Kentucky Public Service Commission


View Case Filings for: 2014-00002


Case Number:2014-00002
Service Type:Gas & Electric
Filing Date:1/17/2014
Category:Regular
Utilities:

Kentucky Utilities Company , Louisville Gas and Electric Company


Electronic Case
Case Nature:

JOINT APPLICATION OF LOUISVILLE GAS & ELECTRIC COMPANY AND KENTUCKY UTILITIES COMPANY FOR CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY FOR THE CONSTRUCTION OF A COMBINED CYCLE COMBUSTION TURBINE AT THE GREEN RIVER GENERATING STATION AND A SOLAR PHOTOVOLTAIC FACILITY AT THE E.W. BROWN GENERATING STATION









Case Filings
FilingDocuments
12/5/2019 8:59:51 AM

Final Order Entered: 1. This case is opened to address certain outstanding petitions for confidential treatment. 2. The petitions for confidential treatment listed in Appendix B to this Order are granted. 3. The granting of these petitions shall not be cited as precedent in other proceedings before the Commission. 4. All movants shall review the petitions to determine if the material for which confidential treatment was requested still warrants confidential treatment. 5. A movant shall inform the Commission in writing, and filed in the original case file, if it determines that the information contained in a petition that is granted by this Order no longer warrants confidential treatment. 6. The Commission shall make available for inspection, upon request, any materials that a movant determines no longer warrants confidential treatment. 7. This case is closed and removed from the Commission's docket.


8/26/2019 2:37:26 PM

Order Entered: 1. LG&E/KU's March 27, 2014 petition for confidential protection is granted in part and denied in part. 2. LG&E/KU's request for confidential treatment for an indefinite period for the designated material pertaining to its infrastructure information is granted. 3. LG&E/KU's request for confidential treatment for the remaining materials for which confidentiality was requested for a five-year period is denied as moot. 4. The designated materials for which confidentiality was granted shall not be placed in the public record or made available for public inspection for an indefinite period, or until further Orders of this Commission. 5. Use of the designated materials pertaining to the designated materials for which confidentiality was granted in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 6. LG&E/KU shall inform the Commission if the designated materials for which confidentiality was granted become publicly available or no longer qualify for confidential treatment.


8/13/2019 1:19:48 PM

Order Entered: 1. LG&E/KU's January 17, 2014 petition for confidential protection is granted. 2. The designated materials shall not be placed in the public record or made available for an indefinite period, or until further Orders of this Commission. 3. Use of the designated materials in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. LG&E/KU shall inform the Commission if the designated materials become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect the designated materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not expired, LG&E/KU shall have 30 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If LG&E/KU is unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. 6. The Commission shall not make the designated materials available for inspection for 30 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow LG&E/KU to seek a remedy afforded by law.


4/21/2015 2:57:24 PM

Order Entered: 1. Movants' Petition for Confidential Protection is hereby granted. 2. The materials contained in LG&E-KU's responses to the Attorney General's Third Request for Information, Items 2 and 6, and Kentucky Industrial Utility Customers' Third Request for Information, Item 1(a), are hereby granted confidential protection and will not be placed in the public record or made available for public inspection for a period of five years from the date of this Order, or upon further Orders of this Commission. 3. Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). 4. Movants shall inform the Commission if the materials granted confidential protection become publicly available or no longer qualify for confidential treatment. 5. If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, Movants shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If Movants are unable to make such demonstration, the requested materials shall be made available for Inspection. Otherwise, the Commission shall deny the request for Inspection.


12/19/2014 4:34:36 PM

Final Order Entered: (1) The Joint Applicants' request for a CPCN to construct the Brown Solar Facility is granted. (2)The Stipulation filed on October 1, 2014 is approved, including, but not limited to, those provisions of the Stipulation that require: a. The Joint Applicants to use their competitive bidding process for all significant aspects of construction including the award of one or more engineering, procurement, and construction contracts; and b. The Joint Applicants, in future rate proceedings, to allocate the revenues and costs associated with the Brown Solar Facility consistent with the Joint Applicants' jurisdictional Separation Study and cost-of-service principles.


