstrate that it has complied with KRS 278.020(11).
3. Airview shall, within seven days of the date of this Order, file with the
Commission any written notices that it has provided pursuant to KRS 278.020(11).
|
2016-00207
|
7/11/2016
|
20160711_PSC_ORDER.pdf
|
2016-00169
|
7/12/2016
|
PSC_ORDER
Order Entered: Within 14 days of the date of this Order, Ms. Stadtlander shall file an
amended complaint that establishes a prima facie case pursuant to 807 KAR 5:001,
Section 20(1)(c), or this matter shall be dismissed and removed from the docket.
2. Ms. Stadtlander's request to separate this matter into two cases is denied.
|
2016-00187
|
7/12/2016
|
PSC_ORDER
Order Entered: The motion of the Attorney General to intervene is granted.
2. The Attorney General shall be entitled to the full rights of a party and shall
be served with the Commission's Orders and with filed testimony, exhibits, pleadings,
correspondence, and all other documents submitted by parties after the date of this
Order.
3. The Attorney General shall comply with all provisions of the Commission's
regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents.
4. Within seven days of entry of this Order, the Attorney General shall
provide his electronic mail address to which all electronic documents issued by the
Commission and other parties of record may be served upon the Attorney General in
accordance with 807 KAR 5:001, Section 4(8)(b).
|
2016-00207
|
7/12/2016
|
20160712_PSC_ORDER.pdf
|
2016-00162
|
7/13/2016
|
20160713_PSC_ORDER.pdf
Order Entered: that Martin District's Motion for Extension is
granted. Martin Districts response to Staff's Second Request shall filed on or before
August 7, 2016.
|
2016-00142
|
7/14/2016
|
PSC_ORDER
Order Entered: The water rates requested by Wood Creek in the Application are denied.
2. The monthly water and sewer service rates requested by Wood Creek in
its April 29, 2016 response to Staffs report are approved.
3. Wood Creek shall charge the water rates that are set forth in Appendix A
for water service rendered on and after the date of this Order.
4. Wood Creek shall charge the sewer rates that are set forth in Appendix B
for sewer service rendered on and after the date of this Order.
5. Wood Creek shall use the "PSC Approved Service Life" set forth in
Appendix C to depreciate water and sewer assets for ratemaking and accounting
|
2015-00428
|
7/14/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.12 per 1,000 gallons is
approved.
2. Montgomery County's proposed rates are denied.
3. The rates set forth in Appendix B to this Order are approved for water
service rendered by Montgomery County on and after July 1, 2016.
4. Within 20 days of the date of this Order, Montgomery County shall file
with the Commission, using the Commission's electronic Tariff Filing System, revised
tariff sheets showing the rates approved herein.
|
2016-00211
|
7/14/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.12 per 1,000 gallons is
approved.
2. Breathitt County's proposed rates, as set forth in Appendix B to this Order,
are approved for water service rendered by Breathitt County on and after July 1, 2016.
3. Within 20 days of the date of this Order, Breathitt County shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00221
|
7/14/2016
|
20160714_PSC_ORDER.pdf
|
2016-00214
|
7/14/2016
|
20160714_PSC_ORDER.pdf
|
2016-00215
|
7/14/2016
|
20160714_DATA_REQUEST.pdf
Data Request
|
2015-00227
|
7/15/2016
|
PSC_ORDER
Order Entered: Duke Kentucky's motion for confidential protection for the Attachment to
the ARO Update is granted.
2. The materials set forth in the Attachment to the ARO Update shall not be
placed in the public record or made available for public inspection for a period of ten
years, or until further Orders of this Commission.
3. Use of the materials in question in any Commission proceeding shall be in
compliance with 807 KAR 5:001, Section 13(9).
4. Duke Kentucky shall inform the Commission if the materials in question
become publicly available or no longer qualify for confidential treatment.
|
2015-00187
|
7/15/2016
|
PSC_ORDER
Order Entered: that Airview's Notice is accepted for filing as of
July 11, 2016.
|
2016-00207
|
7/15/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.23 per 1,000 gallons is
approved.
2. South 641's proposed rates, as set forth in Appendix B to this Order, are
approved for water service rendered by South 641 on and after July 1, 2016.
3. Within 20 days of the date of this Order, South 641 shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00223
|
7/15/2016
|
20160715_PSC_ORDER.pdf
|
2016-00169
|
7/18/2016
|
PSC_ORDER
Order Entered: 1.EKPC's petition for confidential protection for its Response is hereby granted. 2. he materials granted confidential protection will not be placed in the public record or made available for public inspection for a period of ten years from the date of this Order, or upon further Orders of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the materials granted confidential protection become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow EKPC to seek a remedy afforded by law.
|
2015-00233
|
7/18/2016
|
PSC_ORDER
Order Entered: 1. EKPC's petition for confidential protection for its Responses an Supplemental Response is hereby granted. 2. The materials granted confidential protection will not be placed in the public record or made available for public inspection for a period of ten years from the date of this Order, or upon further Orders of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the materials granted confidential protection become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow EKPC to seek a remedy afforded by law.
|
2015-00358
|
7/18/2016
|
20160718_PSC_ORDER.pdf
|
2016-00003
|
7/18/2016
|
20160718_PSC_ORDER.pdf
|
2016-00059
|
7/19/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Kentucky Frontier Gas, LLC
|
2016-00132
|
7/20/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Atmos and set forth in the Appendix to this Order are approved for final meter readings on and after August 1, 2016. 2. Within 20 days of the date of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00224
|
7/21/2016
|
PSC_ORDER
Order Entered: no later than five days from the date of this
Order, Columbia shall file a statement as to whether there are any material issues of
fact that warrant a hearing, or whether this case may be submitted for adjudication
based on the existing record without a hearing.
|
2015-00084
|
7/21/2016
|
PSC_ORDER
Order Entered: The AMRP rates in the Appendix to this Order are approved for service
rendered by Columbia on and after the date of this Order.
2. Within 20 days of the date of this Order, Columbia shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00140
|
7/21/2016
|
PSC_ORDER
Order Entered: 1. The hearing scheduled for August 9, 2016, is cancelled and shall be rescheduled at a later date if needed. 2. An IC shall be held on August 9, 2016, at 10:00 a.m. Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 3. All other provisions of the Commission's June 23, 2016 Order not in conflict with the provisions of this Order shall remain in full force and effect.
|
2016-00202
|
7/21/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Delta and set forth in the Appendix to this Order are approved for final meter readings on and after July 27, 2016. 2. Within 20 days of the date of this Order, Delta shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00213
|
7/21/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Navitas KY are denied. 2. The rates set forth in the Appendix to this Order are approved for service rendered by Navitas on and after August 1, 2016. 3. Within 20 days of the date of this Order, Navitas KY shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00218
|
7/21/2016
|
PSC_ORDER
Order Entered: The rate proposed by LG&E and set forth in the Appendix to this Order is
approved for gas supplied by LG&E on and after August 1, 2016.
2. Within 20 days of the date of this Order, LG&E shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00225
|
7/21/2016
|
PSC_ORDER
Final Order Entered: 1. The rate as proposed by Public and set forth in the Appendix to this Order is approved for service rendered on and August 1, 2016. 2. Within 20 days of the date of this Order, Public shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00226
|
7/21/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Frontier are denied. 2. The rates set forth in the Appendix to this Order are approved for final
meter readings by Frontier on and after August 1, 2016. 3. Within 20 days of the date of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. Frontier shall provide detailed discussions of its efforts to decrease the incidence of gas loss on its system, as well as any updates to projections for when such losses are expected to decrease to 5 percent or below, with every future application in
which gas cost recovery is proposed with no 5 percent L&U limit.
|
2016-00227
|
7/21/2016
|
PSC_ORDER
Order Entered: KU is granted a CPCN that authorizes it to bid on a franchise offered by
the city of Nebo, Kentucky, for electric transmission and distribution service.
2. If KU is not the successful bidder, KU shall, within ten days of the award of
the franchise at issue, file with the Commission a written notice stating that KU was not
the successful bidder.
3. If KU is the successful bidder, KU shall, within ten days of the award of the
franchise at issue, file with the Commission a copy of the executed franchise agreement
and a statement disclosing the amount of the initial franchise fee.
4. If KU is the successful bidder, KU shall, within ten days of an increase or
decrease in the amount of the initial franchise fee set forth in the franchise agreement,
file with the Commission documentation setting forth the revised fee.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00263
|
7/21/2016
|
20160721_PSC_ORDER.pdf
|
2016-00162
|
7/21/2016
|
20160721_PSC_ORDER01.pdf
|
2016-00162
|
7/21/2016
|
20160721_PSC_ORDER02.pdf
|
2016-00162
|
7/21/2016
|
20160721_PSC_ORDER03.pdf
|
2016-00162
|
7/21/2016
|
20160721_PSC_ORDER.pdf
|
2016-00210
|
7/21/2016
|
20160721_PSC_ORDER04.pdf
|
2016-00162
|
7/21/2016
|
20160721_PSC_ORDER.pdf
|
2016-00217
|
7/21/2016
|
20160721_PSC_ORDER.pdf
|
2016-00174
|
7/21/2016
|
20160721_PSC_ORDER.pdf
|
2016-00268
|
7/21/2016
|
20160721_PSC_ORDER.pdf
|
2016-00054
|
7/21/2016
|
20160721_PSC_ORDER.pdf
|
2016-00115
|
7/22/2016
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed and indexed, and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and 10 copies to the Commission. b. Each response shall be answered under oath, or for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the
response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
e. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001 , Section 4(10), encrypt or redact the paper so that the personal information cannot be read.
|
2016-00220
|
7/22/2016
|
PSC_ORDER
Order Entered: 1. Duke Kentucky's proposed tariff is suspended for five months, up to and including December 31, 2016. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with copies to all parties of record and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2016-00228
|
7/22/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Within seven days of entry of this Order, the Attorney General shall
provide his electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Attorney General in accordance \with 807 KAR 5:001, Section 4(8)(b). 5. Requests for information to Mountain Water District shall be filed no later than July 28, 2016. 6. Mountain Water District shall file responses to requests for information no later than August 4, 2016. 7. The Attorney General shall file comments, If any, no later than August 11, 2016. 8. The last day for the Commission to approve Mountain Water District's
application under KRS 278.023 is 30 days after the Commission accepts the application for filing.
|
2016-00266
|
7/22/2016
|
20160722_PSC_ORDER.pdf
|
2016-00159
|
7/22/2016
|
20160722_PSC_ORDER.pdf
|
2016-00222
|
7/27/2016
|
DATA_REQUEST
COMMISSION STAFF'S REQUEST FOR INFORMATION TO
BUDGET PREPAY. INC
|
2016-00184
|
7/27/2016
|
20160727_PSC_ORDER.pdf
|
2016-00162
|
7/27/2016
|
20160727_PSC_ORDER01.pdf
|
2016-00162
|
7/27/2016
|
20160727_DATA_REQUEST.pdf
Data Request
|
2016-00180
|
7/27/2016
|
20160727_DATA_REQUEST.pdf
Data Request
|
2016-00169
|
7/28/2016
|
PSC_ORDER
Order Entered: 1. EKPC's motion for confidential protection of its Response is granted. 2. The materials for which EKPC seeks confidential treatment shall not be placed in the public record or made available for public inspection for a period of ten years from the date of this Order, or until further Order of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, then EKPC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow EKPC to seek a remedy afforded by law.
|
2016-00116
|
7/28/2016
|
PSC_ORDER
Order Entered: 1. The Commission's Order entered July 14, 2016, is amended to the limited extent that Appendix A and Appendix B attached thereto are dated July 14, 2016, to reflect their entry on that date. 2. Copies of Appendix A and Appendix B as amended to include their entry
date of July 14, 2016, are appended to this Order. 3. All other provisions of the Order entered on July 14, 2016, remain in full force and effect.
|
2016-00221
|
7/28/2016
|
20160728_DATA_REQUEST.pdf
Data Request
|
2016-00168
|
7/29/2016
|
PSC_ORDER
Final Order Entered: The contract between Kentucky Power and Licking Valley authorizing Kentucky Power to serve the Clemonses' residence and garage at 263 Meeting House Road, West Liberty, Morgan County, Kentucky, is approved.
|
2016-00176
|
7/29/2016
|
PSC_ORDER
Order Entered: The presentations at the training program held on May 10, 2016, In
Prestonsburg, Kentucky, are accredited and approved for a maximum of seven credit
hours of water district management training.
2. The EPA shall retain a record of all water district commissioners attending
the accredited and approved program.
|
2016-00199
|
7/29/2016
|
PSC_ORDER
Order Entered: The presentations at the KRWA regional meetings held on July 12, 14,
and 21, 2016, in Morehead, Owensboro, and Draffenville, Kentucky, respectively, are
accredited and approved for a maximum of four credit hours of water district
management training.
2. KRWA shall retain a record of all water district commissioners attending
the accredited and approved presentations.
3. No later than August 15, 2016, KRWA shall file with the Commission:
a. A sworn statement attesting that the accredited instruction was
performed;
b. A description of any changes in the presenters or the proposed
curriculum that occurred after the KWRA's application;
c. The name of each attending water district commissioner, his or her
water district, the location of the meeting attended, and the number of hours that he or
she attended;
d. A copy of any written material given to water commissioners
attending the presentations; and
e. Documents indicating whether the Kentucky Board of Certification
of Water Treatment & Distribution System Operators and the Kentucky Board of
Certification of Wastewater System Operators approved the training for continuing
education credit.
|
2016-00203
|
7/29/2016
|
PSC_ORDER
Order Entered: 1 . This case is initiated to investigate the request by Airview to abandon its utility services and facilities. 2. Airview shall continue to operate its utility facilities during the pendency of this investigation and shall continue operating until the. Commission issues an Order
adjudicating Airview's request to abandon its facilities. 3. The information requested in the Appendix of this Order is due within 14 days of the date of this Order. Pursuant to 807 KAR 5:001, Airview is to file with the Commission the original and 8 copies of the following information, with a copy to all parties of record. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and eight copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or the
person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry.
|
2016-00207
|
7/29/2016
|
PSC_ORDER
Order Entered: The presentations at the Annual Conference and Exhibition 'Tools for
Success" training event to be held on August 22, 2016, through August 24, 2016, in
Louisville, Kentucky, is accredited and approved for a maximum of 12 credit hours of
water district management training.
2. KRWA shall retain a record of all water district commissioners attending
the accredited and approved presentations.
3. No later than 30 days after the presentations, KRWA shaii file with the
Commission:
a. A sworn statement attesting that the accredited instruction was
performed;
b. A description of any changes in the presenters or the proposed
curriculum that occurred after the KWRA's application;
c. The name of each attending water district commissioner, his or her
water district, and the number of hours that he or she attended;
|
2016-00212
|
7/29/2016
|
PSC_ORDER
Order Entered: that the presentations at the training sessions
held by KRWA at the McCreary County Water District in Whitley City, Kentucky, on
June 2-3, 2016, are accredited and approved for a maximum of 12 credit hours of water
district management training.
|
2016-00219
|
7/29/2016
|
PSC_ORDER
Final Order Entered: 1. Brandenburg Telecom's petition regarding the Pooling Administrator's denial of its application for assignment of additional numbering resources is granted. 2. The decision of the Pooling Administrator denying Brandenburg Telecom's request for the assignment of a new central office code in the 270 NPA consisting of ten blocks of 1,000 numbers for 10,000 consecutive numbers for the Elizabethtown rate center in Kentucky is hereby overturned. 3. The NANPA and/or Pooling Administrator shall assign Brandenburg
Telecom a new central office code in the 270 NPA consisting of ten blocks of 1,000 numbers for 1 0,000 consecutive numbers for the Elizabethtown rate center. 4. The numbering resources considered in this Order are to be assigned for the sole use of Brandenburg Telecom's customer, Hardin Memorial Hospital. If the numbering resources requested by Brandenburg Telecom are no longer required to meet the service, the associated numbering resources approved in this Order shall be returned to the NANPA and/or Pooling Administrator.
|
2016-00258
|
7/29/2016
|
PSC_ORDER
Order Entered: 1. LG&E shall submit to the Commission a written response to the allegations contained in the Staff Report within 20 days of the date of this Order. 2. LG&E shall appear on October 11, 2016, at 9:00 a.m. Eastern Daylight Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, for the purpose of presenting evidence concerning the alleged violations of KRS 278.042, the most recent edition of NESC, and the LG&E Safety Manual, and showing cause why it should not be subject to the penalties prescribed in KRS 278.990(1) for these alleged violations. 3. The October 11, 2016 hearing shall be recorded by videotape only. 4. The Staff Report in the Appendix to this Order is made a part of the record in this case. 5. At the scheduled hearing in this matter, LG&E shall also present evidence on the adequacy, safety, and reasonableness of its practices related to the construction, installation, and repair of electric facilities as they relate to the facts of this case and whether such practices require revision as related to this incident. 6. Any request for an informal conference with Commission Staff to discuss the issues in this case shall be set forth in writing and filed with the Commission within 20 days of the date of this Order.
|
2016-00264
|
7/29/2016
|
PSC_ORDER
Final Order Entered: 1. Blue Grass Energy is granted a CPCN that authorizes it to bid on a franchise offered by the city of Nicholasville, Kentucky, for electric transmission and distribution service. 2. If Blue Grass Energy is not the successful bidder, Blue Grass Energy shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If Blue Grass Energy is the successful bidder, Blue Grass Energy shall, within ten days of the award of the franchise at issue, file with the Commission a copy of
the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Blue Grass Energy is the successful bidder, Blue Grass Energy shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00273
|
7/29/2016
|
20160729_DATA_REQUEST.pdf
Data Request
|
2016-00152
|
7/29/2016
|
20160729_PSC_ORDER.pdf
|
2016-00274
|
8/1/2016
|
PSC_ORDER
Order Entered: 1. This proceeding is established to investigate the reasonableness of the proposed revisions. 2. McKinney's proposed revisions are suspended for five months from September 1, 2016, up to and including January 31, 2017.
|
2016-00277
|
8/2/2016
|
20160802_PSC_ORDER.pdf
|
2016-00281
|
8/2/2016
|
20160802_DATA_REQUEST.pdf
Data Request
|
2016-00222
|
8/3/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Duke Energy Kentucky, Inc.
|
2016-00228
|
8/3/2016
|
PSC_ORDER
Order Entered: Beech Grove shall amend its Application through submitting the pleadings
and information necessary to request a CPCN for purchasing and installing its proposed
automated metering system.
2. Beech Grove's request for authorization to enter into a loan arrangement
with GCC will be held in abeyance pending acceptance for filing of the amendment
described in ordering paragraph 1.
|
2016-00255
|
8/3/2016
|
PSC_ORDER
Order Entered: B&H's application as tendered on July 14, 2016, is rejected for filing until it
has cured its deficiencies pursuant to 807 KAR 5:076, Sections 4(1 )(a), 4(1 )(f), 5(4)(b),
5(4)(c), 5(4)(d), 5(4)(g), and 5(4)(j).
