View Case Filings for: 2014-00020
Service Type:Water
Filing Date:2/4/2014
Category:Regular
Utilities:
Columbia/Adair Utilities District
Case Nature:
APPLICATION OF THE ADAIR COUNTY WATER DISTRICT FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A WATER IMPROVEMENTS PROJECT AND TO ISSUE SECURITIES IN THE APPROXIMATE AMOUNT OF $1,085,000 TO FINANCE SAID PROJECT PURSUANT TO KRS 278.020 AND 278.300
Case Filings | |
---|---|
Filing | Documents |
3/4/2014 2:42:15 PM
Order Entered: Adair District is granted a CPCN to proceed with the proposed construction as set forth in the plans and specifications filed with the Commission in this case. 2. Adair District shall notify the Commission prior to performing any additional construction not expressly authorized by this Order. 3. Any deviation from the construction approved shall be undertaken only with the prior approval of the Commission. 4. Adair District shall file with the Commission documentation of the total costs of this project including the cost of construction and all other capitalized costs, (e.g., engineering, legal, administrative) within 60 days of the date that construction is substantially completed. Construction costs shall be classified into appropriate plant accounts in accordance with the Uniform System of Accounts for water utilities prescribed by the Commission. 5. Adair District shall file a copy of the "as-built" drawings and a certified statement that the construction has been satisfactorily completed in accordance with the contract plans and specifications within 60 days of the substantial completion of the construction certificated herein. 6. Adair District shall require construction to be inspected under the gen eral supervision of a licensed professional engineer with a Kentucky registration in civil or mechanical engineering, to ensure that the construction work is done in accordance with the contract drawings and specifications and in conformance with the best |
|
2/20/2014
Adair County Water District dba Columbia Adair Utilities District's Response to PSC Staff's First Request for Information |
|
2/20/2014
Adair County Water District dba Columbia/Adair Utilities District's Amended Application |
|
2/19/2014 3:12:51 PM
Memorandum dated 2/19/2014 for Informal Conference of 2/14/2014; Comments, if any, due within five days of receipt |
|
2/14/2014 11:13:44 AM
COMMISSION STAFF'S NOTICE OF TELEPHONIC INFORMAL CONFERENCE |
|
2/12/2014 10:50:55 AM
COMMISSION STAFF'S FIRST REQUEST FOR INFORMATION TO ADAIR COUNTY WATER DISTRICT |
|
2/12/2014
Adair County Water District dba Columbia Adair Utilities District Notice of Correction to Application |
|
2/4/2014 12:59:24 PM
Order Entered; Adair County's motion to deviate from 807 KAR 5:001, Section 12, is granted. Adair County's application is considered filed as of the date of this Order. 3. Nothing contained in this Order shall preclude the Commission from requiring the production of information regarding Adair County's financial condition or operations since December 31, 2012. |
|
1/30/2014
Columbia Adair Utilities District's Downtown Water System Replacements Specifications and Contract Documents |
|
1/22/2014 11:10:57 AM
Acknowledge Receipt of Filing |
|
1/22/2014
APPLICATION OF THE ADAIR COUNTY WATER DISTRICT FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A WATER IMPROVEMENTS PROJECT AND TO ISSUE SECURITIES IN THE APPROXIMATE AMOUNT OF $1,085,000 TO FINANCE SAID PROJECT PURSUANT TO KRS 278.020 AND 278.300 |