Kentucky Public Service Commission


View Case Filings for: 2018-00005


Case Number:2018-00005
Service Type:Gas & Electric
Filing Date:1/11/2018
Category:Regular
Utilities:

Kentucky Utilities Company , Louisville Gas and Electric Company


Electronic Case
Case Nature:

Advanced Metering Systems (AMS)









Case Filings
FilingDocuments
10/10/2019 11:28:06 AM

Order Entered: 1. LG&E/KU's April 13, 2018, and July 31 , 2018, petitions for confidential protection are granted. 2. The designated materials shall not be placed in the public record or made available for public inspection for five years, or until further Orders of this Commission. 3. Use of the designated materials in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. LG&E/KU shall inform the Commission if the designated materials become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect the designated materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not expired, LG&E/KU shall have 30 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If LG&E/KU are unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the designated materials available for inspection for 30 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow LG&E/KU to seek a remedy afforded by law.


8/30/2018 11:00:44 AM

Final Order Entered: 1. The Companies' joint request for CPCNs to install AMS is denied without prejudice. 2. The Companies' joint request to deviate from 807 KAR 5:006, Section 14(3), 807 KAR 5:006, Sections 26(4)(e) and 26(5)(a)(2), 807 KAR 5:041, Sections 15(3) and 16, and 807 KAR 5:006, Section 19, is denied as moot. 3. The Companies' proposed AMS opt-out tariffs are denied as moot.


8/13/2018 10:45:32 AM

KIUC correspondence advising the Commission that it has elected to NOT file a Brief


Michael L. Kurtz Kentucky Industrial Utility Customers, Inc. (KIUC)

8/10/2018 9:39:48 PM

Post-Hearing Brief of Metropolitan Housing Coalition


Tom FitzGerald Metropolitan Housing Coalition

Metro_Housing_Coalition_Post-Hearing_Brief.pdf

(Post-Hearing Brief of Metropolitan Housing Coalition)

Read_First_8.pdf

(Read First)

8/10/2018 5:20:57 PM

Attorney Generals Post-Hearing Brief


Kent A Chandler Kentucky Office of the Attorney General

Case_No._2018-00005_-_AGs_Post-Hearing_Brief.pdf

Attorney General's Post-Hearing Brief

8/10/2018 4:37:49 PM

Post Hearing Brief of Association of Community Ministries


Lisa Kilkelly Association of Community Ministries

ACM_Post_Hearing_Brief_08102018.pdf

Association of Community Ministries Post Hearing Brief

ACM_Read1st_08102018.pdf

Read First Cover Letter

8/10/2018 2:36:28 PM

Post Hearing Brief of Louisville Gas Electric and Kentucky Utilities Company


W. Duncan Crosby III Louisville Gas Electric and Kentucky Utilities Company

KU-LGE_Read1st_8-10-18.pdf

Transmittal Letter

8/10/2018 2:05:10 PM

CACs Post Hearing Brief


Iris G.Skidmore Community Action Council for Lexington-Fayette, Bourbon, Harrison, and Nicholas Counties, Inc.

CAC_read1st_081018.pdf-Read_1st_document_for_CACs_Post_Hearing_Brief.pdf

Read 1st cover letter for CAC's Post Hearing Brief

8/1/2018 12:35:42 PM

20180801_PSC Notice of Filing.pdf


7/31/2018 5:18:04 PM

Responses of LGE to the Metropolitan Housing Coalitions Post-Hearing Requests for Information and questions asked MHC during the July 24, 2018 public hearing. The filing also includes a Petition for Confidential Protection.


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

1_-_Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

2_-_LGE_KU_Responses_to_MHC_Hearing_and_Post-Hearing_Requests-Redacted.pdf

Responses to MHC Hearing and Post-Hearing Requests

3_-_LGE-KU_Jt_Ptn_for_Confidential_Protection.pdf

Joint Petition for Confidential Protection

7/31/2018 5:03:26 PM

Responses of LGE and KU to the Commission Staffs Post-Hearing Requests for Information and to questions asked by the Commission during the July 24, 2018 public hearing. The filing also includes a Petition for Confidential Protection.