12/15/2014 11:06:57 AM

20141215_PSC_Notice of Filing.pdf


12/8/2014 11:03:32 AM

LGE and KU Responses to Commission Staffs Post Hearing Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

LGE_KU_Response_to_KPSC_Post_Hearing_DRs.pdf

LG&E and KU Responses to KPSC Staff's Post Hearing Req for Infor

Read_1st.pdf

Read 1st - Cover Letter

11/21/2014 9:32:10 AM

Notarized Affidavit-Notice of Public Hearing and Petition for Approval to Deviate from Rule


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

10/6/2014 11:13:01 AM

Order Entered: A hearing in this matter shall be held on Monday, November 24, 2014, at 10:00 a.m. Eastern Standard Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. 2. The official record of these proceedings shall be by video only. 3. Louisville Gas & Electric Company and Kentucky Utilities Company shall publish notice of the scheduled hearing in accordance with 807 KAR 5:001, Section 9(2). 4. Any request to cancel or postpone this hearing shall be made by motion filed with the Commission at least one week before the hearing is scheduled to commence.


10/1/2014 1:42:44 PM

Joint Motion for Consideration and Approval of Agreement, Stipulation and Recommendation


Lindsey W. Ingram III KU and LGE

Agreement.pdf

Agreement, Stipulation and Recommendation

Joint_Motion.pdf

Joint Motion

Ltr_Derouen.pdf

Cover Letter/Read1st

10/1/2014 11:58:47 AM

Order Entered: (1) LG&E and KU's Joint Petition for Confidential Treatment is hereby granted. (2) The materials for which LG&E and KU seeks confidential treatment shall not be placed in the public record or made available for public inspection for a five-year period from the date of this Order, or until further Orders of this Commission. (3) Use of the materials in question in any Commission proceeding shall be in compliance with 807 KAR 5:001, Section 13(9). (4) LG&E and KU shall inform the Commission if the materials in question become publicly available or no longer qualify for confidential treatment. (5) If a non-party to this proceeding requests to inspect materials granted confidential treatment by this Order and the period during which the materials have been granted confidential treatment has not run, then LG&E and KU shall have 20 days from receipt of written notice of the request to demonstrate that the materials still fall within the exclusions from disclosure requirements established in KRS 61.878. If LG&E and KU are unable to make such demonstration, the requested materials shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection. (6) The Commission shall not make the requested materials available for inspection for 20 days following an Order finding that the materials no longer qualify for confidential treatment in order to allow LG&E and KU to seek a remedy afforded by law.


9/19/2014 11:45:48 AM

LGE and KU Joint Petition for Confidential Protection


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Petition_for_Confidential_Protection.pdf

Joint Petition for Confidential Protection

Read_1st.pdf

Read 1st - Cover Letter

9/19/2014 11:41:20 AM

LGE and KU responses to KIUCs Third Set of Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

KIUC_3rd_DRs_Final.pdf

LG&E and KU Responses to KIUC's 3rd Set of Data Requests

Read_1st.pdf

Read 1st - Cover Letter

9/19/2014 11:33:07 AM

LGE and KU responses o the Attorney Generals Third Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

AG_3rd_DRs_Final-Redacted.pdf

LG&E and KU Responses to AG's 3rd Data Requests

Read_1st.pdf

Read 1st - Cover Letter

9/19/2014 11:27:35 AM

LGE and KU responses to Commission Staffs Third Request for Information


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

PSC_3rd_DRs_Final.pdf

LG&E and KU Response to KPSC 3rd Req for Infor

Read_1st.pdf

Read 1st - Cover Letter

9/9/2014 12:02:53 PM

20140909_PSC_IC Memo.pdf


9/5/2014 4:20:12 PM

Data Request


9/5/2014 12:48:34 PM

OAGs Third Request for Information from LGE/KU


Gregory T. Dutton Office of the Attorney General

Third_Set_of_RFI_for_PPL_FINAL.pdf

Third Request for Information

9/5/2014 12:26:00 PM

Kentucky Industrial Utility Customers, Inc.s Third Set of Data Requests to Louisville Gas Electric Co. and Kentucky Utilities Company