2. B&H is granted a deviation from the filing requirements set forth in 807
KAR 5:076, Sections 4(1 )(b) and 4(1 )(c).
|
2016-00257
|
8/3/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Within seven days of entry of this Order, the Attorney General shall
provide his electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Attorney General in accordance with 807 KAR 5:001, Section 4(8)(b).
|
2016-00265
|
8/3/2016
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Nicholasville, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00280
|
8/3/2016
|
20160803_PSC_ORDER.pdf
|
2016-00198
|
8/4/2016
|
PSC_ORDER
Order Entered: 1. No later than October 18, 2016, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings and recommendations regarding Sandy Hook's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission: a. Its written comments on and any objections to the findings and recommendations contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Sandy Hook's financial condition supports a higher rate than Sandy Hook proposes or the assessment of an additional rate or charge not proposed in Sandy Hook's application, Sandy Hook in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the recommended additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which Sandy Hook accounts for the depreciation of Sandy Hook's assets, Sandy Hook in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require Sandy Hook to implement the proposed change for accounting purposes.
|
2016-00265
|
8/4/2016
|
PSC_ORDER
Order Entered: 1. EKPC's request for a deviation from 807 KAR 5:001, Section 15(2)(d)(2), is granted. 2. EKPC shall provide the plans, specifications, and drawings of the proposed 8.5-MW community solar facility within ten days of obtaining the documents from Lendlease.
3. EKPC's application is considered filed as of the date of this Order.
|
2016-00269
|
8/4/2016
|
20160804_PSC_ORDER.pdf
|
2015-00343
|
8/5/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.03 per 1,000 gallons is approved. 2. Estill County's proposed rates, as set forth in Appendix B to this Order, are approved for water service rendered by Estill County on and after July 19, 2016. 3. Within 20 days of the date of this Order, Estill County shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00256
|
8/5/2016
|
20160805_DATA_REQUEST.pdf
Data Request
|
2016-00162
|
8/8/2016
|
PSC_ORDER
Final Order Entered: 1. The 2016 Water Personnel Training Seminar, which the Commission conducted at Kentucky Dam Village State Resort Park in Gilbertsville, Kentucky, on June 21 -22, 2016, is approved for a maximum of 12 credit hours of water district management training and for a maximum of 12 credit hours of new water district commissioner training. 2. Within 20 days of the date of this Order, Commission Staff shall file into
the post case referenced correspondence file for this case a list of the names of each attendee, his or her water district, and the number of hours that he or she attended at this training program.
|
2016-00282
|
8/8/2016
|
20160808_PSC_ORDER.pdf
|
2016-00026
|
8/8/2016
|
20160808_PSC_ORDER.pdf
|
2016-00027
|
8/9/2016
|
PSC_ORDER
Order Entered: The July 29, 2016 Order is amended by deleting the text in ordering
paragraph 2 and substituting in its place the following:
If Blue Grass Energy is not the successful bidder, Blue
Grass Energy shall, within ten days of the award of the
franchise at issue, file with the Commission a written notice
stating that Blue Grass Energy was not the successful
bidder.
2. All other provisions of the July 29, 2016 Order shall remain in full force
and effect.
|
2016-00273
|
8/9/2016
|
PSC_ORDER
Order Entered: 1. Kentucky Power shall submit to the Commission a written response to the allegations contained in the Staff Report within 20 days of the date of this Order. 2. Kentucky Power shall appear on October 18, 2016, at 9:00 a.m. EDT, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, for the purpose of presenting evidence concerning the alleged violations of KRS 278.042, the most recent edition of NESC, and the Kentucky Power Inspection Plan, and showing cause why it should not be subject to the penalties prescribed in KRS 278.990(1), for these alleged violations. 3. The October 18, 2016 hearing shall be recorded by videotape only. 4. The Staff Report attached hereto as an Appendix to this Order is made a part of the record in this case. 5. At the scheduled hearing in this matter, Kentucky Power shall also present evidence on the adequacy, safety, and reasonableness of its practices related to the construction, installation, and repair of electric facilities as they relate to the facts of this case and whether such practices require revision as related to this incident. 6. Any request for an informal conference with Commission Staff to discuss the issues in this case shall be set forth in writing and filed with the Commission within 20 days of the date of this Order.
|
2016-00279
|
8/9/2016
|
20160809_PSC_ORDER.pdf
|
2016-00289
|
8/9/2016
|
20160809_PSC_ORDER.pdf
|
2015-00283
|
8/9/2016
|
20160809_PSC_ORDER.pdf
|
2016-00292
|
8/11/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2016-00131
|
8/11/2016
|
STAFF_REPORT
NOTICE OF FILING OF COMMISSION STAFF REPORT
|
2016-00163
|
8/11/2016
|
PSC_ORDER
Order Entered: Airview’s motion for extension of time is granted.
2. Airview's responses to the information requested in the Appendix of the
Commission's July 29, 2016 Order shall be filed on or before August 22, 2016.
|
2016-00207
|
8/11/2016
|
20160811_PSC_ORDER.pdf
|
2016-00143
|
8/12/2016
|
PSC_ORDER
Order Entered: 1. East Kentucky Power Cooperative, Inc. ("East Kentucky") shall appear in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, on November 9, 2016, at 9:00 a.m., Eastern Standard Time, to submit itself to examination on the application of its Fuel Adjustment Clause ("FAC") from November 1, 2015, through April 30, 2016. Neither opening statements nor summaries of pre-filed testimony will be permitted. 2. Not less than seven days and no more than 21 days prior to the scheduled hearing, East Kentucky shall publish in a newspaper of general circulation in each area in which it serves notice of the purpose, time, place, and date of the scheduled hearing. In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." 3. East Kentucky shall file with the Commission no later than November 7, 2016, proof of publication of its notice for the hearing. 4. The official record of the proceeding shall be by video only.
|
2016-00231
|
8/12/2016
|
PSC_ORDER
Order Entered: 1. Big Rivers Electric Corporation ("Big Rivers") shall appear in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, on November 9, 2016, at 9:00a.m. , Eastern Standard Time, to submit itself to examination on the application of its Fuel Adjustment Clause ("FAC") from November 1, 2015, through April 30, 2016. Neither opening statements nor summaries of pre-filed
testimony will be permitted. 2. Not less than seven days and no more than 21 days prior to the scheduled hearing, Big Rivers shall publish in a newspaper of general circulation in each area in which it serves notice of the purpose, time, place, and date of the scheduled hearing. In
addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." 3. Big Rivers shall file with the Commission no later than November 7, 2016, proof of publication of its notice for the hearing. 4. The official record of the proceeding shall be by video only.
|
2016-00235
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00236
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00237
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00238
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00239
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00240
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00241
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00242
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00243
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00244
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00245
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00246
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00247
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00248
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00249
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00250
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00251
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00252
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00253
|
8/12/2016
|
PSC_ORDER
A public hearing shall be held on November 9, 2016, at 9:00 a.m. Eastern
Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky, to examine the application of the Fuel Adjustment Clause from November 1, 2015, through April
30, 2016. If no interested party files written notice of its intent to attend this hearing with
the Commission by November 7, 2016, this public hearing shall be cancelled and the
matter shall be considered submitted for decision based on the evidence in the record.
shall file with the Commission, no later than 21 days from the
date of this Order, an affidavit attesting to its compliance or noncompliance with the
requirements of 807 KAR 5:056.
3. All documents filed with the Commission pursuant to 807
KAR 5:056, Sections 1(7) and 1(9), during the period under review are incorporated by
reference into the record of this proceeding.
4. shall publish the following notice no less than seven days or
more than 21 days prior to the public hearing in a newspaper of general circulation in its
|
2016-00254
|
8/12/2016
|
20160812_PSC_ORDER.pdf
|
2016-00230
|
8/12/2016
|
20160812_PSC_ORDER.pdf
|
2016-00232
|
8/12/2016
|
20160812_PSC_ORDER.pdf
|
2016-00233
|
8/12/2016
|
20160812_PSC_ORDER.pdf
|
2016-00234
|
8/12/2016
|
20160812_PSC_ORDER.pdf
|
2016-00274
|
8/15/2016
|
PSC_ORDER
Order Entered: Fountain Run Is granted a CPCN for the proposed construction as set
forth In Its application.
2. Fountain Run's proposed plan of financing is approved.
3. Fountain Run is authorized to issue $133,000 of its water system revenue
bonds maturing over 40 years at an interest rate not exceeding 2.125 percent per
annum.
4. The proceeds from the proposed bond issuance shall be used only for the
purposes specified in Fountain Run's application.
5. Fountain Run shall obtain approval from the Commission prior to
performing any additional construction not expressly authorized by this Order.
6. Notwithstanding ordering paragraphs 4 and 5, if surplus funds remain after
the approved construction has been completed, Fountain Run may use such surplus to
construct additional plant facilities if RD approves of the use and the additional
construction will not result in a change in Fountain Run's rates for service. Fountain
Run shall provide written notice of this additional construction in accordance with 807
KAR 5:069, Section 4.
7. Fountain Run shall file with the Commission documentation of the total
costs of this project, including the cost of construction and all other capitalized costs
(e.g., engineering, legal, and administrative), within 60 days of the date that construction
is substantially completed. Construction cost shall be classified into appropriate plant
accounts in accordance with the Uniform System of Accounts for water utilities
prescribed
|
2016-00229
|
8/15/2016
|
PSC_ORDER
Order Entered: Mountain Water is granted a CPCN for the proposed construction as set
forth in its application.
2. Mountain Water's proposed plan of financing is approved.
3. Mountain Water shall obtain approval from the Commission prior to
performing any additional construction not expressly authorized by this Order.
4. Notwithstanding ordering paragraph 3, if surplus funds remain after the
approved construction has been completed, Mountain Water may use such surplus to
construct additional plant facilities if RD approves of the use and the additional
construction will not result in a change in Mountain Water's rates for service. Mountain
Water shall provide written notice of this additional construction in accordance with 807
KAR 5:069, Section 4.
5. Mountain Water shall file with the Commission documentation of the total
costs of this project, including the cost of construction and all other capitalized costs
(e.g., engineering, legal, and administrative), within 60 days of the date that construction
is substantially completed. Construction cost shall be classified into appropriate plant
accounts in accordance with the Uniform System of Accounts for water utilities
prescribed by the Commission.
|
2016-00266
|
8/15/2016
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix, which is attached hereto and incorporated herein, shall be followed.
2. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and ten copies to the Commission. b. Each response shall be under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a
reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond. e. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(1 0), encrypt or redact the paper so that personal information cannot be read.
|
2016-00278
|
8/15/2016
|
PSC_ORDER
Order Entered: Duke Energy is granted a CPCN that authorizes it to bid on franchises
offered by the city of Crescent Springs, Kentucky, for electric and natural gas
transmission and distribution service.
2. If Duke Energy is not the successful bidder. Duke Energy shall, within ten
days of the award of the franchises at issue, file with the Commission a written notice
stating that Duke Energy was not the successful bidder.
3. If Duke Energy is the successful bidder. Duke Energy shall, within ten
days of the award of the franchises at issue, file with the Commission a copy of the
executed franchise agreements and a statement disclosing the amount of the initial
franchise fees.
4. If Duke Energy is the successful bidder. Duke Energy shall, within ten
days of an increase or decrease in the amount of the initial franchise fees set forth in
the franchise agreements, file with the Commission documentation setting forth the
revised fees.
5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this
Order shall reference the number of this case and shall be electronically submitted via
the Commission's electronic Tariff Filing System.
6. This Order shall not be construed as granting a CPCN to construct utility
facilities in said city.
|
2016-00293
|
8/16/2016
|
PSC_ORDER
Final Order Entered: 1. Sentra's proposed PGA clause tariff is approved . 2. As soon as possible, but no later than October 1, 2016, Sentra shall file a PGA application containing the information as set out in the form in the Appendix attached hereto in order to establish a market-based EGC for its gas cost rate. 3. Sentra shall notify the Commission within seven days of the date of this Order of its anticipated timeframe, including the latest foreseeable date, for filing an ARF application. 4. Sentra shall be subject to fines of $500 for each of its two violations of KRS 278.160 and KRS 278.180. However, the fines shall be suspended on the condition that no like violations occur in the next 24 months, after which time the fines
shall be rescinded without further action by the Commission. 5. Given the reductions in rates implemented by Sentra prior to the opening
of this investigation, no refunds of the amounts it collected subject to refund pursuant to the Order opening this proceeding shall be required.
6. Within ten days of the date of this Order, Sentra shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates currently charged to each customer class.
|
2016-00139
|
8/16/2016
|
20160816_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00174
|
8/17/2016
|
PSC_ORDER
Order Entered: The monthly water service rates requested by Morgan District in the
Application and in its August 1, 2016 response to Staffs Report are approved.
2. Morgan District shall charge the water service rates that are set forth in
Appendix A for water service rendered on and after the date of this Order.
3. Morgan District shall make adjusting journal entries to its plant ledger that
are necessary to reclassify the original cost of plant, and of depreciation that had
accumulated thereon as of the end of the test year, to the appropriate plant subsidiary
accounts as shown in Appendix B of this Order. Any depreciation that has accrued on
these assets since the end of the test year shall be allocated to each plant subsidiary
account based on the account's percentage of accumulated depreciation test-year-end
depreciation when compared to the accumulated depreciation at test-year-end for all
accounts. These percentages are also shown in Appendix B.
4. Morgan District shall use the "PSC Approved Service Life" set forth in
Appendix C to depreciate water plant assets for ratemaking and accounting purposes in
|
2016-00068
|
8/17/2016
|
PSC_ORDER
Order Entered: 1. EKPC's proposed tariffs shall be investigated in this proceeding. 2. EKPC shall publish notice of the Retail Tariff Template one time in a newspaper of general circulation in EKPC members' services areas. 3. EKPC's application for approval of certain assumption of evidences of indebtedness is continued beyond the 60-day period specified in KRS 278.300(2). 4. The procedural schedule set forth in the Appendix to this Order shall be followed. 5. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness who will be responsible for responding to questions related to the information provided, with the
original and ten copies to the Commission and copies to all parties of record. b. Each response shall be answered under oath or, for
representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2016-00269
|
8/17/2016
|
20160817_PSC_ORDER.pdf
|
2016-00179
|
8/17/2016
|
20160817_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00173
|
8/17/2016
|
20160817_PSC_ORDER.pdf
|
2016-00262
|
8/17/2016
|
20160817_PSC_ORDER.pdf
|
2015-00227
|
8/17/2016
|
20160817_PSC_ORDER.pdf
|
2016-00162
|
8/18/2016
|
PSC_ORDER
Order Entered: 1. The motion of KIUC to intervene is granted. 2. KIUC shall be entitled to the full rights of a party and shall be served with
the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. KIUC shall adhere to the procedural schedule set forth in the Commission's August 17, 2016 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, KIUC shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon KIUC in accordance with 807 KAR 5:001 , Section 4(8)(b).
|
2016-00269
|
8/19/2016
|
PSC_ORDER
Order Entered: The rate proposed by Valley Gas Is denied.
2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after the date of this Order.
3. Within 20 days of the date of this Order, Valley Gas shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00200
|
8/19/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Clark Energy Cooperative, Inc.
|
2016-00220
|
8/19/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Kentucky Power Company
|
2016-00299
|
8/19/2016
|
20160819_PSC_ORDER.pdf
|
2016-00274
|
8/19/2016
|
20160819_DATA_REQUEST.pdf
Data Request
|
2016-00291
|
8/22/2016
|
PSC_ORDER
Final Order Entered: 1. B&H is assessed a penalty of $500 for its willful violation of our June 8, 2016 Order in Case No. 2015-00367. 2. B&S is assessed a penalty of $500 for its willful violation of our June 8, 2016 Order in Case No. 2015-00367. 3. Bud Rife, as President of B&H and B&S, is assessed a penalty of $500 for his willful violation of our June 8, 2016 Order in Case No. 2015-00367. 4. B&H, B&S, and Bud Rife shall pay the assessed penalties of $500 each within 14 days of the date of this Order. Payments shall be made by certified check or money order made payable to "Kentucky State Treasurer'' and shall be mailed or delivered to the Office of General Counsel, Kentucky Public Service Commission, 211 Sower Boulevard, P.O. Box 615, Frankfort, Kentucky, 40602-0615. 5. Upon payment of $500 by 8 & H, $500 by B & S, and $500 by Bud Rife,
this case shall be closed and removed from the Commission's docket without further Order of the Commission.
|
2016-00204
|
8/22/2016
|
PSC_ORDER
Order Entered: 1. Within 20 days of the date of this Order, Mr. Crain shall file: a. Copies of water bills issued by Edmonson County to Mr. Crain for
each month of 2016 to date. b. Copies of his payment records for water bills from Edmonson County for each month of 2016 to date. c. Details about the online bill-payment process, including: (1 ) how Mr. Crain initiates online payment transactions for the Edmonson County bills; (2)
whether payment is made via a check created by Mr. Crain's bank and mailed to Edmonson County, or by electronic transfer of funds from Mr. Crain's account to Edmonson County's bank account; and (3) how Mr. Crain is alerted when payment is sent by his bank to the payee. d. The total amount of late fees incurred and the billing dates for each bill for which a late fee was incurred from 2016 to date.
|
2016-00288
|
8/22/2016
|
20160822_PSC_ORDER.pdf
|
2016-00274
|
8/23/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2016-00107
|
8/23/2016
|
PSC_ORDER
Final Order Entered: 1. North Central is granted a Certificate of Public Convenience and Necessity to construct new facilities as set forth in its application and as described in this order. 2. Should the costs of the construction authorized herein exceed by more than 10 percent the estimated costs contained in the application, North Central shall immediately notify the Commission in writing of the adjustment and include an
explanation of the additional costs for the Commission's approval. 3. As provided for in this Order, North Central shall maintain records that
clearly and sufficiently document the proper allocation of costs for jurisdictional and nonjurisdictional services provided as a result of this construction project. 4. Any documents filed pursuant to ordering paragraph 2 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00267
|
8/23/2016
|
20160823_PSC_ORDER.pdf
|
2015-00418
|
8/24/2016
|
PSC_ORDER
Order Entered: 1. Ms. Stadtlander's motion to continue for 90 days is granted. 2. This case is held in abeyance until October 24, 2016.
|
2016-00187
|
8/24/2016
|
PSC_ORDER
Order Entered: 1. The motion of Henderson to intervene is granted. 2. Henderson shall be entitled to the full rights of a party and shall be served
with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. Henderson shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Henderson shall adhere to the procedural schedule set forth in the Commission's August 15, 2016 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, Henderson shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Henderson in accordance with 807
KAR 5:001, Section 4(8)(b).
|
2016-00278
|
8/24/2016
|
20160824_PSC_ORDER.pdf
|
2015-00418
|
8/24/2016
|
20160824_PSC_ORDER.pdf
|
2016-00281
|
8/24/2016
|
20160824_PSC_ORDER.pdf
|
2016-00054
|
8/24/2016
|
20160824_DATA_REQUEST.pdf
Data Request
|
2016-00169
|
8/25/2016
|
PSC_ORDER
Order Entered: 1. The Commission Orders entered on October 10, 2013, and January 17, 2014, are revoked. 2. Kentucky Power's requests for approval of the REPA and for cost recovery of the REPA are denied. 3. Kentucky Power's Tariff B.E.R. is denied and shall be removed from its
current tariffs on file with the Commission.
|
2013-00144
|
8/25/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to IM Telecom, LLC
|
2016-00276
|
8/25/2016
|
PSC_ORDER
Final Order Entered: 1 . The rates proposed by Columbia and set forth in the Appendix to this Order are approved for billing for the September 2016 billing cycle beginning on August 29, 2016. 2. Within 20 days of the date of this Order, Columbia shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates and ACA and BA mechanism revisions approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00285
|
8/25/2016
|
PSC_ORDER
Final Order Entered: Peoples Telecom's adoption of the interconnection agreement between Windstream East and Centurylink is effective as of the date of this Order.
|
2016-00296
|
8/25/2016
|
20160825_PSC_ORDER.pdf
|
2016-00303
|
8/25/2016
|
20160825_PSC_ORDER.pdf
|
2016-00271
|
8/26/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00163
|
8/26/2016
|
PSC_ORDER
Order Entered: Budget's request to withdraw as an ETC is granted.