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

1_-_Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

2_-_LGE_KU_Responses_to_PSCHearing_and_Post-Hearing_Requests.pdf

LG&E and KU Responses to PSC Hearing and Post-Hearing Requests

3_-_2018_PSC_PHDR_Attach_to_Q1_-_Attachment_1.xlsx

Attachment 1 to PSC PHDR Question No. 1

4_-_2018_PSC_PHDR_Attach_to_Q1_-_Attachment_2.xlsx

Attachment 2 to PSC PHDR Question No. 2

5_-_LGE-KU_Jt_Ptn_for_Confidential_Protection.pdf

Joint Petition for Confidential Protection

7/26/2018 11:34:42 PM

Post-Hearing Data Request of Metropolitan Housing Coalition to Louisville Gas and Electric Company


Tom FitzGerald Metropolitan Housing Coalition

MHC_Post_Hearing_Data_Requests_To_LGE.pdf

(Post-Hearing Data Request of Metropolitan Housing Coalition to Louisville Gas and Electric Company)

ReadFirst7.pdf

(Read First)

7/26/2018 3:16:38 PM

Data Request


7/25/2018 2:31:10 PM

Order Entered: 1. Post-hearing data requests shall be filed in the record on or before Thursday, July 26, 2018. 2. Responses to post-hearing data requests shall be filed in the record on or before Tuesday, July 31, 2018. 3. Post-hearing briefs by all parties shall be filed on or before August 10, 2018. 4. This case shall stand submitted for decision by the commission effective 12:01 a.m., Eastern Daylight Time, on August 11, 2018.


7/19/2018 4:17:12 PM

LGE and KU file the Notarized Proof of Publication, list of newspapers, and the notice of public hearing


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

01_-_Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

02_-_Notice_of_Public_Hearing.pdf

Notice of Public Hearing

7/10/2018 3:23:12 PM

20180710_PSC Memo Filing Minutes.pdf


7/6/2018 7:44:02 AM

LGE and KU Hearing Notice Request and Preparation Documents


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

LGE_KU_Publication_Request.pdf

LG&E and KU Hearing Notice Publication Request

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

7/3/2018 11:11:26 AM

LGE-KU Informational Update Filing


W. Duncan Crosby III of Stoll Keenon Ogden PLLC Louisville Gas and Electric Company and Kentucky Utilities Company

6/27/2018 3:15:55 PM

Rep. McKenzie Cantrell Public Comment


6/18/2018 11:10:51 AM

Verification page of John P. Malloy for Rebuttal Testimony filed on June 15, 2018


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

Verification_Page-Malloy.pdf

Verification Page - Malloy

6/15/2018 12:42:37 PM

Rebuttal Testimony of John P. Malloy for LGE and KU


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

Rebuttal_Testimony-Malloy.pdf

LG&E and KU Rebuttal Testimony

6/11/2018

Rep. Attica Scott Request for Public Hearing


6/8/2018 4:09:06 PM

Attorney Generals Responses to Data Requests from LGE/KU and Commission Staff, Corrected Testimony and Witness Affidavit


Kent A Chandler Kentucky Office of the Attorney General

AG_Response_to_Companies_1st_Set_Case_No._2018-00005.pdf

Attorney General's Response to LG&E/KU's Initial Data Request

AG_Response_to_Staff_1st_Set_Case_No._2018-00005.pdf

Attorney General's Responses to Commission Staff Initial Data Requests

Alvarez_Corrected_Testimony_Case_No._2018-00005_(Mark-up).pdf

Corrected Testimony of Paul J. Alvarez (Mark-up)

Case_No._2018-00005_Affidavit_of_Paul_J._Alvarez.pdf

Affidavit of Witness Paul J. Alvarez

6/8/2018 2:21:32 PM

Response of Association of Community Ministries to Commission Staffs Initial Request for Information


Lisa Kilkelly Association of Community Ministries

ACM_Read1st_06082018.pdf

Read 1st Cover Letter

ACM_Response_to_Commission_Staff_Initial_Request_for_Information.pdf

ACM Response to Commission Staff Initial Request for Information

6/6/2018 3:31:30 PM

CACs Response to Commission Staffs Initial Request for Information, Verification, and Read 1st Cover Letter


Iris G. Skidmore Community Action Council for Lexington-Fayette, Bourbon, Harrison, and Nicholas Counties, Inc.