Michael L. Kurtz Kentucky Industrial Utility Customers

KIUC_3rd_Set_DR_to_LGE__KU,__2014-00002.pdf

KIUC 3rd Set of Data Requests to KU and LGE

Read_1st_-_Cover_Ltr__2014-00002.pdf

Read first - Cover letter

8/29/2014 4:13:34 PM

20140829_PSC_Letter Regarding Richard Raff Participation.pdf


8/29/2014 3:37:04 PM

Order Entered: Joint Applicants' notice of withdrawal is granted and the January 17, 2014 Joint Application shall be treated as amended to remove the CPCN request for the Green River NGCC. 2. The investigation of the request for a CPCN to construct a 10-MW solar photovoltaic facility at the E.W. Brown Generating Station is resumed and the procedural schedule set forth in the appendix, which is attached hereto and incorporated herein, to this Order shall be followed.


8/22/2014 11:51:34 AM

Supplemental testimony and exhibits of Mr. Sinclair and Petition for Confidential Protection


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

8/22/2014 11:48:06 AM

LGE and KU Notice of Withdrawal of CPCN for 700 MW Green River Generating Station


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Read_1st_Cover_Letter_Motion.pdf

Read 1st - Cover Letter

8/15/2014 2:18:42 PM

Order Entered: Joint Movants' motion to extend the abeyance of the procedural schedule is granted.


8/14/2014 1:39:22 PM

20140814_PSC_IC Memo.pdf


8/4/2014 2:41:39 PM

Joint Applicants Motion to Extend Abeyance of Procedural Schedule


Lindsey W. Ingram III Joint Applicants

Motion_to_Extend_Abeyance.pdf

Motion to Extend Abeyance of Procedural Schedule

7/18/2014 1:48:40 PM

Order Entered: The Informal Conference currently scheduled for August 7, 2014 at 1100 a.m. shall be rescheduled to August 12, 2014 at 10:00 a.m. in Hearing Room 2 at the Commission's offices at 211 Sower Blvd., Frankfort, Kentucky


5/5/2014 2:34:33 PM

Order Entered: 1. Applicants' Motion to Hold Procedural Schedule in Abeyance is granted. 2. The current procedural schedule as established by the February 6, 2014 Order shall be held in abeyance for a period of 90 days from the date of this Order. 3. The hearing scheduled to begin on July 8, 2014, pursuant to the March 7, 2014 Order, shall be cancelled and rescheduled, if necessary, after the conclusion of the abeyance period. 4. An informal conference shall be scheduled on Thursday, August 7, 2014, at 11:00 a.m. Eastern Daylight Time, in Conference Room 2 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky.


4/30/2014 1:42:40 PM

Motion to Hold Procedural Schedule in Abeyance


Lindsey W. Ingram III KU and LGE

4/28/2014 10:27:51 AM

LGE and KU files an attachment to the supplemental response to KIUC Question 1-1(e).


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Attachment_to_Supplement_Response_to_KIUC_1-1(e).pdf

Attachment to 4-24-14 Supplemental Response to KIUC 1-1(e)

Read_1st.pdf

Read 1st - Cover Letter

4/25/2014 12:41:00 PM

Order Entered: Bluegrass Generation's motion for rehearing and reconsideration is denied.


4/25/2014 10:33:38 AM

LGE and KU filing of a supplement to David S. Sinclairs Testimony, Exhibit DSS-1, Appendix A


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Read_1st.pdf

Read 1st - Cover Letter

Sinclair_Supplement_DSS-1_Appendix_A.pdf

Exhibit DSS-1, Appendix A Supplement

4/24/2014 4:08:07 PM

LGE and KU Supplemental Response to KIUCs First Set of Data Requests, Question No. 1(e)


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

KIUC_1-1_Supplemental_Response.pdf

LG&E and KU Supplemental Response to KIUC 1-1(e)

Read_1st.pdf

Read 1st - Cover Letter

4/24/2014 11:37:51 AM

LGE and KU responses to Wallace McMullen and Sierra Clubs Second Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Attachment_to_SC_2-11__1.xlsx