This case is now closed and removed from the Commission's docket.
|
2016-00184
|
8/26/2016
|
DATA_REQUEST
COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION
TO MCKINNEY COUNTY WATER DISTRICT
|
2016-00277
|
8/26/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2016-00286
|
8/26/2016
|
20160826_DATA_REQUEST.pdf
Data Request
|
2016-00274
|
8/26/2016
|
20160826_PSC_ORDER.pdf
|
2015-00418
|
8/29/2016
|
PSC_ORDER
Final Order Entered: 1. Licking Valley is granted a CPCN to purchase and install an AMI system as described in its application. 2. Licking Valley shall develop and implement a program to educate its ratepayers on the new AMI metering system.
|
2016-00077
|
8/29/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Big Rivers Electric Corporation
|
2016-00278
|
8/29/2016
|
PSC_ORDER
Order Entered: 1. OneTone is made a party to this case. 2. OneTone shall notify the Commission in writing within seven calendar days of the date of this Order of its intent to pay the delinquent bill to AT&T Kentucky within ten days of the date of this Order or, in the alternative, of
its intent to notify its end users (if any) of the proposed service disconnection. The written notice to the Commission shall include a copy of OneTone's customer notice and an affidavit indicating when the notice was mailed and the number of Kentucky customers to whom it was mailed. 3. A copy of AT&T Kentucky's notice of intent to disconnect OneTone is attached hereto as an Appendix and is incorporated herein.
4. If OneTone has not responded as prescribed in ordering paragraph 2 within seven calendar days of the date of this Order, AT&T Kentucky shall implement the procedures established in its Emergency Continuity Tariff. 5. A copy of this Order shall be sent by certified mail to One Tone.
|
2016-00300
|
8/30/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to East Kentucky Power Cooperative, Inc.
|
2016-00269
|
8/30/2016
|
20160830_PSC_ORDER.pdf
|
2016-00222
|
8/30/2016
|
20160830_PSC_ORDER.pdf
|
2016-00179
|
8/30/2016
|
20160830_PSC_ORDER.pdf
|
2016-00289
|
8/31/2016
|
20160831_PSC_ORDER.pdf
|
2016-00162
|
8/31/2016
|
20160831_PSC_ORDER.pdf
|
2015-00418
|
9/1/2016
|
PSC_ORDER
Order Entered: 1. Beech Grove's Application for approval of the loan to fund the purchase of an automated metering system is continued beyond the 60-day period specified in KRS 278.300(2). 2. Beech Grove's Application shall continue to remain in abeyance until it submits the pleadings and information necessary to request a CPCN for purchasing and installing its proposed automated metering system.
|
2016-00255
|
9/1/2016
|
PSC_ORDER
Order Entered: 1. This proceeding is established to investigate the reasonableness of the proposed Agreement. 2. The proposed Agreement is suspended for five months from September 4, 2016, its earliest possible effective date, up to and including February 3, 2017.
|
2016-00306
|
9/1/2016
|
20160901_STAFF_REPORT.pdf
Staff Report
|
2016-00177
|
9/1/2016
|
20160901_PSC_ORDER.pdf
|
2016-00268
|
9/1/2016
|
20160901_PSC_ORDER.pdf
|
2016-00292
|
9/1/2016
|
20160901_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00222
|
9/6/2016
|
PSC_ORDER
Order Entered: 1. Airview shall file its responses to the AG's Initial Request on or before 14 days from the date of this Order. 2. Supplemental requests for information to Airview shall be filed no later than September 26, 2016. 3. Airview shall file its responses to supplemental requests for information no later than October 6, 2016. 4. A formal hearing in this matter shall be held on October 12, 2016, at 9:00 a.m. Eastern Daylight Time, in the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 5. Airview shall appear at the formal hearing scheduled on October 12, 2016. 6. The October 12, 2016 hearing shall be recorded by videotape only. 7. Pursuant to 807 KAR 5:001 , Section 9(3), Airview shall serve notice of the hearing's purpose, time, place, and date to its customers no less than 14 days nor more than 21 days prior to the hearing. Airview shall provide a copy of the notice to the Commission on or before the date of the hearing. 8. The Commission shall serve a copy of this Order to the Kentucky Division of Water; the Hardin County Judge/Executive; the Mayor of the city of Elizabethtown, Kentucky; the Department of Planning and Development of the city of Elizabethtown; the Hardin County Planning and Development Commission; the Department of Water and Wastewater of the city of Elizabethtown; Hardin County Water District No. 1; Hardin County Water District No. 2; and the Lincoln Trail District Health Department.
|
2016-00207
|
9/6/2016
|
PSC_ORDER
Order Entered: 1. This case is initiated to investigate the request by Evergreen to abandon its utility services and facilities. 2. Evergreen shall continue to operate its utility facilities during the pendency of this investigation and shall continue operating until the Commission issues an Order
adjudicating Evergreen's request to abandon its facilities. 3. The information requested in the Appendix of this Order is due within 14 days of the date of this Order. Pursuant to 807 KAR 5:001 , Evergreen is to file with the Commission the original and eight copies of the following information, with a copy to all parties of record. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record, and the original and eight copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or the
person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry.
|
2016-00290
|
9/6/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Sentra Corporation
|
2016-00319
|
9/6/2016
|
20160906_PSC_ORDER.pdf
|
2016-00059
|
9/7/2016
|
PSC_ORDER
Order Entered: 1. An IC shall be held on October 5, 2016, at 9:30 a.m. Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 2. The hearing scheduled for October 11, 2016, is held in abeyance until further Order of the Commission.
3. All other provisions of the Commission's July 29, 2016 Order not in conflict with the provisions of this Order shall remain in full force and effect.
|
2016-00264
|
9/7/2016
|
20160907_PSC_ORDER.pdf
|
2016-00323
|
9/8/2016
|
PSC_ORDER
Order Entered: An IC is scheduled for Monday, September 12, 2016, at 1:00 p.m. Eastern
Daylight Time, for the purpose of providing Duke Kentucky the opportunity to discuss its
2017 ASRP plan.
2. The previously scheduled meeting is hereby cancelled.
3. Commission Staff will contact participants by electronic mail to provide
details for joining the conference by telephone.
|
2016-00228
|
9/9/2016
|
PSC_ORDER
Order Entered: The September 4, 2015 complaint filed against Duke Energy is dismissed
with prejudice.
2. This is case is closed and removed from the Commission's docket.
|
2015-00309
|
9/9/2016
|
PSC_ORDER
Final Order Entered: 1. The amounts billed by EKPC through its environmental surcharge for the period July 1, 2015, to December 31, 2015, are approved. 2. Beginning in the first full-billing month following the date of this Order, EKPC shall increase its jurisdictional environmental revenue requirement by $124,591 per month for two months. 3. EKPC shall use a rate of return of 6.041 percent in all monthly environmental surcharge filings subsequent to the date of this Order. 4. EKPC's Member Cooperatives shall include the applicable monthly retail pass-through adjustments, shown in the Appendix to this Order, in the determination of each Member Cooperative's respective pass-through mechanism in each of the first six months following the date of this Order, as discussed herein.
|
2016-00144
|
9/9/2016
|
PSC_ORDER
Order Entered: The Applicant is granted a CPON to construct a wireless
telecommunications facility. The proposed facility consists of self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located at
12119 KY 28, Gays Creek, Breathitt County, Kentucky. The coordinates for the
proposed facility are North Latitude 37° 20' 46.28" by West Longitude 83° 24' 28.66".
2. The Applicant shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00259
|
9/9/2016
|
PSC_ORDER
Order Entered: 1. North Mercer shall appear on Thursday, October 13, 2016, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, to show cause, if any, why it should not be subject to penalties pursuant to KRS 278.990 for failure to satisfy the matters complained of or file a written answer to the complaint in Case No. 2016-00154, as required by 807 KAR 5:001, Section 20(6), and the
Commission's Orders entered April 21, 2016, and June 10, 2016, in that case. 2. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(a)a, the record of the formal hearing shall be recorded by videotape only. 3. The record of Commission Case No. 2016-00154 is made a part of the
record by reference only. 4. Any request for an informal conference with Commission Staff to discuss the issues in this case shall be set forth in writing and filed with the Commission within 20 days of the date of this Order.
|
2016-00310
|
9/9/2016
|
20160909_PSC_ORDER.pdf
|
2016-00291
|
9/9/2016
|
20160909_PSC_ORDER.pdf
|
2016-00181
|
9/9/2016
|
20160909_DATA_REQUEST.pdf
Data Request
|
2016-00262
|
9/12/2016
|
PSC_ORDER
Order Entered: 1. B&H's, B&S's and Mr. Rife's joint motion to reconsider is denied. 2. B&H, B&S, and Bud Rife shall pay the assessed penalties of $500 each within 14 days of the date of this Order. Payments shall be made by certified check or money order made payable to "Kentucky State Treasurer" and shall be mailed or delivered to the Office of General Counsel, Kentucky Public Service Commission, 211 Sower Boulevard, P.O. Box 615, Frankfort, Kentucky, 40602-0615. 3. Upon payment of $500 by B&H, $500 by B&S, and $500 by Bud Rife, this case shall be closed and removed from the Commission's docket without further Order of the Commission.
|
2016-00204
|
9/12/2016
|
20160912_PSC_ORDER.pdf
Order Entered: 1. The amended motion of KIUC to intervene is granted. 2. KIUC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Within seven days of entry of this Order, KIUC shall provide its electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon Kl UC in accordance with 807 KAR 5:001, Section
4(8)(b).
|
2016-00317
|
9/12/2016
|
20160912_DATA_REQUEST.pdf
Data Request
|
2016-00281
|
9/13/2016
|
PSC_ORDER
Order Entered: 1. East Kentucky's motion for an informal conference is granted. 2. An informal conference is scheduled for Wednesday, September 14, 2016, at 9:00a.m. Eastern Daylight Time, for the purpose of discussing any issues in this matter. 3. Commission Staff will contact the parties to this matter by electronic mail to provide details for participation by telephone.
|
2016-00269
|
9/13/2016
|
PSC_ORDER
Final Order Entered: 1. Grayson's request to be relieved of the filing requirements set forth in the 2012-00426 Order is granted. 2. Grayson shall track data and maintain records as it requested and as described above, and shall submit the information to the Commission as a separate
report filed at the time it files its Annual Reports for 2016 and 2017. Thereafter, Grayson shall maintain its records so as to be able to provide the same information upon request by the Commission. 3. Any documents filed in the future pursuant to ordering paragraph 2 shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00295
|
9/13/2016
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix, which is attached hereto and incorporated herein, shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties of record and ten copies to the Commission. b. Each response shall be under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency,
be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
e. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(1 0) , encrypt or redact the paper so that personal information cannot be read.
|
2016-00306
|
9/13/2016
|
PSC_ORDER
Order Entered: 1. Kenergy shall submit to the Commission a written response to the allegations contained in the Staff Report within 20 days of the date of this Order. 2. Kenergy shall appear on Tuesday, November 29, 2016, at 9:00 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, in Frankfort, Kentucky, for the purpose of presenting evidence concerning the alleged violations of KRS 278.042, the most recent edition of NESC, and the Kenergy Safety Manual, and showing cause why it should not be subject to the
penalties prescribed in KRS 278.990(1) for these alleged violations. 3. The November 29, 2016 hearing shall be recorded by videotape only.
4. The Staff Report in the Appendix to this Order is made a part of the record in this case. 5. At the scheduled hearing in this matter, Kenergy shall also present evidence on the adequacy, safety, and reasonableness of its practices related to the construction, installation, and repair of electric facilities as they relate to the facts of this case and whether such practices require revision as related to this incident. 6. Any request for an informal conference with Commission Staff to discuss the issues in this case shall be set forth in writing and filed with the Commission within
20 days of the date of this Order.
|
2016-00324
|
9/13/2016
|
20160913_PSC_ORDER.pdf
|
2016-00272
|
9/14/2016
|
20160914_DATA_REQUEST.pdf
Data Request
|
2016-00268
|
9/14/2016
|
20160914_PSC_ORDER.pdf
|
2016-00317
|
9/15/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Clark Energy Cooperative, Inc.
|
2016-00220
|
9/15/2016
|
PSC_ORDER
Order Entered: Cawood District is to satisfy the matters complained of or file a written answer to the complaint within ten days of the date of service of this Order.
|
2016-00328
|
9/15/2016
|
20160915_PSC_ORDER.pdf
|
2016-00174
|
9/15/2016
|
20160915_PSC_ORDER.pdf
|
2016-00222
|
9/15/2016
|
20160915_PSC_ORDER.pdf
|
2015-00312
|
9/16/2016
|
PSC_ORDER
Order Entered: 1. An IC shall be held on Wednesday, September 28, 2016, at 10:00 a.m. Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard , Frankfort, Kentucky. 2. Kentucky Power's motion to suspend the hearing scheduled for October 18, 2016, is held in abeyance until further Order of the Commission.
|
2016-00279
|
9/16/2016
|
PSC_ORDER
Order Entered: 1. The motion of KIUC to intervene is granted. 2. KIUC shall be entitled to the full rights of a party and shall be served with
the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, KIUC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.
|
2016-00306
|
9/16/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.70 per 1,000 gallons, as requested by West Laurel, is approved. 2. West Laurel's proposed rates as set forth in Appendix B to this Order are approved for water service rendered by West Laurel on and after September 22, 2016. 3. Within 20 days of the date of this Order, West Laurel shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00307
|
9/16/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.73 per 1 ,000 gallons, as requested by East Laurel, is approved.
2. East Laurel's proposed rates as set forth in Appendix B to this Order are approved for water service rendered by East Laurel on and after September 22, 2016. 3. Within 20 days of the date of this Order, East Laurel shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00308
|
9/16/2016
|
PSC_ORDER
Final Order Entered: 1. The Amendment between AT&T Kentucky and Appalachian Wireless is approved as of the date of this Order. 2. This case is closed and removed from the Commission's docket.
|
2016-00321
|
9/16/2016
|
20160916_DATA_REQUEST.pdf
Data Request
|
2016-00162
|
9/16/2016
|
20160916_DATA_REQUEST01.pdf
Data Request
|
2016-00162
|
9/16/2016
|
20160916_DATA_REQUEST.pdf
Data Request
|
2016-00274
|
9/19/2016
|
PSC_ORDER
Final Order Entered: 1. Ridgelea's request for the Commission to find that Ridgelea has abandoned its sewer facilities serving the Meadowbrook, Edgewood, and Farmgate subdivisions in Franklin County, Kentucky, is denied. 2. Ridgelea's alternative request for the Commission to authorize Ridgelea to transfer its sewer facilities serving the Grantland Estates subdivision in Grant County, Kentucky, to Perfecto Properties is denied. 3. Ridgelea shall continue to operate its utility facilities unless and until the Commission issues an Order authorizing Ridgelea to abandon or transfer its facilities. 4. The Executive Director shall forward a copy of this Order to the Kentucky Division of Water, the Office of the Attorney General, the Franklin County Judge/Executive, the Farmdale Sanitation District and the Grant County Judge/Executive.
5. This case is closed and removed from the Commission's docket.
|
2016-00106
|
9/19/2016
|
20160919_PSC_ORDER.pdf
|
2016-00334
|
9/20/2016
|
DATA_REQUEST
Commission Staff's Supplemental Request for Information to Airview Utilities, LLC
|
2016-00207
|
9/20/2016
|
20160920_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00180
|
9/21/2016
|
DATA_REQUEST
COMMISSION STAFF'S SECOND REQUEST FOR INFORMATION
TO EAST KENTUCKY POWER COOPERATIVE. INC.
|
2016-00231
|
9/21/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Big Rivers Electric Corporation
|
2016-00235
|
9/21/2016
|
20160921_DATA_REQUEST.pdf
Data Request
|
2016-00233
|
9/21/2016
|
20160921_DATA_REQUEST.pdf
Data Request
|
2016-00230
|
9/21/2016
|
20160921_DATA_REQUEST.pdf
Data Request
|
2016-00234
|
9/21/2016
|
20160921_DATA_REQUEST.pdf
Data Request
|
2016-00232
|
9/22/2016
|
PSC_ORDER
Order Entered: Attorney General's motion to intervene is held in abeyance for ten days from the date of this Order to afford the Attorney General
an opportunity to file a supplemental motion setting forth good cause for filing his motion to intervene after the due date established by the Commission's July 22, 2016 Order.
|
2016-00228
|
9/22/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Martin are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered by Martin on and after October 1, 2016. 3. Within 20 days of the date of this Order, Martin shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00301
|
9/22/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Burkesville and set forth in the Appendix to this Order are approved for service rendered by Burkesville on and after September 28, 2016. 2. Within 20 days of the date of this Order, Burkesville shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00302
|
9/22/2016
|
PSC_ORDER
Final Order Entered: 1. The rate as proposed by Bluegrass and set forth in the Appendix to this Order is approved for service rendered on and after October 1, 2016. 2. Within 20 days of the date of this Order, Bluegrass shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2016-00309
|
9/22/2016
|
PSC_ORDER
Order Entered, nunc pro tunc, that: 1. Ordering paragraph 1 of the Order entered on September 9, 2016, is corrected to reflect that "North Mercer shall appear on Thursday, October 13, 2016, at 9:00 a.m. Eastern Daylight Time, in Hearing Room 1 of the Commission's offices at 211
Sower Boulevard, Frankfort, Kentucky, to show cause, if any, why it should not be subject to penalties pursuant to KRS 278.990 for failure to satisfy the matters complained of or file a written answer to the complaint in Case No. 2016-00154, as required by 807 KAR 5:001, Section 20(6), and the Commission's Orders entered April 21, 2016, and June 10, 2016, in that case." 2. All other provisions of the Commission's Order entered on September 9, 2016, shall remain in full force and effect.
|
2016-00310
|
9/22/2016
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Natural Energy and set forth in the Appendix to this Order is approved for service rendered by Natural Energy on and after October 1, 2016. 2. Within 20 days of the date of this Order, Natural Energy shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2016-00315
|
9/22/2016
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for service rendered on and after the date of this Order.