CAC_R_CSDR1_060618.pdf-CAC_Response_to_Commission_Staff_Initial_Request_for_Information.pdf

CAC's Response to Commission Staff's Initial Request for Information

CAC_V_060618.pdf-Verification_of_Malcolm_J._Ratchford.pdf

Verification affidavit of Malcolm J. Ratchford

6/5/2018 4:23:15 PM

Response to Commission Initial Data Requests to Metropolitan Housing Coalition, Read first letter, and Exhibit A


Tom FitzGerald Metropolitan Housing Coalition

Exhibit_A_To_MHC_Response_To_Commission_Data_Request.pdf

(Exhibit A To MHC Response To Commission Initial Request For Information)

Hinko_affidavit_for_answer_to_Commission_Staffs_Requests_June_2018.pdf

(Hinko Affidavit Accompanying Responses To Commission Staff's Initial Requests for Information)

MHC_Response_to_Commission_Staffs_Initial_Request_for_Information_(2).pdf

(Metropolitan Housing Coalition Response To Commission Staff's Initial Request For Information)

ReadFirst6.pdf

(Read First)

5/29/2018 2:25:13 PM

Data Request


5/29/2018 2:22:05 PM

Data Request


5/29/2018 2:18:52 PM

Data Request


5/29/2018 2:17:42 PM

Data Request


5/29/2018 11:42:17 AM

LGE-KU Data Request to Attorney General


W. Duncan Crosby III of Stoll Keenon Ogden PLLC Louisville Gas and Electric Company and Kentucky Utilities Company

5/18/2018 5:07:54 PM

The Attorney Generals Direct Testimony


Justin M. McNeil Office of the Attorney General

2018-00005_AG_Alvarez_Direct_Testimony_Read1st_5-18-2018.pdf

The AG's Read1st File re: Direct Testimony

2018-00005_Direct_Testimony_of_Paul_J._Alvarez.pdf

The Direct Testimony of Paul J. Alvarez

5/18/2018 3:57:35 PM

Direct Testimony of Michael Ashabraner


Lisa Kilkelly Association of Community Ministries

ACM_Read1st_05182018.pdf

Read 1st Cover Letter

ACM_Testimony_Michael_Ashabraner_05182018.pdf

Direct Testimony of Michael Ashabraner on behalf of ACM

5/18/2018 1:32:38 PM

Refiled Direct Testimony of Malcolm J. Ratchford, Verification, and Read 1st document


Iris G. Skidmore Community Action Council for Lexington-Fayette, Bourbon, Harrison, and Nicholas Counties, Inc.

CAC_read1st_051818.pdf-read_1st_document_for_Direct_Testimony_of_Malcolm_J._Ratchford.pdf

Read 1st document for refiling of Direct Testimony of Malcolm J. Ratchford

5/18/2018 8:33:56 AM

Direct Testimony of Malcolm J. Ratchford, Verification, and Read 1st cover letter.


Iris G. Skidmore Community Action Council for Lexington-Fayette, Bourbon, Harrison, and Nicholas Counties, Inc.