Attachment to SC 2-11 #1

Attachment_to_SC_2-11__2.xlsx

Attachment to SC 2-11 #2

Attachment_to_SC_2-11__3.xlsx

Attachment to SC 2-11 #3

Attachment_to_SC_2-11__4.xls

Attachment to SC 2-11 #4

Attachment_to_SC_2-11__5.xls

Attachment to SC 2-11 #5

Attachment_to_SC_2-11__6.xls

Attachment to SC 2-11 #6

Read_1st.pdf

Read 1st - Cover Letter

Sierra_Club_2nd_DR_FINAL_REDACTED.pdf

LG&E and KU Responses to Sierra Club's 2nd Data Request

4/24/2014 11:32:45 AM

LGE and KU Joint Motion for Deviation


Rick E. Lovekamp Louisville Gas and Electric Company

Motion_for_Deviation.pdf

Joint Motion for Deviation

Read_1st.pdf

Read 1st - Cover Letter

4/24/2014 11:30:30 AM

LGE and KU Joint Petition for Confidential Protection


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Petition_for_Confidential_Protection.pdf

Joint Petition for Confidential Protection

Read_1st.pdf

Read 1st - Cover Letter

4/24/2014 11:26:46 AM

LGE and KU responses to KIUCs Second Set of Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

KIUC_2nd_DRs_FINAL_REDACTED.pdf

LG&E and KU Responses to KIUC's 2nd Set of Data Requests

Read_1st.pdf

Read 1st - Cover Letter

4/24/2014 11:21:00 AM

LGE and KU responses to AGs Supplemental Requests for Information


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

AG_2nd_DRs_FINAL_REDACTED.pdf

LG&E and KU Responses to AG's Supplemental Requests for Information

Attachment_to_AG_2-40.xlsx

Attachment to AG 2-40

Read_1st.pdf

Read 1st - Cover Letter

4/24/2014 11:14:54 AM

LGE and KU responses to Commission Staffs Second Information Request


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

KPSC_2nd_DRs_FINAL_REDACTED.pdf

LG&E and KU Responses to PSC 2nd Information Request

Read_1st.pdf

Read 1st - Cover Letter

4/21/2014 12:55:35 PM

Motion to Admit Kristin Henry Pro Hac Vice


Joe F. Childers Wallace McMullen and Sierra Club

4/14/2014 3:02:09 PM

Joint Applicants Response to Bluegrass Motion for Rehearing


Lindsey W. Ingram III KU LGE

4/11/2014 5:24:12 PM

Wallace McMullens and Sierra Clubs Corrected Supplemental Data Requests to Companies


Joe F. Childers Wallace McMullen and Sierra Club

SC_CORSUPDR_041114.pdf

Wallace McMullen's and Sierra Club's Corrected Supplemental Data Requests to LG&E and KU PUBLIC VERSION

4/11/2014 2:05:32 PM

Order Entered: Shannon W. Fisk is admitted pro hac vice for the purpose of representing Sierra Club in the above-styled proceeding, provided that Joe Childers or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.


4/11/2014 1:57:17 PM

Order Entered: Susan Laureign Williams is admitted pro hac vice for the purpose of representing Sierra Club in the above-styled proceeding, provided that Joe Childers or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.


4/11/2014 11:17:16 AM

Order Entered: Matthew E. Gerhart is admitted pro hac vice for the purpose of representing Sierra Club in the above-styled proceeding, provided that Joe Childers or another member of the Kentucky Bar Association acts as co-counsel and is present at any and all proceedings before this Commission.


4/10/2014 3:45:23 PM

Wallace McMullens and Sierra Clubs Supplemental Data Requests


Joe F. Childers Wallace McMullen and Sierra Club

SC_SUPPDR_041014.pdf

Wallace McMullen's and Sierra Club's Supplemental Data Requests to LG&E and KU PUBLIC VERSION

4/10/2014 3:34:49 PM

KIUCs 2nd Set of Data Requests to Kentucky Utilities Company and Louisville Gas Electric Company


Michael L. Kurtz Kentucky Industrial Utility Customers

KIUC_2nd_Set_DR_to_LGE-KU.pdf

KIUC 2nd Set of Data Requests to KU and LGE

4/10/2014 3:07:04 PM

Data Request


4/10/2014 1:33:39 PM

Supplemental Requests for Information


Gregory T. Dutton Office of the Attorney General

OAG_Instructions_to_Supplemental__Requests_for_Information__LGE_and_KU_2014-00002.pdf