2. Within 20 days of the date of this Order, Sentra shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00319
|
9/22/2016
|
PSC_ORDER
Order Entered: The rates proposed by Millennium and set forth in the Appendix to this
Order are approved for service rendered on and after October 2, 2016.
2. Within 20 days of the date of this Order, Millennium shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00320
|
9/22/2016
|
20160922_PSC_ORDER.pdf
|
2016-00216
|
9/22/2016
|
20160922_PSC_ORDER.pdf
|
2016-00311
|
9/22/2016
|
20160922_PSC_ORDER.pdf
|
2016-00317
|
9/23/2016
|
PSC_ORDER
Order Entered: 1 . Bath County is granted a CPCN to proceed with the proposed construction as set forth in its application. 2. Bath County shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved by this Order shall be undertaken only with the prior approval of the Commission. 4. Bath County shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project. 5. Bath County is authorized to enter the proposed Assistance Agreement
with KIA and, under the terms of the Assistance Agreement, to borrow from KIA an amount not to exceed $925,470 to be repaid over a 20-year period at an interest rate of 0.75 percent per annum. 6. Within 30 days of executing its proposed Assistance Agreement with KIA, Bath County shall file with the Commission an executed copy of the Assistance Agreement.
|
2016-00270
|
9/23/2016
|
PSC_ORDER
Order Entered: The rates proposed by Citipower are denied.
2. The rates set forth in the Appendix to this Order are approved for service
rendered by Citipower on and after October 1, 2016.
3. Citipower shall submit all invoices received from Citigas and Citizens Gas
as part of all future OCR filings.
4. Within 20 days of the date of this Order, Citipower shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00318
|
9/23/2016
|
20160923_PSC_ORDER.pdf
|
2016-00147
|
9/26/2016
|
PSC_ORDER
Order Entered: The rates proposed by Western Lewis are denied.
2. Western Lewis shall continue to request that Atmos Energy marketing
provide it with projections closer to those indicated by the market for natural gas in
support of its future EGC's.
3. Western Lewis's request to use 24 months of sales volumes in the
calculation of its current quarter AA is approved and 24 months of sales volumes should
|
2016-00313
|
9/27/2016
|
PSC_ORDER
Order Entered: 1. Nolin RECC's motions for confidential protection for its December 15, 2014 application and February 18, 2015 letter to the Commission are granted. 2. Pursuant to KRS 61 .878, the information for which Nolin RECC requests confidential protection shall not be placed in the public record or made available for public inspection for ten years from the date of this Order, or until further Order of the Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Nolin RECC shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order, Nolin RECC shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Nolin RECC is unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Nolin RECC to seek a remedy afforded by law.
|
2014-00436
|
9/27/2016
|
PSC_ORDER
Order Entered: 1. Duke Kentucky's motion for confidential protection for its responses to Staff's Request, Items 1- 3, is granted. 2. The responses to Staff's Request for which Duke Kentucky seeks confidential treatment shall not be placed in the public record or made available for
public inspection within ten years from the date that the persons identified in the confidential material cease to be Duke Kentucky's customer.
3. If Duke Kentucky objects to the time limits that the Commission has placed on the confidential treatment for the material in question, it must seek either rehearing pursuant to KRS 278.400 or judicial review of this Order pursuant to KRS 278.410. 4. Use of the material in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 5. Duke Kentucky shall inform the Commission if the material in question becomes publicly available or no longer qualifies for confidential treatment. 6. If a non-party to this proceeding requests to inspect material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not run, Duke Kentucky shall have 20 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If Duke Kentucky is unable to make such demonstration, the requested material shall be made available for inspection.
|
2015-00309
|
9/27/2016
|
PSC_ORDER
Order Entered: 1. Big River's motion for confidential protection for attachments to its response to Staff's First Request, Item 7.b. , is granted.
2. Pursuant to KRS 61.878, the information for which Big Rivers requests confidential protection shall not be placed in the public record or made available for public inspection indefinitely from the date of this Order, or until further Order of the Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Big Rivers shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order, Big Rivers shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Big Rivers is
unable to make such demonstration, the requested materials shall be made available for inspection. 6. The Commission shall not make the materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow Big Rivers to seek a remedy afforded by law.
|
2016-00124
|
9/27/2016
|
PSC_ORDER01
Final Order Entered: 1. The amounts billed by Big Rivers through its environmental surcharge for the period August 1, 2015, through January 31 , 2016, are approved. 2. The amounts billed by Jackson Purchase and Kenergy through their respective environmental surcharge pass-through mechanisms for the period August 1, 2015, through January 31 , 2016, for all customers with dedicated delivery points are approved. 3. The amounts billed by the three Member Cooperatives through their respective environmental surcharge pass-through mechanisms for the period
September 1, 2015, through February 28, 2016, for all other non-dedicated delivery point customers are approved. 4. The rates of return determined by Big Rivers for each month of the review period are approved.
|
2016-00124
|
9/27/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Nolin Rural Electric Cooperative Corporation
|
2016-00275
|
9/27/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Big Rivers Electric Corporation
|
2016-00278
|
9/27/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Big Rivers Electric Corporation
|
2016-00306
|
9/27/2016
|
20160927_DATA_REQUEST.pdf
Data Request
|
2016-00289
|
9/27/2016
|
20160927_PSC_ORDER.pdf
|
2016-00026
|
9/27/2016
|
20160927_PSC_ORDER.pdf
|
2016-00027
|
9/27/2016
|
20160927_PSC_ORDER.pdf
|
2014-00372
|
9/27/2016
|
20160927_PSC_ORDER.pdf
|
2015-00368
|
9/27/2016
|
20160927_PSC_ORDER.pdf
|
2016-00222
|
9/27/2016
|
20160927_PSC_ORDER01.pdf
|
2014-00372
|
9/28/2016
|
PSC_ORDER
Final Order Entered: Big Rivers' application seeking approval to enter into the proposed Amendment is approved.
|
2016-00286
|
9/28/2016
|
PSC_ORDER
Order Entered: First Baptist Church's Motion to Intervene is granted.
2. First Baptist Church's Motion to Dismiss is denied.
3. First Baptist Church shall be entitled to the full rights of a party and shall
be served with the Commission's Orders and with filed testimony, exhibits, pleadings,
correspondence, and all other documents submitted by parties after the date of this
Order.
4. First Baptist Church shall comply with all provisions of the Commission's
regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents.
5. Within seven days of the date of this Order, First Baptist Church shall
provide to the Commission its electronic mail address to which all electronic documents
Case No. 2016-00287
issued by the Commission and all parties of record may be served upon First Baptist
Church in accordance with 807 KAR 5:001, Section 4(8)(b).
6. First Baptist Church's Motion for Extension is granted.
7. First Baptist Church's Response is accepted as filed.
8. First Baptist Church's Motion to File a Sur-reply is granted and its Surreply
is accepted as filed.
9. Within seven days of the date of this Order, First Baptist Church shall
indicate whether it requests that this case be submitted for a decision based on the
record, or whether it requests a hearing. If the latter. First Baptist Church shall include
in its request a detailed statement of the facts in dispute relating to service at the rates
provided under the 1971 Agreement. Kentuck
|
2016-00287
|
9/28/2016
|
PSC_ORDER
Order Entered: 1. An IC shall be held on Thursday, September 29, 2016, at 11:00 a.m. Eastern Daylight Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 2. The remaining requests contained in North Mercer's Motion are held in abeyance until further Order of the Commission.
|
2016-00310
|
9/28/2016
|
20160928_PSC_ORDER.pdf
|
2016-00169
|
9/28/2016
|
20160928_PSC_ORDER.pdf
|
2016-00298
|
9/28/2016
|
20160928_PSC_ORDER.pdf
|
2016-00152
|
9/28/2016
|
20160928_PSC_ORDER.pdf
|
2016-00109
|
9/29/2016
|
20160929_DATA_REQUEST.pdf
Data Request
|
2016-00262
|
9/29/2016
|
20160929_DATA_REQUEST.pdf
Data Request
|
2016-00174
|
9/30/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by WKG are denied. 2. WKG is a utility as defined in KRS 278.01 0(3)(b) and is subject to Commission jurisdiction. 3. The rates and service of WKG are subject to Commission jurisdiction pursuant to KRS 278.040. 4. WKG is hereby granted an increase in revenues of $522,707. 5. The rate design proposed by WKG is reasonable and should be approved. 6. The rates in the Appendix attached hereto are fair, just and reasonable for WKG to charge for service rendered on and after the date of this Order. 7. Within 20 days of the date of this Order, WKG shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and reflecting their effective date and that they were authorized by this Order. 8. WKG shall be subject to the Public Service Commission Annual Assessment pursuant to KRS 278.130, KRS 278.140, and 807 KAR 5:006, Section 1,
beginning in 2017 based upon calendar year 2016 gross receipts. 9. WKG shall be subject to filing annual reports with the Commission
pursuant to KRS 278.230 and 807 KAR 5:006, Section 4(2) and (3).
|
2016-00053
|
9/30/2016
|
PSC_ORDER
Order Entered: 1. Oldham Woods shall have 14 days from the date of this Order to file with the Commission written comments, if any, on the findings and recommendations contained in the attached Amended Staff Report and to request a hearing with the Commission in this matter.
2. Oldham Woods' failure to file with the Commission written objections to a finding contained in the Amended Staff Report within 14 days of this Order shall be deemed as agreement with that finding and a waiver of any right to object to that finding. 3. If Oldham Woods requests a hearing in this matter, it shall specifically identify in its written request for hearing all objections to the findings and recommendations set forth in the Amended Staff Report and shall provide a brief summary of testimony that it expects to present at hearing. 4. Within 14 days of the date of this Order, Oldham Woods shall file with the Commission in writing its position on adjusting its rates to the level shown in Appendix B of the Amended Staff Report. 5. If Oldham Woods wishes to amend its application to request the rates shown in Appendix B of the Amended Staff Report, it shall request such amendment in its response and shall mail notice of its amended rate request pursuant to 807 KAR 5:011, Section 8, and shall provide the Commission with proof of such notice.
|
2016-00131
|
9/30/2016
|
20160930_PSC_ORDER.pdf
Order Entered: Martin District's motion to submit one paper copy and ten COs containing its supplemental response to Item 19 of Staff's Second Request is granted.
|
2016-00142
|
9/30/2016
|
PSC_ORDER
Order Entered: 1. Airview's Motion for Extension of Time is granted. 2. Airview shall file within seven days of the date of this Order the certifications required by the Commission's July 29, 2016 Order for Airview's responses to the AG's Initial Request and to the Commission's First Request.
|
2016-00207
|
9/30/2016
|
DATA_REQUEST
Commission Staff's Initial Request for Information to East Kentucky Power Cooperative, Inc.
|
2016-00316
|
9/30/2016
|
PSC_ORDER
Final Order Entered: 1. The rate proposed by Valley Gas is denied. 2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after the date of this Order. Although Valley Gas's GCR rate filing did not provide 30 days' notice to the Commission as required by its tariff, KRS 278.180(2) authorizes the Commission to make a reduction in rates effective in less than 30 days. 3. Within 20 days of the date of this Order, Valley Gas shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2016-00329
|
10/4/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.07 per 1,000 gallons is approved. 2. Judy's proposed rates as set forth in Appendix B to this Order are approved for water service rendered by Judy on and after October 1, 2016. 3. Within 20 days of the date of this Order, Judy shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00330
|
10/4/2016
|
20161004_PSC_ORDER.pdf
|
2016-00005
|
10/4/2016
|
20161004_DATA_REQUEST.pdf
Data Request
|
2016-00298
|
10/5/2016
|
PSC_ORDER
Appalachian Wireless is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a self-supporting antenna
tower not to exceed 310 feet in height, with attached antenna, and is to be located at
343 EC Messer Drive, Barbourville, Knox County, Kentucky. The coordinates for the
proposed facility are North Latitude 36° 52' 22.74" by West Longitude 83° 51' 58.62".
2. Appalachian Wireless shall file a copy of the final decisions regarding the
pending FAA and KAZC applications for the proposed construction within ten days of
receiving the decisions.
3. Appalachian Wireless shall immediately notify the Commission in writing if,
after the antenna tower is built and utility service is commenced, the tower is not used
for a period of three months in the manner authorized by this Order.
4. Documents filed, if any, in the future pursuant to ordering paragraphs 2
and 3 herein shall reference this case number and shall be retained in the utility's
general correspondence file.
|
2016-00261
|
10/5/2016
|
PSC_ORDER
Order Entered: . PI Tower and Verizon Wireless are granted a CPCN to construct a
wireless telecommunications facility. The proposed facility consists of a monopole
antenna tower not to exceed 191 feet in height, with attached antenna, and is to be
located at 364 Sledd Creek Road, Gilbertsville, Marshall County, Kentucky. The
coordinates for the proposed facility are North Latitude 36° 58' 37.27" by West
Longitude 88° 17' 10.48".
2. PI Tower and Verizon Wireless shall immediately notify the Commission in
writing if, after the antenna tower is built and utility service is commenced, the tower is
not used for a period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00304
|
10/6/2016
|
PSC_ORDER
Order Entered: The Service Agreements identified as 2016-00052-A, 2016-00052-B,
2016-00052-C, 2016-00052-D, and 2016-00052-E, filed on December 16, 2015; the
Service Agreement identified as 2016-00052-F, filed on January 11, 2016; the Service
Agreement identified as 2016-00052-G, filed on January 19, 2016; and the Service
Agreements, herein identified as 2016-00052-1 and 2016-00052-J, filed on September
1, 2016, are approved on and after the date of this Order.
2. The Service Agreement identified as 2016-00052-H, filed on March 16,
2016, is conditionally approved subject to Atmos's filing within 30 days of the date of
this Order the contract amendment as described in the findings above.
|
2016-00052
|
10/6/2016
|
PSC_ORDER
Order Entered: The AG's petition for rehearing is granted.
2. Licking Valley shall file testimony fully addressing the issue of future
technical support for its existing TSII Meters no later than October 24, 2016.
3. Requests for information to Licking Valley shall be filed no later than
November 7, 2016.
4. Licking Valley shall file responses to requests for information no later than
November 21, 2016.
5. The parties shall file a statement as to whether there are any material
issues of fact that warrant a hearing or whether this case may be submitted for
adjudication based on the existing record without a hearing no later than November 30,
2016.
|
2016-00077
|
10/6/2016
|
PSC_ORDER
Final Order Entered: 1. Frontier's PRP and related surcharge, including the filing of annual reports as described in this Order, are approved to be expanded to include the Public portion of its system, for a period of seven years, on and after the date of this Order. 2. Frontier's AMR program and related surcharge, including the filing of annual updates as described in this Order, are approved to be expanded to include the
Public portion of its system, for a period of seven years, on and after the date of this Order. 3. Frontier's proposed tariff modifications to incorporate the addition of Public to its PAP and AMR programs are approved. 4. Frontier's request for an expanded CPCN to include the extension of its AMR program to Public is approved. 5. Within 20 days of the date of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the tariffs and rates as approved herein and reflecting that they were approved pursuant to this Order. 6. Any documents filed in the future pursuant to ordering paragraphs 1 and 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00132
|
10/6/2016
|
PSC_ORDER
Order Entered: Kenergy's motion for an informal conference is granted.
2. An informal conference is scheduled for Friday, October 14, 2016, at
10:30 a.m. Eastern Daylight Time for the purpose of discussing any and all issues in
this matter.
|
2016-00324
|
10/6/2016
|
PSC_ORDER
Final Order Entered: 1. TVD's request to withdraw as an ETC is granted. 2. This case is closed and removed from the Commission's docket.
|
2016-00340
|
10/6/2016
|
20161006_PSC_ORDER.pdf
|
2016-00292
|
10/6/2016
|
20161006_PSC_ORDER.pdf
|
2016-00305
|
10/6/2016
|
20161006_PSC_ORDER.pdf
|
2016-00059
|
10/7/2016
|
PSC_ORDER
Order Entered: 1. The hearing scheduled for October 11, 2016, is cancelled and shall be rescheduled at a later dated if needed. 2. All other provisions of the Commission's July 29, 2016 Order not in conflict with the provisions of this Order shall remain in full force and effect.
|
2016-00264
|
10/7/2016
|
20161007_DATA_REQUEST.pdf
Data Request
|
2016-00281
|
10/7/2016
|
20161007_PSC_ORDER.pdf
|
2016-00162
|
10/11/2016
|
PSC_ORDER
Final Order Entered: 1. Columbia's request to continue its approved residential EEC Program DSM measures through June 30, 2021, is approved. 2. Columbia's request to increase the maximum replacement cost for the Low-Income High Efficiency Furnace Replacement Program to $2,800 is approved. 3. Columbia's DSM cost recovery through its EEC Rider is approved through January 2022. 4. Columbia shall file an application no later than February 28, 2021, to request continuation of its EEC Program and EEC Rider.
|
2016-00107
|
10/11/2016
|
PSC_ORDER
Order Entered: 1. The AG's motion for an extension of time to file his Supplemental Request is granted. 2. Airview's motion for an extension of time to file its responses to the Commission's Supplemental Request is denied. Notwithstanding the denial of Airview's motion for an extension, Airview's responses to the Commission's Supplemental Request shall be filed into the record. 3. Airview's motion for an extension of time to file its responses to the AG's Supplemental Request is denied. Notwithstanding the denial of Airview's motion for an extension, Airview's responses to the AG's Supplemental Request shall be filed into the record. 4. The AG's motion to reschedule the October 12, 2016 hearing is denied.
|
2016-00207
|
10/11/2016
|
PSC_ORDER
Order Entered: 1. Wood Creek commissioners Glenn Williams, chairman; Earl Bailey, secretary; and Jimmy Keller, treasurer, individually and in their respective capacities as commissioners of Wood Creek, shall submit to the Commission individual written responses to the allegations contained herein within 20 days of the date of this Order. 2. Wood Creek commissioners Glenn Williams, chairman; Earl Bailey, secretary; and Jimmy Keller, treasurer, individually in their respective capacities as commissioners of Wood Creek, or as the utility's manager, shall appear at a hearing scheduled for December 13, 2016, at 9:00 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, and be prepared to show cause why they should not be subject to the penalties prescribed in KRS 278.990(1) for the alleged violation of KRS 278.300. 3. The December 13, 2016 Hearing shall be recorded by videotape only. 4. The record of Case No. 2014-00440 shall be incorporated into this case by reference only. 5. Any request for an informal conference to discuss the issues in this case,
which may be held via telephone with Commission Staff at the request of any of the above-named commissioners, shall be set forth in writing and filed with the Commission within 20 days of the date of this Order.
|
2016-00338
|
10/11/2016
|
PSC_ORDER
Order Entered: 1. Duke Kentucky shall submit to the Commission a written response to the allegations contained in the Staff Report within 20 days of the date of this Order. 2. Duke Kentucky shall appear on December 8, 2016, at 9:00 a.m., Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, for the purpose of presenting evidence concerning the alleged violations of KRS 278.042, the most recent edition of NESC, and the Duke Kentucky Safety Manual and showing cause why it should not be subject to the
penalties prescribed in KRS 278.990(1) for these alleged violations. 3. The December 8, 2016 hearing shall be recorded by videotape only.