5/17/2018 11:24:49 PM

Affidavit to Accompany Direct Testimony of Cathy Hinko, Executive Director, Metropolitan Housing Coalition


Tom FitzGerald Metropolitan Housing Coalition

Hinko_affidavit_for_testimony_signed_May_16_2018.pdf

(Affidavit of Cathy Hinko to Accompany Direct testimony filed in case)

5/17/2018 11:11:16 PM

Direct Testimony of Cathy Hinko, Executive Director, Metropolitan Housing Coalition


Tom FitzGerald Metropolitan Housing Coalition

Hinko_testimony_2018-00005.pdf

(Direct Testimony of Cathy Hinko, Executive Director, Metropolitan Housing Coalition)

HinkoDirectTestimonyExhibit1Example_from_EvictionLab.pdf

(Exhibit 1 to Direct Testimony of Cathy Hinko)

HinkoDirectTestimonyExhibit2Cricket_phone_plans_May_2018.pdf

(Exhibit 2 to Direct Testimony of Cathy Hinko)

HinkoDirectTestimonyExhibit3CaliforniaPrivacyOrder.PDF

(Exhibit 3 to Direct Testimony of Cathy Hinko)

ReadFirst5.pdf

(Read First)

5/11/2018 7:28:11 AM

LGE and KU Responses to Association of Community Ministries, Inc.’s Second Requests for Information


Derek A Rahn Louisville Gas and Electric Company and Kentucky Utilities Company

1_-_Read_1st-Cover_Letter.pdf

READ FIRST - LG&E and KU Filing Letter

2_-_LGE_KU_Response_to_ACM_2nd_DR.pdf

LG&E and KU Response to ACM 2nd Data Request

5/11/2018 7:22:29 AM

LGE and KU Responses to Metropolitan Housing Coalitions Supplemental Data Requests for Information