Instructions to AG's Supplemental Requests for Information

4/7/2014 12:09:26 PM

Intervention rehearing motion


John N. Hughes Bluegrass Generation Company LLC

4/4/2014 5:29:38 PM

Public Comments of Big Rivers Electric Corporation


James M. Miller, Counsel Big Rivers Electric Corporation

4/1/2014 1:51:58 PM

LGE and KU Supplemental Attachment to Response to Wallace McMullen and Sierra Clubs Initial Data Request No. 1.18(a)


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Read_1st.pdf

Read 1st - Cover Letter

4/1/2014 11:07:30 AM

Motion to Admit Susan Laureign Williams Pro Hac Vice


Joe F. Childers Wallace McMullen and Sierra Club

4/1/2014 10:47:15 AM

Motions to Admit Shannon Fisk and Matthew Gerhart Pro Hac Vice


Joe F. Childers Wallace McMullen and Sierra Club

2014.4.1_PHV_-_Fisk_Motion_and_PO.pdf

Motion to Admit Shannon Fisk Pro Hac Vice

2014.4.1_PHV_-_Gerhart_Motion_and_PO.pdf

Motion to Admit Matthew Gerhart Pro Hac Vice

3/31/2014 9:05:23 AM

Order Entered: Khanjee's motion to intervene is denied.


3/28/2014 3:52:08 PM

Joint Motion for Deviation


Kendrick R. Riggs, Stoll Keenon Ogden PLLC Louisville Gas and Electric Company and Kentucky Utilities Company

3/27/2014 2:43:27 PM

LGE and KU Joint Petition for Confidential Protection of Responses to Initial Request from Commission Staff and Intervenors


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

3/27/2014 1:42:40 PM

LGE and KU Responses to Wallace McMullen and Sierra Clubs Initial Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Attachment to Sierra Club 1-19(e)-Hourly Elec Prices, High Gas, Mid CO2.xlsx

Attachment to SC 1.19e *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to Sierra Club 1-19(e)-Hourly Elec Prices, High Gas, Zero CO2.xlsx

Attachment to SC 1.19e *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to Sierra Club 1-19(e)-Hourly Elec Prices, Low Gas, Mid CO2.xlsx

Attachment to SC 1.19e *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to Sierra Club 1-19(e)-Hourly Elec Prices, Low Gas, Zero CO2.xlsx

Attachment to SC 1.19e *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to Sierra Club 1-19(e)-Hourly Elec Prices, Mid Gas, Mid CO2.xlsx

Attachment to SC 1.19e *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to Sierra Club 1-19(e)-Hourly Elec Prices, Mid Gas, Zero CO2.xlsx

Attachment to SC 1.19e *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to Sierra Club 1.18(a)-_17 KUHourlyFcst.xlsx

Attachment to SC 1.18a #17 *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to Sierra Club 1.18(a)-_18 LEHourlyFcst.xlsx

Attachment to SC 1.18a #18 *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

LGE_KU_Response_to_Sierra_Club_1st_DRs_2014-00002.pdf

LG&E and KU Responses to Sierra Club's Initial Data Requests

Read_1st.pdf

Read 1st - Cover Letter

3/27/2014 1:35:59 PM

LGE and KU Responses to KIUCs First Set of Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

LGE_KU_Response_to_KIUC_1st_DRs_2014-00002.pdf

LG&E and KU Responses to KIUC's 1st Data Request

Read_1st.pdf

Read 1st - Cover Letter

3/27/2014 12:27:55 PM

LGE and KU Responses to the Attorney Generals Initial Data Requests


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

Attachment to AG 1-13-_17 KUHourlyFcst.xlsx

Attachment to AG 1-13 #17 *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment to AG 1-13-_18 LEHourlyFcst.xlsx

Attachment to AG 1-13 #18 *Anticipate timeouts downloading. Filer submitted document which exceeds KY PSC standards of 50 MB limit.