4. The Staff Report attached hereto as an Appendix to this Order is made a part of the record in this case. 5. At the scheduled hearing in this matter, Duke Kentucky shall also present evidence on the adequacy, safety, and reasonableness of its practices related to the construction, installation, and repair of electric facilities as they relate to the facts of this case and whether such practices require revision as related to this incident. 6. Any request for an informal conference with Commission Staff to discuss the issues in this case shall be set forth in writing and filed with the Commission within 20 days of the date of this Order.
|
2016-00349
|
10/11/2016
|
20161011_PSC_ORDER.pdf
|
2016-00177
|
10/11/2016
|
20161011_PSC_ORDER.pdf
|
2016-00336
|
10/11/2016
|
20161011_DATA_REQUEST.pdf
Data Request
|
2016-00268
|
10/12/2016
|
PSC_ORDER
Final Order Entered: 1. North Mercer's offer and tender of $500.00 for failure to file an answer in Case No. 2016-00154 is accepted in full settlement of Case No. 2016-00310. 2. The hearing scheduled for October 13, 2016, is cancelled. 3. This case is closed and removed from the Commission's docket.
|
2016-00310
|
10/12/2016
|
PSC_ORDER
Order Entered: 1 . EKPC and each of its Member Cooperatives listed in footnote 2 shall be parties to this case. 2. The procedural schedule set forth in Appendix A to this Order shall be followed in this proceeding. 3. Any motion to intervene filed after November 10, 2016, shall show a basis
for intervention and good cause for being untimely. If the untimely motion is granted, the movant shall accept and abide by the existing procedural schedule. 4. EKPC shall, by the date set forth in Appendix A, file its prepared direct testimony in support of the reasonableness of the application of its environmental surcharge mechanism and the application of the pass-through mechanism during the period under review. 5. EKPC and the Member Cooperatives shall, by the date set forth in Appendix A, file their prepared direct testimony on their consideration to alternatively direct bill EKPC's environmental costs in lieu of the current billing methodology. 6. Any party filing testimony shall file an original and eight copies. 7. a. EKPC and each of its 16 Member Cooperatives shall file responses to the questions asked of the particular cooperative in Appendix B. The information requested herein is due no later than October 31, 2016. Responses to requests for shall be appropriately bound, tabbed, and indexed and shall include name of witness responsible for responding to the questions related to information provided, with copies to all parties of record and eight copies to the Commission.
|
2016-00335
|
10/12/2016
|
20161012_PSC_ORDER.pdf
|
2016-00314
|
10/12/2016
|
20161012_PSC_ORDER.pdf
|
2015-00236
|
10/14/2016
|
DATA_REQUEST
Commission Staff's Third Request for Information to East Kentucky Power Cooperative, Inc.
|
2016-00231
|
10/14/2016
|
PSC_ORDER
Order Entered: Kentucky Power's motion to suspend the hearing scheduled for October 18, 2016, is granted, subject to possible rescheduling at a later date, if necessary, upon the Commission's review of Kentucky Power's stipulated settlement.
|
2016-00279
|
10/14/2016
|
DATA_REQUEST
Commission Staff's Initial Request for Information to Kentucky Frontier Gas, LLC
|
2016-00348
|
10/14/2016
|
20161014_PSC_ORDER.pdf
|
2015-00232
|
10/14/2016
|
PSC_ORDER
Order Entered: 1. All future correspondence or filings in connection with this case shall reference the above case number. 2. All documents submitted in this proceeding shall comply with the Commission’s rules of procedure as set forth in 807 KAR 5:001 and any deviation from these
rules shall be submitted in writing to the Commission for consideration. 3. Any party filing a paper shall upload an electronic version using the Commission's E-Filing System and shall file an original and six copies in paper medium, except that only two copies in paper medium shall be filed of maps, plans, specifications, and drawings pursuant to 807 KAR 5:001, Section 15(2)(d). 4. Any request for confidential treatment of material submitted shall conform to the requirements in 807 KAR 5:001(13). 5. Materials submitted to the Commission which do not comply with the rules of procedure or that do not have an approved deviation are subject to rejection pursuant to 807 KAR 5:001, Section 3.
|
2016-00365
|
10/14/2016
|
20161014_PSC_ORDER.pdf
|
2016-00365
|
10/17/2016
|
PSC_ORDER
Order Entered: 1. Ms. Stadtlander's motion to continue is granted. 2. This case is held in abeyance until November 25, 2016.
|
2016-00187
|
10/17/2016
|
PSC_ORDER
Order Entered: 1. No later than November 15, 2016, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings and recommendations regarding Sandy Hook's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings and recommendations contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Sandy Hook's financial condition supports a higher rate than Sandy Hook proposes or the assessment of an additional rate or charge not proposed in Sandy Hook's application, Sandy Hook in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the recommended additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which Sandy Hook accounts for the depreciation of Sandy Hook's assets, Sandy Hook in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require Sandy Hook to implement the proposed change for accounting purposes.
|
2016-00265
|
10/17/2016
|
PSC_ORDER
Order Entered: 1. Cawood's motion for leave to file its answer after the due date is granted. 2. Cawood's answer is deemed filed as of October 3, 2016.
|
2016-00328
|
10/17/2016
|
20161017_PSC_ORDER.pdf
|
2015-00312
|
10/17/2016
|
20161017_DATA_REQUEST.pdf
Data Request
|
2016-00262
|
10/17/2016
|
20161017_DATA_REQUEST.pdf
Data Request
|
2016-00230
|
10/17/2016
|
20161017_PSC_ORDER.pdf
|
2016-00162
|
10/18/2016
|
PSC_ORDER
Order Entered: Big Rivers' Petition for Confidential Treatment of its Responses to the
Appendix to the Commission's Order dated February 5, 2016, Item No. 18, is granted.
2. Big Rivers' Petition for Confidential Treatment of its Responses to the
Appendix to the Commission's Order dated February 5, 2016, Item No. 24, and Big
Rivers' Responses to PSC 3-2 is denied.
3. Big Rivers' Petition for Confidential Treatment of its Responses to Staff's
Second Request, Item 1, and its Responses to PSC 3-5 is granted.
4. Big Rivers' Petition for Confidential Treatment of Its Responses to PSC 3-
4 is granted.
5. The materials for which Big Rivers has been granted confidential
treatment should not be placed in the public record or be made available for public
inspection for an indefinite period of time, or until further Order of this Commission.
6. Use of the materials in question in this proceeding shall be in compliance
with 807 KAR 5:001, Section 13(9).
7. Big Rivers shall inform the Commission if the materials in question
become publicly available or no longer qualify for confidential treatment.
|
2016-00006
|
10/18/2016
|
20161018_DATA_REQUEST.pdf
Commission Staff's Third Request for Information to Martin County Water District
|
2016-00142
|
10/18/2016
|
PSC_ORDER
Order Entered: that the procedural schedule in this matter is
amended as set forth in the appendix to this Order, and all other provisions of the
Commission's July 22, 2016 Order shall remain in full force and effect.
|
2016-00228
|
10/18/2016
|
DATA_REQUEST
Commission Staff's Third Request for Information to Big Rivers Electric Corporation
|
2016-00235
|
10/18/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Kenergy Corp.
|
2016-00324
|
10/18/2016
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed in this proceeding. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with copies to all parties and the original and eight copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or,
though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part
of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond. e. A party filing a paper containing personal information shall, in accordance with 807 KAR 5:001, Section 4(10), encrypt or redact the paper so that the personal information cannot be read.
|
2016-00332
|
10/18/2016
|
PSC_ORDER
Order Entered: The rate proposed by Navitas KY is denied.
2. The rate set forth in the Appendix to this Order is approved for service
rendered by Navitas on and after November 1, 2016.
|
2016-00333
|
10/18/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.27 per 1,000 gallons Is
approved.
2. West McCracken's proposed rates as set forth In Appendix B to this Order
are approved for water service rendered by West McCracken on and after October 1,
2016.
3. Within 20 days of the date of this Order, West McCracken shall file with
the Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00339
|
10/18/2016
|
PSC_ORDER
Order Entered: The rates proposed by Delta and set forth in the Appendix to this Order
are approved for final meter readings on and after October 31, 2016.
2. Within 20 days of the date of this Order, Delta shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00350
|
10/18/2016
|
PSC_ORDER
Order Entered: The rate as proposed by Public and set forth in the Appendix to this Order
is approved for service rendered on and November 1, 2016.
2. Within 20 days of the date of this Order, Public shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00351
|
10/18/2016
|
PSC_ORDER
Order Entered: The rate proposed by LG&E and set forth in the Appendix to this Order is
approved for gas supplied by LG&E on and after November 1, 2016.
2. Within 20 days of the date of this Order, LG&E shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00353
|
10/18/2016
|
20161018_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00274
|
10/18/2016
|
20161018_PSC_ORDER.pdf
|
2016-00331
|
10/18/2016
|
20161018_PSC_ORDER.pdf
|
2016-00343
|
10/18/2016
|
20161018_DATA_REQUEST.pdf
Data Request
|
2016-00232
|
10/18/2016
|
20161018_DATA_REQUEST.pdf
Data Request
|
2016-00233
|
10/19/2016
|
PSC_ORDER
Order Entered: 1. Louisville Metro's complaint is rejected for failing to conform to the requirements of 807 KAR 5:001, Section 20(1 )(c), and for failing to state a prima facie case. 2. Louisville Metro shall have 20 days from the date of this Order to file an amended complaint with the Commission that conforms to the requirements of 807 KAR 5:001, Section 20(1 ), and that states a prima facie case.
|
2016-00347
|
10/19/2016
|
20161019_DATA_REQUEST.pdf
Data Request
|
2016-00234
|
10/19/2016
|
20161019_PSC_ORDER.pdf
|
2016-00152
|
10/19/2016
|
20161019_PSC_ORDER.pdf
|
2016-00059
|
10/20/2016
|
PSC_ORDER
Order Entered: 1. The Joint Respondents' motion requesting leave to late file their Response to the AG's Motion is granted. 2. The AG's motion requesting leave to late file his reply to the Joint Respondents' response to the AG's Motion is granted. 3. The AG's Motion for a more adequate and complete response to the AG's Initial Request, Item 6(f), concerning remuneration during the past five years from HSH to Mr. Rife and any individuals related to him by blood or marriage, is denied as having been answered. 4. The AG's Motion for a more adequate and complete response to the AG's Initial Request, Item 11, concerning copies of all documents setting forth the costs B&S incurs in obtaining gas for B&H, is granted. 5. The AG's Motion for an adequate and complete response to the AG's Initial Request, Item 21, concerning whether B&H is contemplating or plans to file bankruptcy, is denied. 6. The AG's Motion for an adequate and complete response to the AG's Initial Request, Item 22, concerning whether B&S is contemplating or plans to file bankruptcy, is denied. 7. The AG's Motion for an adequate and complete response to the AG's Supplemental Request, Item 2(c), concerning sums paid by JCG and HSH to Rife Construction, is denied. 8. The AG's Motion for an adequate and complete response to the AG's Supplemental Request, Item 3(b), concerning the amount of profit or loss of HSH, is denied.
|
2015-00367
|
10/20/2016
|
PSC_ORDER
Order Entered: 1. The Companies' motion for rehearing is granted. 2. The rates in the Appendix attached hereto are approved for service WKG
renders on and after the date of this Order. 3. Within 20 days of the date of this Order, WKG shall file with this Commission, using the Commission's electronic Tariff Filing System, new tariff sheets setting forth the rates and charges approved herein and reflecting their effective date and that they were authorized by this Order. 4. All other provisions of the Commission's September 30, 2016 Order not in conflict with this Order shall remain in full force and effect. -
|
2016-00053
|
10/20/2016
|
PSC_ORDER
Order Entered: 1. The procedural schedule set forth in the Appendix, which is attached hereto and incorporated herein, shall be followed. 2. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided, with an original in paper medium and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or the person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Kenergy Corp. ("Kenergy'') shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2016-00324
|
10/21/2016
|
PSC_ORDER
Order Entered: 1. EKPC's motion for a seven-day extension of time is granted. 2. EKPC shall file its direct testimony and discovery responses no later than November 7, 2016.
|
2016-00335
|
10/21/2016
|
20161021_PSC_ORDER.pdf
|
2016-00367
|
10/21/2016
|
PSC_ORDER
Order Entered: 1. All future correspondence or filings in connection with this case shall reference the above case number. 2. All documents submitted in this proceeding shall comply with the Commission’s rules of procedure as set forth in 807 KAR 5:001 and any deviation from these
rules shall be submitted in writing to the Commission for consideration. 3. Any party filing a paper shall upload an electronic version using the Commission's E-Filing System and shall file an original and six copies in paper medium, except that only two copies in paper medium shall be filed of maps, plans, specifications, and drawings pursuant to 807 KAR 5:001, Section 15(2)(d). 4. Any request for confidential treatment of material submitted shall conform to the requirements in 807 KAR 5:001(13). 5. Materials submitted to the Commission which do not comply with the rules of procedure or that do not have an approved deviation are subject to rejection pursuant to 807 KAR 5:001, Section 3.
|
2016-00367
|
10/24/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.02 per 1,000 gallons is approved. 2. North Shelby's proposed rates as set forth in Appendix B to this Order are approved for water service rendered by North Shelby on and after November 1, 2016. 3. Within 20 days of the date of this Order, North Shelby shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00354
|
10/24/2016
|
20161024_PSC_ORDER.pdf
|
2016-00370
|
10/24/2016
|
20161024_PSC_ORDER.pdf
|
2016-00371
|
10/24/2016
|
20161024_PSC_ORDER.pdf
|
2016-00215
|
10/24/2016
|
20161024_PSC_ORDER.pdf
|
2016-00174
|
10/24/2016
|
20161024_DATA_REQUEST.pdf
Data Request
|
2016-00289
|
10/25/2016
|
PSC_ORDER
Final Order Entered: 1. Kentucky Power is granted a CPCN that authorizes it to bid on a franchise offered by the city of Whitesburg, Kentucky, for electric transmission and distribution service. 2. If Kentucky Power is not the successful bidder, Kentucky Power shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Kentucky Power was not the successful bidder. 3. If Kentucky Power is the successful bidder, Kentucky Power shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the
executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Kentucky Power is the successful bidder, Kentucky Power shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00299
|
10/25/2016
|
PSC_ORDER
Final Order Entered: 1.The presentations at the KRWA regional meetings held on October 11, 13, and 20, 2016, in Morehead, Owensboro, and Draffenville, Kentucky, respectively, are accredited and approved for two credit hours of water district management training each, for a maximum of six credit hours. 2. KRWA shall retain a record of all water district commissioners attending the accredited and approved presentations.
3. No later than 30 days after each presentation, KRWA shall file with the Commission: a. A sworn statement attesting that the accredited instruction was performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application;
c. The name of each attending water district commissioner, his or her water district, and the number of hours that he or she attended; d. A copy of any written material given to water commissioners attending the presentations; and e. Documents indicating whether the Kentucky Board of Certification of Water Treatment and Distribution System Operators and the Kentucky Board of Certification of Wastewater System Operators approved the training for continuing education credit.
|
2016-00341
|
10/25/2016
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for final meter readings on and after November 1, 2016.
2. Within 20 days of the date of this Order, Atmos shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00352
|
10/25/2016
|
PSC_ORDER
Final Order Entered: 1. The rates set forth in the Appendix to this Order are approved for service rendered on and after November 2, 2016.
2. Within 20 days of the date of this Order, Sentra shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00357
|
10/25/2016
|
PSC_ORDER
Final Order Entered: 1. PPL, LG&E, and KU are relieved of the filing requirement set forth in ordering paragraph No. 3 of the Commission's September 30, 2010 Order in Case No. 2011-00134. 2. In their next DSM application, LG&E and KU shall discuss any PPL DSM offerings not available to LGE/KU customers with a description of the offerings and an explanation for why they should not be offered in Kentucky.
|
2016-00359
|
10/25/2016
|
20161025_PSC_ORDER.pdf
|
2016-00214
|
10/25/2016
|
20161025_DATA_REQUEST.pdf
Data Request
|
2016-00327
|
10/25/2016
|
20161025_PSC_ORDER.pdf
|
2016-00317
|
10/25/2016
|
20161025_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00234
|
10/25/2016
|
20161025_PSC_ORDER.pdf
|
2015-00227
|
10/25/2016
|
20161025_PSC_ORDER.pdf
|
2016-00367
|
10/25/2016
|
PSC_ORDER
Order Entered: Nolin RECC shall file a revised notice of intent stating the test period to be used in support of its rate application and a date for
filing the rate application which is at least 30 days from the date of the revised notice.
|
2016-00367
|
10/25/2016
|
20161025_PSC_ORDER.pdf
|
2016-00360
|
10/25/2016
|
20161025_PSC_ORDER.pdf
|
2016-00361
|
10/26/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Duke Energy Kentucky, Inc.
|
2016-00228
|
10/26/2016
|
PSC_ORDER
Order Entered: 1. Mr. Crain's Complaint is rejected for failing to conform to the requirements of 807 KAR 5:001, Section 20(1 )(c), and for failing to state a prima facie case. 2. Mr. Crain shall have 14 days from the date of this Order to file an amended complaint with the commission that conforms to the requirements of 807 KAR 5:001, Section 20(1 ), and that states a prima facie case.
|
2016-00288
|
10/27/2016
|
PSC_ORDER
Final Order Entered: 1. The 2016 Water Personnel Training Seminar, which the Commission conducted at Jenny Wiley State Resort Park in Prestonsburg, Kentucky, on September 13-14, 2016, is approved for a maximum of 12 credit hours of water district management training and for a maximum of 12 credit hours of new water district commissioner training. 2. Within 20 days of the date of this Order, Commission Staff shall file into
the post case referenced correspondence file for this case a list of the names of each attendee, his or her water district, and the number of hours that he or she attended at this training program.
|
2016-00283
|
10/27/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Frontier are denied. 2. The rates set forth in the Appendix to this Order are approved for final
meter readings by Frontier on and after November 1, 2016. 3. Within 20 days of the date of this Order, Frontier shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order. 4. Frontier shall provide detailed discussions of its efforts to decrease the incidence of gas loss on its system, as well as any updates to projections for when such losses are expected to decrease to 5 percent or below, with every future application in
which gas cost recovery is proposed with no L&U limit.