Derek A Rahn Louisville Gas and Electric Company and Kentucky Utilities Company

1_-_Read_1st-Cover_Letter.pdf

READ FIRST - LG&E and KU Filing Letter

2_-_LGE_KU_Response_to_MHC_2nd_DR.pdf

LG&E and KU Responses to MHC 2nd Data Request

5/11/2018 7:19:01 AM

LGE and KU Responses to Attorney Generals Supplemental Request for Information


Derek A Rahn Louisville Gas and Electric Company and Kentucky Utilities Company

1_-_Read_1st-Cover_Letter.pdf

READ FIRST - LG&E and KU Filing Letter

10_-_2018_AG_DR2_Attach_to_Q12b_-_CEM_-_Meters_-_LGE.xlsx

Attachment to AG 2-12b – LGE Meters

11_-_2018_AG_DR2_Attach_to_Q12b_-_CEM_-_Meters_-_KU.xlsx

Attachment to AG 2-12b – KU Meters

12_-_2018_AG_DR2_Attach_to_Q12b_-_CEM_-_Summary.xlsx

Attachment to AG 2-12b – Summary

13_-_2018_AG_DR2_Attach_to_Q12d_-_CEM_-_IT_Systems.xlsx

Attachment to AG 2-12d – IT Systems

14_-_2018_AG_DR2_Attach_to_Q12d_-_CEM_-_Network.xlsx

Attachment to AG 2-12d – Network

15_-_2018_AG_DR2_Attach_to_Q12d_-_CEM_-_Meters_-_LGE.xlsx

Attachment to AG 2-12d – LGE Meters

16_-_2018_AG_DR2_Attach_to_Q12d_-_CEM_-_Meters_-_KU.xlsx

Attachment to AG 2-12d – KU Meters

17_-_2018_AG_DR2_Attach_to_Q12d_-_CEM_-_Summary.xlsx

Attachment to AG 2-12d – Summary

18_-_2018_AG_DR2_Attach_to_Q12e_-_CEM_-_IT_Systems.xlsx

Attachment to AG 2-12e – IT Systems

19_-_2018_AG_DR2_Attach_to_Q12e_-_CEM_-_Network.xlsx

Attachment to AG 2-12e – Network

2_-_LGE_KU_Responses_to_AG_2nd_DR.pdf

LG&E and KU Response to AG 2nd Data Request

20_-_2018_AG_DR2_Attach_to_Q12e_-_CEM_-_Meters_-_LGE.xlsx

Attachment to AG 2-12e – LGE Meters

21_-_2018_AG_DR2_Attach_to_Q12e_-_CEM_-_Meters_-_KU.xlsx

Attachment to AG 2-12e – KU Meters

22_-_2018_AG_DR2_Attach_to_Q12e_-_CEM_-_Summary.xlsx

Attachment to AG 2-12e – Summary

3_-_2018_AG_DR2_Attach_to_Q12a_-_CEM_-_IT_Systems.xlsx

Attachment to AG 2-12a – IT Systems

4_-_2018_AG_DR2_Attach_to_Q12a_-_CEM_-_Network.xlsx

Attachment to AG 2-12a – Network

5_-_2018_AG_DR2_Attach_to_Q12a_-_CEM_-_Meters_-_LGE.xlsx

Attachment to AG 2-12a – LGE Meters

6_-_2018_AG_DR2_Attach_to_Q12a_-_CEM_-_Meters_-_KU.xlsx

Attachment to AG 2-12a – KU Meters

7_-_2018_AG_DR2_Attach_to_Q12a_-_CEM_-_Summary.xlsx

Attachment to AG 2-12a – Summary

8_-_2018_AG_DR2_Attach_to_Q12b_-_CEM_-_IT_Systems.xlsx

Attachment to AG 2-12b – IT Systems

9_-_2018_AG_DR2_Attach_to_Q12b_-_CEM_-_Network.xlsx

Attachment to AG 2-12b – Network

5/11/2018 7:10:11 AM

LGE and KU Responses to Commission Staff’s Second Request for Information


Derek A Rahn Louisville Gas and Electric Company and Kentucky Utilities Company

1_-_Read_1st-Cover_Letter.pdf

READ FIRST - LG&E and KU Filing Letter

2_-_LGE_KU_Responses_to_PSC_2nd_DR.pdf

LG&E and KU Responses to PSC 2nd Data Request

4/27/2018 7:32:36 PM

Metropolitan Housing Coalition Supplemental Data Requests to Louisville Gas and Electric Company


Tom FitzGerald Metropolitan Housing Coalition

Metro_Housing_Coalition_Supplemental_Data_Requests_to_LGE.pdf

(Metropolitan Housing Coalition Supplemental Data Requests to LG&E)

ReadFirst4.pdf

(Read First)

4/27/2018 3:50:02 PM

Attorney Generals Supplemental DRs


Kent A. Chandler Kentucky Office of the Attorney General

Read_1st_Case_No._2018-00005_AG_DR_2.pdf

AG's Read1st Supplemental DRs

4/27/2018 1:48:49 PM

ACM Second Requests for Information


Lisa Kilkelly Association of Community Ministries

ACM_Read1st_04272018.pdf

ACM Read 1st Cover Letter

4/26/2018 11:52:40 AM

Data Request


4/24/2018 12:37:39 PM

Order Entered: 1. A hearing in this matter shall be held on Tuesday, July 24, 2018, at 9 a.m. Eastern Daylight Time, at the offices of the Public Service Commission at 211 Sower Boulevard, Frankfort, Kentucky. 2. Louisville Gas and Electric Company ("LG&E") and Kentucky Utilities Company ("KU") (jointly "LG&E/KU") shall give notice of the hearing in compliance with 807 KAR 5:001, Section 9(2)(b). In addition, the notice of hearing shall include the following statement: "This hearing will be streamed live and may be viewed on the PSC website, psc.ky.gov." At the time the notice is mailed or publication is requested, LG&E/KU shall forward a duplicate of the notice and request to the Commission. 3. Pursuant to KRS 278.360 and 807 KAR 5:001, Section 9(9), a digital video transcript shall be made of the hearing.