Attachment_to_AG_1-13-_15_DTRep.xlsx

Attachment to AG 1-13 #15

Attachment_to_AG_1-183(k).xlsx

Attachment to AG 1-183(k)

Attachment_to_AG_1-96.xlsx

Attachment to AG 1-96

LGE_KU_Response_to_AG_1st_DRs_REDACTED.pdf

LG&E and KU Responses to AG's Initial Data Requests

Read_1st.pdf

Read 1st - Cover Letter

3/27/2014 12:19:18 PM

LGE and KU Responses to the Commission Staffs First Information Request


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

LGE_KU_Response_to_KPSC_1st_DRs_2014-00002.pdf

LG&E and KU Responses to KPSC's 1st Information Request

Read_1st.pdf

Read 1st - Cover Letter

3/24/2014 3:18:47 PM

Khanjee Infrastructure Development, LLCs Response to LGE and KUs Response to Khanjees Motion to Intervene


20140324_Khanjee Infrastructure Development, LLC_Reply to LG&E and KU's Response to Khanjee's Motion to Intervene.pdf

Khanjee Infrastructure Development, LLC_Reply to LG&E and KU's Response to Khanjee's Motion to Intervene

3/18/2014 2:19:41 PM

Order Entered: Bluegrass's motion to intervene is denied.


3/18/2014 1:56:27 PM

Order Entered: Big Rivers' motion to intervene is denied.


3/18/2014 1:42:29 PM

Order Entered Denying Robert S. Chatham's Motion to Intervene.


3/13/2014 4:27:35 PM

Instructions to the Attorney General’s Initial Requests for Information


Gregory T. Dutton Office of the Attorney General

OAG_Instructions_to_Initial_Data_Requests__LGE_and_KU_2014-00002.pdf

Instructions to AG's Initial Requests for Information

3/13/2014 4:17:28 PM

KIUC 1st Set Data Requests to KU and LGE


Michael L. Kurtz Kentucky Industrial Utility Customers

KIUC_1st_Set_DR_to_KU-LGE.pdf

KIUC 1st Set DR to KU/LG&E

Read_1st.pdf

Read first - Cover letter

3/13/2014 4:03:45 PM

Data request


John N. Hughes Bluegrass Generation Company

3/13/2014 3:32:12 PM

Sierra Clubs Initial Data Requests to Companies


Joe F. Childers Wallace McMullen and Sierra Club

SC_DR_031314.pdf

Sierra Club's Initial Data Requests to Companies

3/13/2014 3:29:09 PM

Attorney Generals First Request for Information to LGE/KU


Gregory T. Dutton Office of the Attorney General

2014-00002_Public_Initial_RFI_Redacted.pdf

AG's Initial Request for Information

3/13/2014 2:34:34 PM

Data Request


3/12/2014 2:59:58 PM

Order Entered: (1) Petitioners' request for full intervenor status is granted, and Petitioners shall accept the existing procedural schedule. (2) Petitioners shall be entitled to the full rights of a party and shall be served with the Commission's Orders after the date of this Order. (3) Petitioners shall comply with all provisions of the Commission's regulations, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. (4) Pursuant to 807 KAR 5:001, Section (8)(9), the Petitioners shall file with the Commission within seven days from the date of this Order, a written statement that Petitioners waive their right to service of any Commission Order by mail for purposes of this proceeding only, and certify that they possess the facilities to receive electronic transmission.


3/10/2014 3:36:35 PM

Reply Brief in Support of Motion for Leave to Intervene


Joe F. Childers Wallace McMullen and Sierra Club

3/7/2014 2:24:52 PM

Joint Applicants Response to Chatham Motion to Intervene


Lindsey W. Ingram III LGE and KU

3/7/2014 9:12:29 AM

Order Entered: (1) A hearing in this matter shall be held on July 8, 2014, at 10:00 am. Eastern Daylight Time, in Hearing Room 1 of the Commission's offices at 211 Sower Boulevard, Frankfort, Kentucky. (2) Louisville Gas and Electric Company and Kentucky Utilities Company ("Joint Applicants") shall publish notice of this hearing in compliance with KRS 424.300 and 807 KAR 5:001, Section 9(2). (3) The Joint Applicants shall file with the Commission no later than July 7, 2014, proof of publication of its notice of the hearing in each of the publications in which it published notice. (4) The official record of these proceedings shall be by video only. (5) Any request to cancel or postpone this hearing shall be made by motion filed with the Commission at least one week before the hearing scheduled to commence.