|
2016-00348
|
10/27/2016
|
20161027_DATA_REQUEST.pdf
Data Request
|
2016-00174
|
10/31/2016
|
PSC_ORDER
Final Order Entered: 1. Columbia Gas is granted a CPCN that authorizes it to bid on a franchise offered by the city of Hindman, Kentucky, for the transmission and distribution of natural gas. 2. If Columbia Gas is not the successful bidder, Columbia Gas shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Columbia Gas was not the successful bidder. 3. If Columbia Gas is the successful bidder, Columbia Gas shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Columbia Gas is the successful bidder, Columbia Gas shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00375
|
10/31/2016
|
20161031_PSC_ORDER.pdf
|
2016-00382
|
11/1/2016
|
20161101_PSC_ORDER.pdf
|
2016-00370
|
11/1/2016
|
20161101_PSC_ORDER.pdf
|
2016-00371
|
11/2/2016
|
20161102_DATA_REQUEST.pdf
Data Request
|
2016-00303
|
11/3/2016
|
PSC_ORDER
Order Entered: 1. A hearing for the purpose of taking evidence and argument regarding the gas costs of B&H Gas Company, pursuant to KRS 278.2207, and the wholesale gas price charged by its affiliate, B&S Oil and Gas Company, pursuant to KRS 278.274, shall be held on Monday, November 21, 2016, beginning at 9:00 a.m., Eastern Standard Time, at the offices of the Public Service Commission, 211 Sower Boulevard, Frankfort, Kentucky. 2. This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov. 3. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9)(a), the record of the hearing in this matter shall be by digital video recording. 4. Any request to postpone this hearing shall be made by motion filed with the Commission at least one week before the hearing is scheduled to commence.
|
2015-00367
|
11/3/2016
|
PSC_ORDER
Final Order Entered: 1. The Stipulation is adopted and approved in its entirety as a complete resolution of all issues in this case. 2. As a result of the March 31, 2016 incident, LG&E agrees to pay a civil penalty, pursuant to KRS 278.990, in the amount of $10,000. 3. Upon payment of $10,000 by LG&E, this case shall be closed and removed from the Commission's docket without further Order of the Commission.
|
2016-00202
|
11/3/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to The City of Henderson, Kentucky, and the Henderson Utility Commission d/b/a Henderson Municipal Power & Light
|
2016-00278
|
11/3/2016
|
20161103_PSC_ORDER.pdf
|
2016-00180
|
11/3/2016
|
20161103_PSC_ORDER.pdf
|
2016-00386
|
11/3/2016
|
20161103_DATA_REQUEST.pdf
Data Request
|
2016-00169
|
11/4/2016
|
DATA_REQUEST
COMMISSION STAFFS REHEARING REQUEST FOR INFORMATION TO
LICKING VALLEY RURAL ELECTRIC COOPERATIVE CORPORATION
|
2016-00077
|
11/4/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. The Attorney General shall adhere to the procedural schedule set forth in
the Commission's October 18, 2016 Order and as amended by subsequent Orders. 5. Within seven days of entry of this Order, the Attorney General shall provide the Commission his electronic mail address to which all electronic documents issued by the Commission and all parties of record may be served upon the Attorney General in accordance with 807 KAR 5:001, Section 4(8)(b).
|
2016-00332
|
11/4/2016
|
20161104_PSC_ORDER.pdf
|
2016-00274
|
11/4/2016
|
20161104_PSC_ORDER01.pdf
|
2016-00274
|
11/4/2016
|
20161104_PSC_ORDER.pdf
|
2016-00361
|
11/4/2016
|
20161104_PSC_ORDER.pdf
|
2016-00109
|
11/7/2016
|
PSC_ORDER
Final Order Entered: 1. The presentations at the training sessions held by KRWA at the Holiday Inn University Plaza Sloan Convention Center in Bowling Green, Kentucky, on October 25, 2016, are accredited and approved for a maximum of six credit hours of water district management training. 2. KRWA shall retain a record of all water district commissioners attending the accredited and approved presentations. 3. No later than 30 days after each presentation, KRWA shall file with the Commission: a. A sworn statement attesting that the accredited instruction was
performed; b. A description of any changes in the presenters or the proposed curriculum that occurred after KRWA's application; c. The name of each attending water district commissioner, his or her water district, and the number of hours that he or she attended; d. A copy of any written material given to water commissioners attending the presentations; and e. Documents indicating whether the Kentucky Board of Certification
of Water Treatment and Distribution System Operators and the Kentucky Board of Certification of Wastewater System Operators approved the training for continuing education credit.
|
2016-00322
|
11/7/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.01 per 1,000 gallons is approved. 2. Garrard County's proposed rates are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Garrard County on and after November 10, 2016. 4. Within 20 days of the date of this Order, Garrard County shall file with the Commission , using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00344
|
11/7/2016
|
PSC_ORDER
Final Order Entered: 1. Farmers RECC is granted a CPCN that authorizes it to bid on a franchise offered by the city of Cave City, Kentucky, for electric transmission and distribution service. 2. If Farmers RECC is not the successful bidder, Farmers RECC shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that Farmers RECC was not the successful bidder. 3. If Farmers RECC is the successful bidder, Farmers RECC shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If Farmers RECC is the successful bidder, Farmers RECC shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00385
|
11/7/2016
|
20161107_PSC_ORDER.pdf
|
2016-00360
|
11/9/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00358
|
11/9/2016
|
PSC_ORDER
Order Entered: 1. A formal hearing in this matter shall be held on Wednesday, January 11, 2017, at 9:00 a.m. Eastern Standard Time, in the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 2. Evergreen shall appear at the formal hearing scheduled on January 11,
2017. 3. Evergreen shall mail a copy of the notice of hearing to each customer and shall give notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b}. In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSG website, psc.ky.gov." At the time the notice is mailed, Evergreen shall forward a duplicate of the notice and request to the
Commission. 4. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9)(a), the record of the formal hearing in this matter shall be by digital video recording. 5. The information requested in the Appendix to this Order is due within 14 days of the date of this Order. Pursuant to 807 KAR 5:001, Evergreen is to file with the Commission the original and seven copies of the information, with a copy to all parties of record. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided.
|
2016-00290
|
11/9/2016
|
PSC_ORDER
Final Order Entered: 1. Appalachian Wireless is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a self-supporting antenna tower not to exceed 31 0 feet in height, with attached antenna, and is to be located at 2435 KY 89 South, McKee, Jackson County, Kentucky. The coordinates for the proposed facility are North Latitude 37° 24' 42.47" by West Longitude 84° 02' 00.8".
2. Appalachian Wireless shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00297
|
11/9/2016
|
DATA_REQUEST
Commission Staff's Initial Request for Information to Martin Gas, Inc.
|
2016-00332
|
11/9/2016
|
PSC_ORDER
Order Entered: An IC shall be held on Tuesday, November 15, 2016, at 10:00 a.m.
Eastern Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort,
Kentucky.
2. Duke's motion to suspend the hearing scheduled for December 8, 2016, is
held in abeyance until further Order of the Commission.
3. All other provisions of the Commission's October 11, 2016 Order not in
conflict with the provisions of this Order shall remain in full force and effect.
|
2016-00349
|
11/9/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.13 per 1,000 gallons Is
approved.
2. Levee Road's proposed rates as set forth In Appendix Bto this Order are
approved for water service rendered by Levee Road on and after November 1, 2016.
3. Within 20 days of the date of this Order, Levee Road shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00364
|
11/9/2016
|
20161109_PSC_ORDER.pdf
|
2016-00274
|
11/10/2016
|
PSC_ORDER
Order Entered: The water service rates requested by Marion District are denied.
2. The water service rates set forth in the Appendix to this Order are
approved for services rendered by Marion District on and after the date of this Order.
3. Within 20 days of the date of this Order, Marion District shall file revised
tariff sheets with the Commission using the Commission's electronic Tariff Filing System
containing the rates set forth in the Appendix of this Order.
|
2016-00163
|
11/10/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to IM Telecom, LLC
|
2016-00276
|
11/10/2016
|
PSC_ORDER
Order Entered: 1. Farmers R.E.C.C's motion to utilize paper filing procedures is granted. 2. The Commission's Order entered October 14, 2016, is amended to the extent that from today forward this case shall be processed utilizing paper filing procedures. 3. The style of this case is revised to remove the reference to "Electronic."
|
2016-00365
|
11/10/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Farmers Rural Electric Cooperative Corporation
|
2016-00365
|
11/10/2016
|
PSC_ORDER
Final Order Entered: 1. Teleport's petition regarding the Pooling Administrator's denial of its application for assignment of additional numbering resources is granted. 2. The decision of the Pooling Administrator denying Teleport's request for the assignment of four new thousands-blocks for the Covington rate center in Kentucky is hereby overturned. 3. The Pooling Administrator shall assign Teleport four thousands-blocks of
3,500 consecutive numbers for the Covington rate center. 4. The numbering resources considered in this Order are to be assigned for
the sole use of Teleport's customer, the IRS. If the numbering resources requested by Teleport are no longer required to meet the service, the associated numbering resources approved in this Order shall be returned to the Pooling Administrator.
|
2016-00369
|
11/10/2016
|
20161110_PSC_ORDER.pdf
|
2016-00323
|
11/10/2016
|
20161110_DATA_REQUEST.pdf
Data Request
|
2016-00370
|
11/10/2016
|
20161110_DATA_REQUEST.pdf
Data Request
|
2016-00371
|
11/14/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Kenergy Corp.
|
2016-00324
|
11/14/2016
|
PSC_ORDER
Final Order Entered: 1. Hardin County No. 1 is authorized to issue its proposed 2016 Refunding Bonds in a principal amount not to exceed a total of $4,200,000 for the purpose of refinancing the Series 2005 Bonds, but only under such terms and conditions that will produce both positive gross savings and net present value savings. 2. If the actual terms and conditions of the 2016 Refunding Bonds differ from those set forth in the application, Hardin County No. 1 shall, within 30 days of issuing the 2016 Refunding Bonds authorized in this proceeding, file with the Commission
amortization schedules and work papers showing the actual gross savings and net present value savings that resulted from the refinancing of the Outstanding Revenue Bonds. 3. Hardin County No. 1 shall, within 30 days of issuing the 2016 Refunding Bonds authorized herein, file with the Commission a statement setting forth the date the 2016 Refunding Bonds were issued, the actual interest rates, and the principal amount. 4. The proceeds from Hardin County No. 1's issuance of the 2016 Refunding Bonds shall be used only for the lawful purposes specified in the application. 5. Any documents filed pursuant to ordering paragraphs 2 and 3 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00362
|
11/14/2016
|
20161114_PSC_ORDER.pdf
|
2016-00262
|
11/14/2016
|
20161114_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00230
|
11/15/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Airview Utilities, LLC
|
2016-00207
|
11/15/2016
|
STAFF_REPORT
Notice of Filing of Commission Staff Report
|
2016-00265
|
11/15/2016
|
PSC_ORDER
Order Entered: Exhibit C to Kenergy's Response filed October 28, 2016, shall be removed from the case record and returned to Kenergy.
|
2016-00324
|
11/15/2016
|
PSC_ORDER
Order Entered: 1. A telephonic IC shall be held on Wednesday, November 16, 2016, at 1:00 p.m. Eastern Standard Time, at the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 2. Wood Creek's motion to suspend the hearing scheduled for December 13, 2016, is held in abeyance until further Order of the Commission. 3. All other provisions of the Commission's October 11, 2016 Order not in conflict with the provisions of this Order shall remain in full force and effect.
|
2016-00338
|
11/15/2016
|
PSC_ORDER
Final Order Entered: 1. North Mercer is authorized to enter into an agreement with KRWFC to borrow no more than $2,079,0007 for the purpose of refunding the outstanding indebtedness, but only under such terms and conditions that will produce both positive gross savings and net present value savings. 2. If the actual terms and conditions of the agreement differ from those set forth in its application, North Mercer shall, within 30 days of executing the loan agreement, file with the Commission amortization schedules and work papers showing the actual gross savings and net present value savings that resulted from the refinancing of the Outstanding Revenue Bonds. 3. Within 30 days of executing the proposed agreement, North Mercer shall file a copy of the executed Assistance Agreement and any documents referenced in the executed Assistance Agreement that North Mercer has not previously filed with the Commission. 4. The proceeds from the Assistance Agreement shall be used only for the lawful purposes specified in North Mercer's application. 5. Any documents filed pursuant to ordering paragraphs 2 and 3 of this Order
shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00355
|
11/15/2016
|
PSC_ORDER
Order Entered: 1. Big Rivers and each of its three Member Cooperatives listed in footnote 2 shall be made parties to this case. 2. The procedural schedule set forth in Appendix A to this Order shall be followed in this proceeding. 3. Any motion to intervene after December 27, 2016, shall show a basis for intervention and good cause for being untimely. If the untimely motion is granted, the movant shall accept and abide by the existing procedural schedule. 4. Big Rivers shall, by the date set forth in Appendix A to this Order, file its prepared direct testimony in support of the reasonableness of the application of its environmental surcharge mechanism and the three Member Cooperatives, or Big Rivers
on their behalf, shall file by that date their prepared direct testimony in support of the reasonableness of the application of the pass-through mechanism during the periods under review. 5. Big Rivers and the three Member Cooperatives shall, by the date set forth in Appendix A, file their prepared direct testimony on their consideration to alternatively direct bill Big Rivers' environmental costs in lieu of the current billing methodology. 6. Any party filing testimony shall file an original and seven copies. 7. a. The information requested herein is due on or before the date specified in Appendix A to this Order.
|
2016-00368
|
11/15/2016
|
20161115_PSC_ORDER.pdf
|
2016-00152
|
11/15/2016
|
20161115_PSC_ORDER.pdf
|
2016-00371
|
11/16/2016
|
PSC_ORDER
Order Entered: 1. The Companies' request to reschedule the November 21, 2016 evidentiary hearing in this matter is granted. 2. The Companies' request to opt out of the electronic transmission of Commission Orders and for service of Orders to be made by U.S. mail is denied.
3. The hearing previously scheduled for November 21, 2016, is rescheduled to December 5, 2016, beginning at 9:00 a.m., Eastern Standard Time. 4. All other provisions in the November 3, 2016 Order shall remain in full force and effect.
|
2015-00367
|
11/16/2016
|
PSC_ORDER
Final Order Entered: 1. The sewer rate requested by Oldham Woods in its original application is denied. 2. The rate as set forth In the Appendix to this Order is approved for sewer service rendered by Oldham Woods on and after the date of this Order. 3. Within 20 days of the date of this Order, Oldham Woods shall file revised tariff sheets with the Commission, using the Commission's electronic Tariff Filing System, setting forth the rates approved herein.
|
2016-00131
|
11/16/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to North Mercer Water District
|
2016-00154
|
11/16/2016
|
DATA_REQUEST01
Commission Staff's First Request for Information to Ronald D. McGinnis
|
2016-00154
|
11/16/2016
|
20161116_PSC_ORDER.pdf
|
2016-00370
|
11/17/2016
|
20161117_PSC_ORDER.pdf
|
2016-00327
|
11/17/2016
|
20161117_PSC_ORDER.pdf
|
2016-00303
|
11/17/2016
|
20161117_PSC_ORDER.pdf
|
2016-00398
|
11/17/2016
|
20161117_PSC_ORDER.pdf
|
2016-00370
|
11/17/2016
|
20161117_PSC_ORDER.pdf
|
2016-00371
|
11/18/2016
|
PSC_ORDER
Order Entered: 1. The propose GLT tariff is suspended five months from January 1, 2017, up to and including June 1, 2017. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. Any motion to intervene filed after November 30, 2016, shall show a basis
for intervention and good cause for being untimely. If the untimely motion is granted, the movant shall accept and abide by the existing procedural schedule. 4. Motions for extensions of time with respect to the schedule herein shall be made in writing and will be granted only upon a showing of good cause. 5. Nothing contained herein shall prevent the Commission from entering further Orders in this matter.
|
2016-00383
|
11/18/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00393
|
11/18/2016
|
20161118_DATA_REQUEST.pdf
Data Request
|
2016-00345
|
11/21/2016
|
PSC_ORDER
Order Entered: 1. The motion of Henderson to compel is denied. 2. Within seven days of the date of this Order, Big Rivers shall file a response to the data request attached as an Appendix to this Order. 3. Big Rivers' motion for leave to file its surreply is granted and its surreply submitted on October 10, 2016, is accepted for filing and deemed part of the official record in this matter.
|
2016-00278
|
11/21/2016
|
PSC_ORDER
Final Order Entered: 1. The EDR special contract between East Kentucky, South Kentucky, and Kroger is approved effective December 1, 2016. 2. By March 31 of each year, East Kentucky shall file an annual report with the Commission detailing, for the prior calendar year, revenues received from Kroger and the marginal costs associated with serving Kroger throughout the term of the proposed contract. 3. During any rate proceedings by East Kentucky filed subsequent to the effective date of the proposed EDR contract with Kroger, and during a period when East Kentucky still has an active EDR contract, East Kentucky shall demonstrate through detailed cost-of-service analysis that its member distribution cooperative non-EDR ratepayers are not adversely affected by the EDR rate to Kroger and any other EDR customers that may be on the East Kentucky system at that time. 4. So long as it is providing wholesale service to one of its distribution cooperatives with an active EDR contract, East Kentucky shall file by March 31 of each year an annual report with the Commission providing, for the prior calendar year, the information shown in the Appendix to this Order. 5. Any documents filed pursuant to ordering paragraphs 2 and 4 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00316
|
11/21/2016
|
PSC_ORDER
Order Entered: Duke Kentucky's motion to suspend the hearing scheduled for December 8, 2016, is granted, subject to possible rescheduling at a later date, if necessary, upon the Commission's review of Duke Kentucky's stipulated settlement.
|
2016-00349
|
11/21/2016
|
PSC_ORDER
Order Entered: that the agreement between Grayson and
Kentucky Power authorizing Kentucky Power to serve the residence located at 340
Hanshaw Road, Olive Hill, Kentucky, is approved.
|
2016-00373
|
11/21/2016
|
PSC_ORDER
Order Entered: that the agreement between Grayson and
Kentucky Power authorizing Kentucky Power to serve 725 Coie Road, Olive Hill,
Kentucky, 41164, is approved.
|
2016-00374
|
11/21/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Duke Energy Kentucky, Inc.
|
2016-00379
|
11/21/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Duke Energy Kentucky, Inc.
|
2016-00380
|
11/21/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Columbia and set forth in the Appendix to this Order are approved for billing for the December 2016 billing cycle beginning on November 29, 2016. 2. Within 20 days of the date of this Order, Columbia shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00381
|
11/21/2016
|
PSC_ORDER
Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 7, related to the service and filing of documents. 4. Within seven days of entry of this Order, the Attorney General shall
provide the electronic mail address to which all electronic documents issued by the Commission and other parties of record may be served upon the Attorney General in accordance with 807 KAR 5:001, Section 4(8)(b).
|
2016-00383
|
11/21/2016
|
20161121_PSC_ORDER.pdf
|
2016-00378
|
11/21/2016
|
20161121_PSC_ORDER.pdf
|
2016-00370
|
11/21/2016
|
20161121_PSC_IC_NOTICE.pdf
Notice of Informal Conference
|
2016-00152
|
11/22/2016
|
PSC_ORDER
Order Entered: SBA Towers is granted a CPON to construct a wireless
telecommunications facility. The proposed facility consists of a monopole antenna
tower not to exceed 90 feet in height, with attached antennas, to be located at 4995
Buckhaven Court, Catlettsburg, Boyd County, Kentucky. The coordinates for the
proposed facility are North Latitude 38° 22' 57.88" by West Longitude 82° 39' 17.58".