4/13/2018 2:56:59 PM

Responses of LGE and KU to the Metropolitan Housing Coalitions First Set of Data Requests


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

LGE_KU_Responses_to_MHC_1st_DR.pdf

LG&E and KU Responses to MHC's First Set of Data Requests

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

4/13/2018 2:52:00 PM

Responses of LGE and KU to the Community Action Councils Initial Requests for Information


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

20180413_KU_LGE_Response_to_CAC_1st_DR.pdf

LG&E and KU Responses to CAC's Initial Requests for Information

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

4/13/2018 2:47:55 PM

Responses of LGE and KU to the Association of Community Ministries First Requests for Information


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

LGE_KU_Response_to_ACM_1st_DR.pdf

LG&E and KU Responses to ACM's First Request for Information

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

4/13/2018 2:42:20 PM

Responses of LGE and KU to the Attorney Generals Initial Data Requests and a Joint Petition for Confidential Protection


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

2018_AG_DR1_Attach_to_Q21a-b.xlsx

Attachment to AG 1-21 a-b

LGE-KU_Jt_Ptn_for_Confidential_Protection_for_AG_34.pdf

LG&E and KU Petition for Confidential Protection

LGE_KU_Response_to_AG_1st_DR.pdf

LG&E and KU Responses to AG's Initial Data Requests

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

4/13/2018 2:35:22 PM

Responses of LGE and KU to the Commission Staffs First Request for Information


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

LGE_KU_Responses_to_PSC_1st_DR.pdf

LG&E and KU Responses to PSC Staff's First Req for Information

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

4/2/2018 5:08:50 PM

First Set of Data Requests of Metropolitan Housing Coalition to Louisville Gas and Electric Company


Tom FitzGerald Metropolitan Housing Coalition

MHCFirstSetOfDataRequestsToLGE.pdf

(First Set of Data Requests of Metropolitan Housing Coalition to Louisville Gas and Electric Company)

ReadFirst3.pdf

(Read First)

4/2/2018 4:24:38 PM

Attorney Generals Initial Data Requests


LW Cook Office of the Attorney General

Case_No._2018-00005_AG_DR_1.pdf

Attorney General's Initial Data Requests

4/2/2018 12:41:42 PM

ACM First Requests for Information


Lisa Kilkelly Association of Community Ministries

ACM_Read1st_04022018.pdf

Read First Cover Letter

4/2/2018 12:16:35 PM

Data Request


4/2/2018 8:09:32 AM

CACs Initial Requests for Information and Read 1st letter


Iris G. Skidmore Community Action Council for Lexington-Fayette, Bourbon, Harrison, and Nicholas Counties, Inc.

3/6/2018 11:58:24 AM

Order Entered; 1. The amended procedural schedule set forth in the Appendix to the Order shall be followed. 2. All provisions of the January 26, 2018 Order that are not in conflict with the terms of this Order shall remain in effect.


3/1/2018 3:23:22 PM

Order Entered: KU/LG&E's joint petition to deviate from the Commission's notice requirements set forth in 807 KAR 5:011, Section 8(2)(b)(3) is granted.


2/22/2018 2:22:52 PM

KU and LGE files a Certificate of Completed Notice and a Petition for Approval to Deviate from Rule


Rick E. Lovekamp Kentucky Utilities Company and Louisville Gas and Electric Company

01_-_Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

02_-_Certificate_of_Completed_Notice.pdf

Certificate of Completed Notice

03_-_Petition_to_Deviate.pdf

Petition to Deviate from Rule

2/18/2018 6:18:01 PM

Statement Regarding Receipt Of Electronic Transmissions


Tom FitzGerald Metropolitan Housing Coalition

MHCStatementReElectronicTransmissions.pdf

(Metropolitan Housing Coalition Statement Regarding Receipt of Electronic Transmissions)

ReadFirst2.pdf

(Read First)

2/15/2018 12:35:52 PM

CACs Written Statement and Read 1st letter


Iris G. Skidmore Community Action Council for Lexington-Fayette, Bourbon, Harrison, and Nicholas Counties, Inc.

