View Case Filings for: 2018-00292
Service Type:Electric
Filing Date:8/24/2018
Category:Regular
Utilities:
East Kentucky Power Cooperative, Inc.
Case Nature:
Backup Fuel Facilities at Bluegrass Generating Station
Case Filings | |
---|---|
Filing | Documents |
2/3/2022 2:12:00 PM
Order Entered: 1. EKPC’s motion for confidential treatment is granted. 2. The designated material granted confidential treatment by this Order shall not be placed in the public record or made available for public inspection for an indefinite period or until further order of this Commission. |
|
12/5/2019 8:59:51 AM
Final Order Entered: 1. This case is opened to address certain outstanding petitions for confidential treatment. 2. The petitions for confidential treatment listed in Appendix B to this Order are granted. 3. The granting of these petitions shall not be cited as precedent in other proceedings before the Commission. 4. All movants shall review the petitions to determine if the material for which confidential treatment was requested still warrants confidential treatment. 5. A movant shall inform the Commission in writing, and filed in the original case file, if it determines that the information contained in a petition that is granted by this Order no longer warrants confidential treatment. 6. The Commission shall make available for inspection, upon request, any materials that a movant determines no longer warrants confidential treatment. 7. This case is closed and removed from the Commission's docket. |
|
2/28/2019 2:20:08 PM
Final Order Entered: 1. EKPC's request for a CPCN to construct a fuel oil system at its Bluegrass Station is granted. 2. EKPC's request for a deviation from 807 KAR 5:001, Section 15(2)(d)(2) is granted. 3. EKPC shall file "as-built" drawings or plans within 60 days of completion of the construction authorized by this Order. 4. Any documents filed in the future pursuant to ordering paragraph 3 shall reference this case number and shall be retained in the post-case correspondence file. 5. This case is hereby closed and will be removed from the Commission's docket. |
|
2/1/2019 9:01:23 AM
Order Entered: 1. EKPC's August 24, 2018 motion for confidential treatment is granted. 2. The designated materials for which EKPC seeks confidential treatment shall not be placed in the public record or made available for public inspection for an indefinite period or until further Orders of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. EKPC shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run , then EKPC shall have 30 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If EKPC is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the requested materials available for inspection for 30 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow EKPC to seek a remedy afforded by law. |
|
1/9/2019
East Kentucky Power Cooperative, Inc. Motion to Submit Case for Adjudication on the Administrative Record |
|
11/26/2018
East Kentucky Power Cooperative, Inc. Response to Staff's Second Request for Information |
|
11/7/2018 9:53:27 AM
Commission Staff's Second Request for Information to East Kentucky Power Cooperative, Inc. |
|
10/26/2018
East Kentucky Power Cooperative, Inc. Response to Staff First Request for Information and Motion for Confidential Treatment |
|
10/11/2018 11:34:50 AM
Commission Staff's First Request for Information to East Kentucky Power Cooperative, Inc. |
|
9/10/2018 3:06:56 PM
Order Entered: 1. The procedural schedule set forth in the Appendix to this Order shall be followed. 2. a. Responses to requests for information shall be appropriately bound, tabbed, and indexed and shall include the name of the witness who will be responsible for responding to questions related to the information provided, with copies to all parties of record, and the original and six copies to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information, which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information that party shall provide a written explanation of the specific grounds for its failure to respond completely and precisely. e. Careful attention should be given to copied material to ensure that it is legible. |
|
9/4/2018 3:44:23 PM
No Deficiency Letter |
|
8/27/2018 11:09:16 AM
Acknowledge Receipt of Filing |
|
8/24/2018
EKPC Application for a CPC&N for the Construction of Backup Fuel Facilities at Its Bluegrass Generating Station, Motion for Confidentiality, and Motion to Deviate from Filing Requirements |