2. SBA Towers shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00157
|
11/22/2016
|
PSC_ORDER
Order Entered: SBA Towers Is granted a CPCN to construct a wireless
telecommunications facility. The proposed facility consists of a monopole antenna
tower not to exceed 154 feet in height, with attached antennas, to be located at 311
South Laurel Street, Greenup, Greenup County, Kentucky. The coordinates for the
proposed facility are North Latitude 38° 34' 19.42" by West Longitude 82° 50' 27.58".
2. SBA Towers shall immediately notify the Commission in writing, if, after
the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order.
3. Any documents filed in the future pursuant to ordering paragraph 2 herein
shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00158
|
11/22/2016
|
PSC_ORDER
Final Order Entered: 1. EKPC's request for a CPCN for construction of the Community Solar Facility as described in EKPC's application is granted. 2. EKPC's request to assume evidences of indebtedness associated with the Community Solar Facility as described in EKPC's application is approved. 3. EKPC's motion to submit the case for a decision based upon the existing record is granted. 4. The proposed Wholesale Tariff is approved for service rendered on and after the date of this Order. 5. The proposed Retail Tariff Template is approved for use by EKPC Members in future retail community solar tariff filings. 6. Within 20 days of the date of this Order, EKPC shall file with this
Commission, using the commission's electronic Tariff Filing System, the Wholesale Tariff reflecting that it was approved pursuant to this Order.
7. EKPC shall file annual reports, after the Community Solar Facility is constructed, providing information on the total number of participating retail customers, the number of participating retail customers identified by Member, and a copy of marketing materials used to promote participation in the Community Solar Facility. 8. Any documents filed pursuant to ordering paragraph 7 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00269
|
11/22/2016
|
PSC_ORDER
Order Entered: The hearing scheduled for Thursday, November 29, 2016, is cancelled and shall be rescheduled, if necessary.
|
2016-00324
|
11/22/2016
|
PSC_ORDER
Order Entered: Capital Telecom and Verizon Wireless are granted a CPCN to construct a
wireless telecommunications facility. The proposed facility consists of a guyed antenna
tower not to exceed 300 feet in height, with attached antennas, to be located at 1311
Clinton Moscow Road, Fulton, Fulton County, Kentucky. The coordinates for the
proposed facility are North Latitude 36° 34' 48.4" by West Longitude 88° 58' 49.35".
2. Capital Telecom and Verizon Wireless shall file a copy of the final decision
regarding the pending KAZC application for the proposed construction within 10 days of
receiving this decision.
3. Capital Telecom and Verizon Wireless shall Immediately notify the
Commission in writing, if, after the antenna tower is built and utility service is
commenced, the tower is not used for a period of three months in the manner
authorized by this Order.
4. Any documents filed in the future pursuant to ordering paragraphs 2 and 3
herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00337
|
11/22/2016
|
PSC_ORDER
Order Entered: Morgan County's motion to amend is granted.
2. Morgan County is authorized to enter into an agreement with KRWFC to
borrow no more than $1,441,000® for the purpose of refunding the outstanding
indebtedness, but only under such terms and conditions that will produce both positive
gross savings and net present value savings.
3. If the actual terms and conditions of the agreement with KRWFC differ
from those set forth in its amended application, Morgan County shall, within 30 days of
4. Within 30 days of executing the proposed agreement, Morgan County
shall file a copy of the executed Assistance Agreement and any documents referenced
in the executed Assistance Agreement that Morgan County has not previously filed with
the Commission.
5. The proceeds from the Assistance Agreement shall be used only for the
lawful purposes specified in Morgan County's application as amended.
6. Any documents filed pursuant to ordering paragraphs 3 and 4 of this Order
shall reference the number of this case and shall be retained in the utility's general
correspondence file.
Nothing contained herein shall be construed as a finding of value for any purpose
or as a warranty on the part of the Commonwealth of Kentucky or any agency thereof
as to the securities authorized here
|
2016-00342
|
11/22/2016
|
PSC_ORDER
Final Order Entered: 1. The boundary changes as agreed upon by LG&E/KU and Shelby Energy for lots 1-9 in the Estates of Notting Hill Subdivision on Shelbyville Road, Simpsonville, Shelby County, Kentucky, are approved. 2. The boundary changes as agreed upon by LG&E/KU and Shelby Energy for lots 1-9 of Shelby Woods Subdivision located on Pounds Lane, 981 Pounds Lane, and a portion of 973 Pounds Lane, all located in Louisville, Jefferson County, Kentucky, are approved. 3. KU's request for deviation from the filing requirements of 807 KAR 5:001, Section 7(1 ), is granted.
|
2016-00358
|
11/22/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.25 per 1,000 gallons is
approved.
2. U.S. GO'S proposed rates as set forth in Appendix 8 to this Order are
approved for water service rendered by U.S. 60 on and after November 12, 2016.
3. Within 20 days of the date of this Order, U.S. 60 shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00366
|
11/22/2016
|
20161122_PSC_ORDER.pdf
|
2016-00152
|
11/23/2016
|
PSC_ORDER
Final Order Entered: 1. Southern District is granted a CPCN to proceed with the proposed construction as set forth in its application. 2. Southern District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved shall be undertaken only with the prior approval of the Commission. 4. Southern District shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best practices of the construction trades involved in the project. 5. Southern District shall file with the Commission documentation of the total costs of this project, including the cost of construction and all other capitalized costs, (e.g., engineering, legal, administrative) within 60 days of the date that construction authorized under this CPCN is substantially completed. 6. Southern District shall file a copy of the "as-built" drawings and a certified
statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the construction certificated herein.
|
2016-00294
|
11/23/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Mountain Water District
|
2016-00356
|
11/23/2016
|
20161123_PSC_ORDER.pdf
|
2016-00401
|
11/23/2016
|
20161123_DATA_REQUEST.pdf
Data Request
|
2016-00367
|
11/23/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Nolin Rural Electric Cooperative Corporation
|
2016-00367
|
11/23/2016
|
20161123_PSC_ORDER.pdf
|
2016-00382
|
11/28/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Louisville Gas and Electric Company
|
2016-00383
|
11/28/2016
|
20161128_PSC_ORDER.pdf
|
2016-00168
|
11/28/2016
|
20161128_DATA_REQUEST.pdf
Data Request
|
2016-00162
|
11/29/2016
|
PSC_ORDER
Final Order Entered: 1. KU is granted a CPCN that authorizes it to bid on a franchise offered by the city of Carlisle, Kentucky, for electric transmission and distribution service. 2. If KU is not the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a written notice stating that KU was not the successful bidder. 3. If KU is the successful bidder, KU shall, within ten days of the award of the franchise at issue, file with the Commission a copy of the executed franchise agreement and a statement disclosing the amount of the initial franchise fee. 4. If KU is the successful bidder, KU shall, within ten days of an increase or decrease in the amount of the initial franchise fee set forth in the franchise agreement, file with the Commission documentation setting forth the revised fee. 5. Any documents filed pursuant to ordering paragraphs 2, 3, or 4 of this Order shall reference the number of this case and shall be electronically submitted via the Commission's electronic Tariff Filing System. 6. This Order shall not be construed as granting a CPCN to construct utility facilities in said city.
|
2016-00403
|
11/30/2016
|
PSC_ORDER
Order Entered: EKPC's petition for confidential protection for designated materials
contained in the Crews Testimony, Bartling Testimony, and Read Testimony filed as
exhibits to EKPC's Application is granted.
2. The designated materials set forth in the Crews Testimony, Bartling
Testimony, and Read Testimony shall not be placed in the public record or made
available for public inspection for a period of ten years, or until further Orders of this
Commission.
3. Use of the materials in question in any Commission proceeding shall be in
compliance with 807 KAR 5:001, Section 13(9).
4. EKPC shall inform the Commission if the materials in question become
publicly available or no longer qualify for confidential treatment.
5. If a non-party to this proceeding requests to inspect materials granted
confidential treatment by this Order and the period during which the materials have
|
2016-00269
|
11/30/2016
|
PSC_ORDER
Final Order Entered: 1. McKinney District's proposed nonrecurring charges are denied. 2. The charges in the Appendix to this Order are approved for services rendered on and after the date of this Order. 3. Within 20 days of the date of this Order, McKinney District shall file with
the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00277
|
11/30/2016
|
PSC_ORDER
Final Order Entered: Mr. Crain's Amended Complaint shall be dismissed and this case is removed from the Commission's docket.
|
2016-00288
|
11/30/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to East Kentucky Power Cooperative, Inc. and Each of Its 16 Member Cooperatives
|
2016-00335
|
11/30/2016
|
PSC_ORDER
Final Order Entered: 1. Green River Valley is authorized to enter into an agreement with KRWFC to borrow no more than $6,429,5005 for the purpose of refunding the outstanding indebtedness, but only under such terms and conditions as will produce both positive gross savings and net present value savings. 2. If the actual terms and conditions of the agreement with KRWFC differ from those set forth in its amended application, Green River Valley shall, within 30 days of executing the loan agreement, file with the Commission amortization schedules and
work papers showing the actual gross savings and net present value savings that will result from the refinancing. 3. Within 30 days of executing the proposed agreement, Green River Valley shall file a copy of the executed Assistance Agreement and any documents referenced
in the executed Assistance Agreement that Green River Valley has not previously filed with the Commission. 4. The proceeds from the Assistance Agreement shall be used only for the lawful purposes specified in Green River Valley's application. 5. Any documents filed pursuant to ordering paragraphs 2 and 3 of this Order shall reference the number of this case and shall be retained in the utility's general correspondence file.
|
2016-00376
|
11/30/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.16 per 1,000 gallons is
approved.
2. Farmdale's proposed rates as set forth in Appendix B to this Order are
approved for water service rendered by Farmdale on and after December 1, 2016.
3. Within 20 days of the date of this Order, Farmdale shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00388
|
11/30/2016
|
20161130_PSC_ORDER.pdf
|
2016-00413
|
12/1/2016
|
PSC_ORDER
Final Order Entered: Columbia Gas's request for a limited deviation from the requirements of 807 KAR 5:022, Section 14(22)(a), for the Systems
identified by Columbia Gas in the Appendix to this Order is granted.
|
2015-00084
|
12/1/2016
|
PSC_ORDER
Order Entered: 1. This investigation is initiated to review Liberty Gas's compliance with the leakage survey requirements set forth in 49 CFR, Section 192.723(b)(1 ), and 49 CFR, Section 192.605(a). 2. a. Liberty Gas, pursuant to 807 KAR 5:001, is to file with the Commission the original and ten copies of the information requested in Appendix A to this Order. The information requested is due within 20 days of the date of this order.
b. Responses to requests for information shall be appropriately bound, tabbed and indexed, and shall include the name of the witness responsible for responding to the questions related to the information provided, with a copy to all parties of record. c. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the
response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. d. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect.
|
2016-00391
|
12/2/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Jackson Purchase Energy Corporation
|
2016-00410
|
12/2/2016
|
20161202_DATA_REQUEST.pdf
Data Request
|
2016-00169
|
12/2/2016
|
20161202_PSC_ORDER.pdf
|
2016-00054
|
12/5/2016
|
20161205_PSC_ORDER.pdf
Order Entered: 1. Cannonsburg's motion to expend $15,265 from the unaccounted-for water loss reduction plan surcharge account is denied. 2. Cannonsburg District shall continue to provide the monthly reports set forth in ordering paragraphs 8 and 9 of the J
|
2014-00267
|
12/5/2016
|
PSC_ORDER
Order Entered: 1. Beech Grove shall use the following case style on each subsequent paper filed in this case. "APPLICATION OF BEECH GROVE WATER SYSTEM, INC. FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AND TO INCUR INDEBTEDNESS OF $100,000 FOR THE PURCHASE OF METERING SYSTEM." 2. Beech Grove's request for approval of financing is amended in that its
proposal to incur indebtedness of $125,251 is now a proposal to incur indebtedness of $100,000. 3. Beech Grove's request for approval of the loan to fund the purchase of an automated metering system is continued beyond the 60-day period specified in KRS 278.300(2). 4. The information requested in the Appendix to this Order is due within 14 days of the date of this Order. Pursuant to 807 KAR 5:001, Beech Grove is to file with the Commission the original and ten copies of the information, with a copy to all parties of record. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for responding to the questions related to the information provided.
|
2016-00255
|
12/5/2016
|
PSC_ORDER
Order Entered: 1. Wood Creek's Motion is hereby denied. 2. Wood Creek commissioners Glenn Williams, chairman; Earl Bailey, secretary; and Jimmy Keller, treasurer, individually and in their respective capacities as commissioners of Wood Creek and a representative of Wood Creek Water District, shall appear at the hearing scheduled for December 13, 2016, at 9:00a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky, and be prepared to show cause why they should not be subject to the penalties prescribed in KRS 278.990 for the alleged violation of KRS 278.300. 3. Wood Creek shall file with the Commission, no later than December 8, 2016, a list of witnesses and any exhibits to be presented at the December 13, 2016 hearing. Wood Creek shall provide six copies of any exhibit it intends to introduce into evidence at the hearing. 4. Any formal proposal by Wood Creek to resolve this matter shall be
considered at the scheduled hearing.
|
2016-00338
|
12/5/2016
|
PSC_ORDER
Order Entered: 1. No later than February 22, 2017, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings and recommendations regarding Henry District's requested rate adjustment. 2. No later than 14 days after the date of the filing of the Commission Staff Report each party of record shall file with the Commission: a. Its written comments on and any objections to the findings contained in the Commission Staff Report; and b. Any additional evidence for the Commission to consider. 3. If Commission Staff finds that Henry District's financial condition supports a higher rate than Henry District proposes or the assessment of an additional rate or
charge not proposed in the Application, Henry District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or the additional rate or charge. 4. If Commission Staff finds that changes should be made to the manner in which Henry District accounts for the depreciation of Henry District's assets, Henry District in its response to the Commission Staff Report shall also state its position in writing on whether the Commission should require Henry District to implement the proposed change for accounting purposes.
|
2016-00377
|
12/5/2016
|
PSC_ORDER
Final Order Entered: 1. Cellular Services' adoption of the agreement between AT&T Kentucky and Peoples Telecom, LLC is approved as of the date of this Order. 2. This case is closed and removed from the Commission's docket.
|
2016-00387
|
12/5/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.17 per 1,000 gallons is
approved.
2. Boone District's rates proposed in the application are denied.
3. The rates as set forth in Appendix B to this Order are approved for water
service rendered by Boone District on and after December 1, 2016.
|
2016-00389
|
12/7/2016
|
PSC_ORDER
EKPC's motion for confidential protection is hereby denied.
2. Within seven days of the date of this Order, EKPC shall file a revised
version of the materials on Table 1-3 on page 1-9, Table 8-2 on page 8-9, Section
3.2.3 on page 3-6, Figure 8-1 on page 8-2, Figure 8-2 on page 8-3 of the attachment
to EKPC's response to Staff's Supplemental Request, Item 6, for which confidential
protection was denied, reflecting as underacted the information that has been denied
confidential treatment.
The materials for which EKPC request for confidential treatment has been denied shall neither be placed in the public record nor made available for
inspection for 33 days from the date of this Order in order to allow EKPC to seek a
remedy afforded by law.
|
2015-00134
|
12/7/2016
|
PSC_ORDER
Order Entered:
Big Rivers' petition for confidential protection for designated material in
Exhibit 10 to the Application is granted.
2. The materials set forth in Exhibit 10 to Big Rivers' Application shall not be
placed in the public record or made available for public inspection for a period of five
years, or until further Orders of this Commission.
3. Use of the materials in question in any Commission proceeding shall be in
compliance with 807 KAR 5:001, Section 13(9).
|
2016-00278
|
12/7/2016
|
PSC_ORDER
Order Entered: 1. No later than March 29, 2017, Commission Staff shall file with the Commission and serve upon all parties of record a written report containing its findings and recommendations regarding Sentra's requested rate adjustment. 2. No later than April 14, 2017, or 14 days after the date of the filing of the Commission Staff Report, whichever occurs earlier, each party of record shall file with the Commission: a. Its written comments on and any objections to the findings and recommendations contained in the Commission Staff Report; b. Any additional evidence for the Commission to consider. c. Written notice as to whether this matter may be submitted for a decision based upon the existing record without a hearing. 3. If Commission Staff finds that Sentra's financial condition supports a higher rate than Sentra proposes or the assessment of an additional rate or charge not proposed in Sentra's Application, Sentra, in its responses to the Commission Staff Report, shall also state its position in writing on whether the Commission should authorize the assessment of the higher rate or recommend an additional rate or charge.
4. If Commission Staff recommends changes in the manner in which Sentra accounts for the depreciation of Sentra's assets, Sentra, in its response to the Commission Staff Report, shall also state its position in writing on whether the Commission should require Sentra to implement the proposed change for accounting purposes.
|
2016-00384
|
12/7/2016
|
DATA_REQUEST
Commission Staff's Second Request for Information to Jackson Purchase Energy Corporation
|
2016-00410
|
12/7/2016
|
PSC_ORDER
Final Order Entered: 1. Kenergy's motion for an extension of time to file its policy regarding unclaimed capital credits is granted. 2. Kenergy shall file the unclaimed capital credits policy on or before December 28, 2016. The policy shall be filed as part of the post-case correspondence
in Case No. 2015-00312.
|
2016-00417
|
12/8/2016
|
DATA_REQUEST
Commission Staff's Supplemental Request for Information to Martin Gas, Inc.
|
2016-00332
|
12/9/2016
|
PSC_ORDER
Order Entered: 1. Farmers' motion for extension of time is granted. 2. Farmers' responses to the information requested in Staff's First Request
shall be filed on or before December 15, 2016.
|
2016-00365
|
12/9/2016
|
20161209_PSC_ORDER.pdf
|
2016-00360
|
12/9/2016
|
20161209_PSC_ORDER.pdf
|
2016-00361
|
12/12/2016
|
PSC_ORDER
Order Entered: This matter stands submitted for a decision based upon all evidence filed with the Commission.
|
2016-00077
|
12/12/2016
|
PSC_ORDER
Final Order Entered: 1. The proposed Agreement entered into between Big Rivers and KyMEA is approved as of the date of this Order.