CAC_read1st_021518.pdf-read_1st_document_for_CACs_Written_Statement.pdf

Read 1st cover letter for CAC's Written Statement

2/15/2018 10:43:30 AM

Statement Regarding Receipt of Electronic Transmissions


Eileen Ordover Association of Community Ministries

ACM_Statement_Regarding_Electronic_Transmissions.pdf

ACM Statement Regarding Receipt of Electronic Transmissions

2/14/2018 10:31:18 AM

Order Entered: 1. The motion of CAC to intervene is granted. 2. CAC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. CAC shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. CAC shall adhere to the procedural schedule set forth in the Commission's January 26, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9) , within seven days of entry of this Order, CAC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


2/14/2018 10:23:18 AM

Order Entered: 1. The motion of MHC to intervene is granted. 2. MHC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. MHC shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. MHC shall adhere to the procedural schedule set forth in the Commission's January 26, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, MHC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


2/14/2018 10:10:25 AM

Order Entered: 1. The motion of ACM to intervene is granted. 2. ACM shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. ACM shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. ACM shall adhere to the procedural schedule set forth in the Commission's January 26, 2018 Order and as amended by subsequent Orders. 5. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, ACM shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


2/12/2018 1:12:02 PM

Order Entered: 1. The Attorney General's Motion for a Procedural Schedule is denied as moot. 2. The Attorney General's Motion to Amend the Procedural Schedule is granted. 3. The procedural schedule established on January 26, 2018, is suspended until further Order by the Commission.


2/2/2018 12:28:14 PM

Attorney Generals Reply in Support of the AGs Motion to Amend the Procedural Schedule


Kent A Chandler Kentucky Office of the Attorney General

2/1/2018 3:30:53 PM

LGE-KU Response to AGs Motion to Amend Procedural Schedule


W. Duncan Crosby III Louisville Gas and Electric Company and Kentucky Utilities Company

LGE-KU_Read1st_Cover_Letter_2-1-2018.pdf

LGE-KU Read1st Cover Letter 2-1-2018

LGE-KU_Response_to_AG_Motion_to_Amend_Procedural_Schedule_2-1-2018.pdf

LGE-KU Reponse to AG's Motion to Amend Procedural Schedule 2-1-2018

1/31/2018 4:48:17 PM

Kentucky Industrial Utility Customers, Inc. (KIUC) Written Statement in Response to the Commissions Order of Procedure


Michael L. Kurtz, Esq. Kentucky Industrial Utility Customers, Inc. (KIUC)

Cover_Ltr__2018-00005_(2).pdf

Cover Ltr - Read 1st

1/31/2018 2:16:20 PM

Motion to Intervene


Lisa Kilkelly Association of Community Ministries

ACM_Motion_to_Intervene1312018.pdf

Association of Community Ministries Motion to Intervene

ACM_Read1st_1312018.pdf

Read 1st Cover Letter

1/30/2018 1:17:02 PM

Attorney Generals Motion to Amend the Procedural Schedule


Kent A Chandler Kentucky Office of the Attorney General

2018-00005_AGs_Motion_to_Amend_Procedural_Schedule.pdf

Motion to Amend the Procedural Schedule

1/30/2018 12:40:08 PM

Order Entered: 1. The motion of KIUC to intervene is granted. 2. KIUC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. KIUC shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, KIUC shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


1/30/2018 10:54:53 AM

LGE and KU Informational Update Filing for the Electric and Gas Advanced Metering Systems Business Case to reflect the Tax Cuts and Jobs Act of 2017.


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

Verified_Informational_Update.pdf

LG&E and KU Verified Informational Update

1/26/2018 9:07:39 AM

Order Entered: 1. KU and LG&E's proposed tariffs are suspended for five months, up to and including July 8, 2018. 2. The procedural schedule set forth in the Appendix to this Order shall be followed. 3. a. Responses to requests for information in paper medium shall be appropriately bound, tabbed, and indexed and shall include the name of the witness responsible for responding to questions related to the information provided, with the original and an electronic version to the Commission. b. Each response shall be answered under oath or, for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. Any party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond. e. Careful attention should be given to copied material to ensure that it is legible.


1/25/2018 11:56:56 AM

Attorney Generals Motion for a Procedural Schedule


Kent A Chandler Kentucky Office of the Attorney General

1/23/2018 3:55:19 PM

Motion to Intervene and Read 1st Document


Iris G. Skidmore Community Action Council for Lexington-Fayette, Bourbon, Harrison, and Nicholas Counties, Inc.

CAC_read1st_012318.pdf-read_1st_document_for_CACs_Motion_to_Intervene.pdf

Read 1st cover letter for CAC's Motion to Intervene

1/22/2018 2:35:26 PM

Motion for Full Intervention


Tom FitzGerald Metropolitan Housing Coalition

MHCInterventionAMS2018-00005.pdf

(Motion of Metropolitan Housing Coalition for Full Intervention)

ReadFirst1.pdf

(Read First)

1/19/2018 4:28:22 PM

The Attorney Generals Email Service Response to Commissions Order


Justin M. McNeil Office of the Attorney General

2018-5_AG_Email_Service_Response.pdf

The AG's Email Service Response

2018-5_AG_Email_Service_Response_Read_1st_1-19-2018.pdf

The AG's Read1st File re: Email Service Response

1/19/2018 4:19:06 PM

Kentucky Industrial Utility Customers, Inc. (KIUC) Motion to Intervene


MIchael L. Kurtz, Esq. Kentucky Industrial Utility Customers, Inc. (KIUC)

Cover_Ltr__2018-00005.pdf

Cover Ltr - Read 1st

KIUC_Intervention__2018-00005.pdf

KIUC Motion to Intervene

1/19/2018 8:21:03 AM

20180119_PSC No Deficiency Letter.pdf


1/12/2018 12:21:05 PM

Order Entered: 1. The motion of the Attorney General to intervene is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, the Attorney General shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


1/10/2018 5:22:17 PM

The Attorney Generals Motion to Intervene


Justin M. McNeil Office of the Attorney General

2018-5_AG_Motion_to_Intervene.pdf

AG's Motion to Intervene

2018-5_AG_MTI_Read_1st_1-10-2018.pdf

AG's Read1st File re: Motion to Intervene

1/10/2018 2:29:57 PM

LGE and KU filing pursuant to KRS 278.285 a Joint Application seeking approval of an order granting LGE and KU Certificates of Public Convenience and Necessity for the full deployment of Advanced Metering Systems across the Kentucky service territories, in


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Application.pdf

LG&E and KU Joint Application

LGE_KU_Testimony_and_Exhibits.pdf

LG&E and KU Testimony and Exhibits

Read_1st-Cover_Letter.pdf

Read 1st - Cover Letter

1/4/2018 8:35:55 AM

Order Entered: 1. All future correspondence or filings in connection with this case shall reference the above case number. 2. All documents submitted in this proceeding shall comply with the Commission’s rules of procedure as set forth in 807 KAR 5:001 and any deviation from these rules shall be submitted in writing to the Commission for consideration. 3. Any party filing a paper shall upload an electronic version using the Commission's E-Filing System and shall file an original and six copies in paper medium, except that only two copies in paper medium shall be filed of maps, plans, specifications, and drawings pursuant to 807 KAR 5:001, Section 15(2)(d). 4. Any request for confidential treatment of material submitted shall conform to the requirements in 807 KAR 5:001(13). 5. Materials submitted to the Commission which do not comply with the rules of procedure or that do not have an approved deviation are subject to rejection pursuant to 807 KAR 5:001, Section 3.


1/3/2018 4:04:32 PM

20180103_PSC Acknowledgement Letter.pdf


1/3/2018

LGE and KU Notice of Intent to File Joint Application for a Certificate of Public Convenience and Necessity for Full Deployment of Advanced Metering Systems Using Electronic Filing Procedures


20180103_Louisville Gas and Electric Company and Kentucky Utilities Company Notice of Intent and Election.pdf

Louisville Gas and Electric Company and Kentucky Utilities Company Notice of Intent and Election