2. Big Rivers shall notify the Commission within ten days of receipt of any RUS-required approvals for the proposed Agreement. 3. Any document filed in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the utility's general
correspondence file.
|
2016-00306
|
12/12/2016
|
PSC_IC_NOTICE
COMMISSION STAFF'S NOTICE OF INFORMAL CONFERENCE
|
2016-00406
|
12/12/2016
|
20161212_PSC_ORDER.pdf
|
2016-00274
|
12/12/2016
|
20161212_PSC_ORDER.pdf
|
2016-00180
|
12/13/2016
|
PSC_ORDER
Order Entered: 1. Farmers' proposed rates are suspended for five months from December 15, 2016, up to and including May 14, 2017. 2. The procedural schedule set forth in the Appendix to this Order, which is attached hereto and incorporated herein, shall be followed. 3. a. Responses to requests for information shall be appropriately bound, tabbed and indexed and shall include the name of the witness responsible for
responding to questions related to the information provided, with copies to all parties of record and ten copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a
governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.
|
2016-00365
|
12/13/2016
|
20161213_DATA_REQUEST.pdf
Data Request
|
2016-00152
|
12/13/2016
|
20161213_PSC_ORDER.pdf
|
2016-00370
|
12/13/2016
|
20161213_PSC_ORDER.pdf
|
2016-00371
|
12/14/2016
|
PSC_ORDER
Final Order Entered: 1. The Stipulation is adopted and approved in its entirety as a complete resolution of all issues in this case. 2. LG&E is assessed a civil penalty in the amount of $2,500. 3. LG&E shall pay the amount of $2,500 within 30 days of the date of this Order by cashier's check or money order made payable to the Kentucky State Treasurer, and to be mailed or delivered to the Public Service Commission, Office of
General Counsel, 211 Sower Boulevard, P.O. Box 615, Frankfort, KY 40602. 4. Upon the payment of $2,500 by LG&E, this case shall be closed and removed from the Commission's docket without further Order of the Commission.
|
2016-00264
|
12/14/2016
|
PSC_ORDER
Final Order Entered: 1. The Stipulation is adopted and approved in its entirety as a complete resolution of all issues in this case. 2. As a result of the July 12, 2014 incident, Kentucky Power agrees to pay a civil penalty, pursuant to KRS 278.990, in the amount of $3,000. 3. Upon payment of $3,000 by Kentucky Power, this case shall be closed and removed from the Commission's docket without further Order of the Commission.
|
2016-00279
|
12/14/2016
|
PSC_ORDER
Final Order Entered: Frontier shall provide gas service to the Church on and after the date of this Order pursuant to the rates in Frontier's filed
Residential and Small Commercial tariff.
|
2016-00287
|
12/14/2016
|
PSC_ORDER
Order Entered: 1. The AG's motion to file his Initial Request out of time and to withdraw his motion to set a procedural schedule is granted.
2. LG&E shall have four additional days to respond to the AG's Initial Request, up to and including December 16, 2016. 3. The procedural schedule established by our November 18, 2016 Order is amended consistent with the above provisions, and as set forth in the Appendix to this
Order. 4. Nothing contained herein shall prevent the Commission from entering further Orders in this matter.
|
2016-00383
|
12/14/2016
|
PSC_ORDER
Order Entered: LG&E is authorized to establish a regulatory asset of $9,409 million.
2. The regulatory asset account established in this proceeding is for accounting
purposes only.
3. The amount of the regulatory asset authorized herein that is to be considered for
recovery in rates in Case No. 2016-00371 is $9,409 million based on the actual termination
payment due to Bank of America as a result of the interest rate swap termination.
|
2016-00393
|
12/14/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Martin and set forth in the Appendix to this Order are approved for service rendered by Martin on and after January 1, 2017. 2. Within 20 days of the date of this Order, Martin shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00402
|
12/14/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.18 per 1,000 gallons is
approved.
2. Southern Madison's proposed rates as set forth in Appendix B to this
Order are approved for water service rendered by Southern Madison on and after
November 10, 2016.
3. Within 20 days of the date of this Order, Southern Madison shall file with
the Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00404
|
12/14/2016
|
PSC_ORDER
Final Order Entered: 1. Total Call's request to withdraw as an ETC is granted as of December 31, 2016. 2. Total Call's request to cancel its authority to operate in Kentucky is granted as of December 31, 2016. 3. This case is now closed and removed from the Commission's docket.
|
2016-00418
|
12/14/2016
|
20161214_PSC_ORDER.pdf
|
2016-00360
|
12/14/2016
|
20161214_PSC_ORDER.pdf
|
2016-00361
|
12/15/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00290
|
12/15/2016
|
DATA_REQUEST
Commission Staff's Post-Hearing Request for Information to Wood Creek Water District
|
2016-00338
|
12/15/2016
|
PSC_ORDER
Order Entered, nunc pro tunc, that: 1. The December 5, 2016 Order is corrected to include the Appendix B attached to this Order. 2. All other provisions of the December 5, 2016 Order shall remain in full force and effect.
|
2016-00389
|
12/15/2016
|
PSC_ORDER
Final Order Entered: 1. The rate as proposed by Bluegrass and set forth in the Appendix to this Order is approved for service rendered on and after January 1, 2017. 2. Within 20 days of the date of this Order, Bluegrass shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rate approved herein and reflecting that it was approved pursuant to this Order.
|
2016-00396
|
12/15/2016
|
PSC_ORDER
Order Entered: Coalfields Is granted deviation from 807 KAR 5:001, Sections 12(1)(a) and
(2)(i), to the extent that the income statements and balance sheets do not need to cover
a 12-month period.
2. Coalfields' Application is deemed filed from the date of this Order.
|
2016-00397
|
12/15/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Burkesville and set forth in the Appendix to this Order are approved for service rendered by Burkesville on and after December 27, 2016. 2. Within 20 days of the date of this Order, Burkesville shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved
pursuant to this Order.
|
2016-00399
|
12/15/2016
|
PSC_ORDER
Order Entered: The rate proposed by Natural Energy and set forth in the Appendix to this
Order is approved for service rendered by Natural Energy on and after January 1, 2017.
2. Within 20 days of the date of this Order, Natural Energy shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00414
|
12/15/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Citipower are denied. 2. The rates set forth in the Appendix to this Order are approved for service
rendered by Citipower on and after January 1, 2017. 3. In Citipower's future GCR rate applications, Citipower shall use the correct EGC approved by the Commission to be in effect for the months reconciled through the AA mechanism. 4. In Citipower's next GCR rate application for rates effective April 1, 2017, Citipower shall calculate its current quarter BA using the expired ACA and BA from Case No. 2015-00396. 5. Citipower shall submit all invoices received from Citigas and Citizens Gas as part of all future GCR filings. 6. Within 20 days of the date of this Order, Citipower shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00416
|
12/15/2016
|
20161215_PSC_ORDER.pdf
|
2016-00411
|
12/16/2016
|
20161216_PSC_ORDER.pdf
Order Entered: 1. A hearing tor the purpose of taking evidence on the deficiencies identified in the Commission's December 12, 2014 Inspection Report, Martin District's compliance with the Required Action plan set forth in Appendix A of the Commission's Ap
|
2016-00142
|
12/16/2016
|
PSC_ORDER
Final Order Entered: 1. The ASAP rates proposed by Duke Kentucky in its application are denied. 2. The ASAP rates in the Appendix to this Order are approved effective for Duke Kentucky's first January 2017 billing cycle. 3. Within 20 days of the date of this Order, Duke Kentucky shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00228
|
12/16/2016
|
PSC_ORDER
Final Order Entered: 1. Duke Kentucky is authorized to obtain long-term debt in an aggregate amount not to exceed $200 million as set forth in its application for the period ending December 31, 2018. 2. Duke Kentucky is authorized to borrow from Boone County, Kentucky, or another authorized issuer of tax-exempt bonds in the Commonwealth of Kentucky, for a term not to exceed 50 years, the proceeds of up to a maximum of $76.72 million aggregate principal amount of Authority Bonds that may be issued in one or more series, for the period ending December 31, 2018. 3. Duke Kentucky is authorized to continue to classify $25 million of Utility Money Pool Agreement borrowings as long-term debt if it deems it prudent to do so. 4. Duke Kentucky is authorized to use interest rate management techniques and to enter into interest rate management agreements as will reduce its overall interest costs. Further, in the event Duke Kentucky enters into an interest rate management agreement, a copy of the agreement shall be provided to the Commission within 30 days of its execution. 5. The proceeds from the transactions authorized herein shall be used only for the lawful purposes set out in the application. 6. Duke Kentucky shall agree to only such terms and prices as are
consistent with this Order.
|
2016-00379
|
12/16/2016
|
PSC_ORDER
Final Order Entered: 1. Duke Kentucky is authorized to enter into Capital Leases of up to $25 million in one or more transactions through December 31, 2018. 2. Duke Kentucky shall agree only to terms and prices that are consistent with the parameters set out in its application.
3. Duke Kentucky shall, within ten days after entering into a Capital Lease, file with the Commission a statement setting forth the starting date and period of the lease, a description of the property, the name and address of the lessor, the dollar amount of the lease, any stated or implied interest rate, all fees and expenses included if the lease, and a copy of any participation agreements. In addition, Duke Kentucky shall perform an analysis comparing the cost of financing through Capital Leases to that of other forms of debt financing for any Capital Lease in excess of $1 million. The analysis and supporting data should be retained as documentation for establishing ratepayer benefits from Capital Leases during future rate proceedings. 4. The proceeds from the transactions authorized herein shall be used only for the lawful purposes set out in the application.
|
2016-00380
|
12/16/2016
|
PSC_ORDER
Order Entered: The rate proposed by Valley Gas is denied.
2. The rate set forth in the Appendix to this Order is approved for service
rendered on and after January 1, 2017.
3. Within 20 days of the date of this Order, Valley Gas shall file with this
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets setting out the rate approved herein and reflecting that it was approved pursuant
to this Order.
|
2016-00405
|
12/19/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2016-00328
|
12/19/2016
|
PSC_ORDER
Order Entered: The motion of the Attorney General to intervene is granted.
|
2016-00356
|
12/19/2016
|
PSC_ORDER01
Order Entered: Mountain District's application for approval to enter into an assistance
agreement with the Kentucky Infrastructure Authority ("KIA") for financing a portion of
the project for which a CPCN is sought is continued beyond the 60-day period specified
in KRS 278.300(2).
2. The procedural schedule set forth in the Appendix to this Order shall be
followed.
3. Unless there is a timely filed request for a hearing or informal conference,
the matter shall be submitted for a decision.
4. Any party filing a paper with the Commission shall file an original and ten
copies. The original and copies shall be appropriately bound, tabbed and Indexed.
5. a. Responses to requests for information shall be appropriately
bound, tabbed and indexed and shall include the name of the witness responsible for
|
2016-00356
|
12/19/2016
|
PSC_ORDER
Order Entered: 1. Nolin R.E.C.C.'s motion to utilize paper filing procedures is granted. 2. The Commission's Order entered October 21, 2016, is amended to the extent that from today forward this case shall be processed utilizing paper filing procedures. 3. The style of this case is revised to remove the reference to "Electronic."
|
2016-00367
|
12/19/2016
|
20161219_DATA_REQUEST.pdf
Data Request
|
2016-00336
|
12/19/2016
|
20161219_PSC_ORDER.pdf
|
2016-00370
|
12/20/2016
|
PSC_ORDER
Final Order Entered: 1. Breathitt District is granted a CPCN to proceed with the proposed construction as set forth in its application. 2. Breathitt District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved by this Order shall be undertaken only with the prior approval of the Commission. 4. Breathitt District shall require construction to be inspected under the general supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the
best practices of the construction trades involved in the project. 5. Breathitt District shall file with the Commission documentation of the total
costs of this project, including the cost of construction and all other capitalized costs, (e.g., engineering, legal, and administrative) within 60 days from the date that construction authorized under this CPCN is substantially completed. 6. Breathitt District shall file a copy of the "as-built" drawings and a certified statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days 1rom the substantial completion of the construction certificated herein.
|
2016-00407
|
12/20/2016
|
PSC_ORDER
Final Order Entered: 1. The rates proposed by Millennium and set forth in the Appendix to this Order are approved for service rendered on and after January 1, 2017. 2. Within 20 days of the date of this Order, Millennium shall file with this Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets setting out the rates approved herein and reflecting that they were approved pursuant to this Order.
|
2016-00408
|
12/20/2016
|
20161220_PSC_ORDER.pdf
|
2016-00370
|
12/20/2016
|
20161220_PSC_ORDER01.pdf
|
2016-00370
|
12/20/2016
|
20161220_PSC_ORDER.pdf
|
2016-00371
|
12/20/2016
|
20161220_PSC_ORDER01.pdf
|
2016-00371
|
12/20/2016
|
20161220_PSC_ORDER02.pdf
|
2016-00371
|
12/20/2016
|
20161220_PSC_ORDER03.pdf
|
2016-00371
|
12/20/2016
|
20161220_PSC_ORDER04.pdf
|
2016-00371
|
12/20/2016
|
20161220_PSC_ORDER.pdf
|
2016-00059
|
12/21/2016
|
PSC_IC_NOTICE
Commission Staff's Notice of Informal Conference
|
2015-00358
|
12/21/2016
|
PSC_ORDER
Order Entered: 1. Mr. McGinnis' request for an extension of time is granted through December 19, 2016. 2. The response filed by Mr. McGinnis on December 19, 2016, is accepted for filing as of that date.
|
2016-00154
|
12/21/2016
|
PSC_ORDER
Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of an antenna tower not to exceed 270 feet in height, with attached antennas, and to be located at 80 Doe Ridge Road, Bedford, Trimble County, Kentucky. The coordinates for the proposed facility are North Latitude 38° 32' 51 .33" by West Longitude 85° 19' 40.19". 2. AT&T Mobility shall immediately notify the Commission in writing, if, after the antenna tower is built and utility service is commenced, the tower is not used for a
period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2
herein shall reference this case number and shall be retained in the utility's general correspondence file.
|
2016-00372
|
12/21/2016
|
PSC_ORDER
Final Order Entered: 1. Jackson Purchase is authorized to borrow from CFC up to $18,844,470.27, but no more than the total amount needed to pay off the RUS notes proposed to be refinanced as identified in the application. The loan maturity date and interest rate shall be in accordance with the CFC refinancing program as described in Jackson Purchase's application. 2. Jackson Purchase shall execute the CFC loan documents as authorized herein. 3. Jackson Purchase shall comply with all matters set out in finding paragraphs 3 through 6 as if they were individually so ordered.
|
2016-00410
|
12/21/2016
|
PSC_ORDER
Final Order Entered: 1. Sentra's request to withdraw its GCR rate application is granted. 2. This case is closed and removed from the Commission's docket.
|
2016-00419
|
12/21/2016
|
DATA_REQUEST
Commission Staff's First Request for Information to Shelby Energy Cooperative, Inc.
|
2016-00434
|
12/21/2016
|
20161221_PSC_ORDER.pdf
|
2016-00345
|
12/22/2016
|
PSC_ORDER
Order Entered: 1. The Companies' request for an extension of time is granted. 2. The Companies' responses to Staff's Post-Hearing Request shall be filed with the Commission on or before January 17, 2017.
|
2015-00367
|
12/22/2016
|
PSC_ORDER
Order Entered: 1. Clark Energy's June 27, 2016 and September 1, 2016 petitions for confidential treatment are denied. 2. Within seven days of the date of this Order, Clark Energy shall file revised pages reflecting as unredacted the information that has been denied confidential treatment.
3. The materials denied confidential treatment shall be withheld from public inspection for 20 days from the date of this Order to allow Clark Energy to seek any remedy afforded by law.
|
2016-00220
|
12/22/2016
|
PSC_ORDER01
Final Order Entered: 1. Clark Energy's request for a CPCN to purchase and install an AMI system as described in its application is approved.
2. Within 90 days of the issuance of this Order, Clark Energy shall file a summary detailing how it intends to implement the types of programs, such as pre-pay metering, dynamic pricing, direct load control, and any other energy efficiency or demand-side management programs, that Clark Energy would be able to develop and offer to its customers as a result of implementing the new AMI system. Clark Energy shall include in this summary a timeline of when it anticipates it would be able to make those program offerings to its customers.
|
2016-00220
|
12/22/2016
|
PSC_ORDER
Final Order Entered: 1 . North Mercer is granted a CPCN to proceed with the proposed purchase and renovation as set forth in its application.
2. Any deviation from the purchase and renovation as approved shall be undertaken only with the prior approval of the Commission. 3. North Mercer shall file with the Commission documentation of the total costs of this project, including the cost of renovation and all other capitalized costs, (e.g. engineering, legal, administrative) within 60 days of the date that the purchase and renovation authorized under this CPCN is substantially completed. Renovation costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for water utilities prescribed by the Commission. 4. If "as built" drawings are prepared for the proposed renovations of the building, North Mercer shall file a copy of the drawings and a certified statement that the renovation has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the renovation certificated herein. 5. Any documents filed pursuant to ordering paragraphs 4 & 5 shall reference this case number and shall be retained in the utility's general
correspondence file. 6. Within 30 days following the first anniversary date of this Order, North Mercer shall file a report that describes and documents the utilization of the office and headquarters that it is replacing through this proposal.
|
2016-00392
|
12/22/2016
|
PSC_ORDER
Final Order Entered: 1. The purchased water adjustment factor of $0.17 per 1 ,000 gallons is approved. 2. The rates proposed by Cannonsburg are denied. 3. The rates as set forth in Appendix B to this Order are approved for water service rendered by Cannonsburg on and after January 1, 2017. 4. Within 20 days of the date of this Order, Cannonsburg shall file with the Commission, using the Commission's electronic Tariff Filing System, revised tariff sheets showing the rates approved herein.
|
2016-00415
|
12/22/2016
|
PSC_ORDER
Order Entered: The purchased water adjustment factor of $0.13 per 1,000 gallons is
approved.
2. Simpson County's proposed rates, as set forth in Appendix B to this
Order, are approved for water service rendered by Simpson County on and after
January 1, 2017.
3. Within 20 days of the date of this Order, Simpson County shall file with the
Commission, using the Commission's electronic Tariff Filing System, revised tariff
sheets showing the rates approved herein.
|
2016-00420
|
12/22/2016
|
20161222_PSC_ORDER.pdf
|
2016-00398
|
12/22/2016
|
20161222_PSC_ORDER.pdf
|
2016-00162
|
12/27/2016
|
20161227_PSC_ORDER.pdf
|
2016-00371
|
12/27/2016
|
20161227_PSC_ORDER01.pdf
|
2016-00371
|
12/27/2016
|
20161227_PSC_ORDER.pdf
|
2016-00370
|
12/27/2016
|
20161227_PSC_ORDER01.pdf
|
2016-00370
|
12/27/2016
|
20161227_PSC_ORDER.pdf
|
2016-00401
|
12/27/2016
|
20161227_PSC_ORDER01.pdf
|
2016-00401
|
12/27/2016
|
20161227_DATA_REQUEST.pdf
Data Request
|
2016-00382
|
12/27/2016
|
20161227_PSC_ORDER.pdf
|
2016-00325
|
12/28/2016
|
PSC_ORDER
Final Order Entered: 1. The 2016 Water Personnel Training Seminar, which the Commission conducted at its offices in Frankfort, Kentucky, on December 6-7, 2016, is approved for a maximum of 12 credit hours of water district management training and for a maximum of 12 credit hours of new water district commissioner training. 2. Within 20 days of the date of this Order, Commission Staff shall file into the post case referenced correspondence file for this case a list of the names of each attendee, his or her water district, and the number of hours that he or she attended this training program.
|
2016-00284
|
12/29/2016
|
20161229_PSC_ORDER.pdf
|
2016-00281
|
12/29/2016
|
20161229_PSC_ORDER.pdf
|
2016-00401
|