3/4/2014 11:46:31 AM

Joint Applicants Respnose to McMulllen and Sierra Club Motion to Intervene


Lindsey W. Ingram III LGE and KU

Joint_Applicants_Response_to_Sierra_Club_Motion_to_Intervene.pdf

Response to McMullen/Sierra Club Motion to Intervene

2/28/2014 3:09:53 PM

Robert S. Chatham Motion to Intervene


20140228_Robert S. Chatham_Motion to Intervene.pdf

Robert S. Chatham_Motion to Intervene

2/27/2014 3:25:01 PM

Public Filing of Joint Applicants February 21, 2014 Response to Bluegrass Generation Company, LLCs Motion to Intervene


Lindsey W. Ingram III KU and LGE

Joint_Applicants_Response_to_Bluegrass_Generation_Motion_to_Intervene.pdf

Publicly Filed February 21, 2014 Respose to Bluegrass Generation Motion to Intervene

2/27/2014 1:42:38 PM

Joint Applicants Response to Khanjee Motion to Intervene


Lindsey W. Ingram III KU and LGE

2/26/2014 3:47:16 PM

Reply


John N. Hughes Bluegrass Generation Company

2/25/2014 3:05:36 PM

Motion of Wallace McMullen and Sierra Club to Intervene


Joe F. Childers Wallace McMullen and Sierra Club

2/24/2014 4:20:55 PM

Attorney Generals Reply and Notice of Protest to Joint Applicants Confidential Response to Bluegrass Generation Companys Motion to Intervene


Angela M. Goad Office of Attorney General

ag_notice_of_protest_and_reply_2014-00002.pdf

Attorney General Reply/Notice of Protest

read1st_2014-00002.pdf

Read1st Cover Letter

2/24/2014 10:43:42 AM

Big Rivers letter in response to the Sur-reply of KU and LGE


Tyson Kamuf Big Rivers Electric Corporation

Read1st_BREC_letter_in_response_to_sur_reply.pdf

BREC letter in response to Sur-reply of KU and LG&E

2/21/2014 1:32:52 PM

Joint Applicants Response to Bluegrass Generation Companys Motion to Intervene


Lindsey W. Ingram III KU and LGE

2/21/2014 1:14:16 PM

Joint Applicants Sur-Reply to Big Rivers Reply to Joint Applicants Response to Motion to Intervene


Lindsey W. Ingram III KU and LGE

Joint_Applicants_Sur-Reply_to_Reply_to_Response_to_BREC_Motion_to_Intervene.pdf

Joint Applicants' Sur-Reply re Big Rivers Motion to Intervene

2/20/2014 11:36:44 AM

Khanjee Infrastructure Development LLCs Petition to Intervene


20140220_Khanjee Infrastructure Development LLC_Petition to Intervene.pdf

Khanjee Infrastructure Development LLC_Petition to Intervene

2/17/2014 3:06:06 PM

Reply of Big Rivers to LGE and KUs Response to Big Rivers Motion to Intervene.


Tyson Kamuf Big Rivers Electric Corporation

BREC_Reply.pdf

Big Rivers Electric Corporation's Reply

Read1st.pdf

Cover letter

2/14/2014 3:21:22 PM

Motion to Intervene


John N. Hughes Bluegrass Generation Company LLC

cover_letter.pdf

Cover letter

Motion_to_intervene.pdf

Motion to intervene

2/12/2014 12:59:15 PM

Joint Applicants Response to BREC Motion to Intervene


Lindsey W. Ingram III

Read1st_Cover_Letter.pdf

Cover Letter/Read1st

2/6/2014 2:45:28 PM

Order Entered: 1. The procedural schedule set forth in the Appendix, which is attached hereto and incorporated herein, shall be followed. 2. a. All requests for information and responses thereto shall be appropriately bound, tabbed, and indexed and shall include the name of the witness who will be responsible for responding to questions related to the information provided. Any request for information from the Commission Staff shall be responded to as if set forth in a Commission Order. b. Each response shall be answered under oath, or for representatives of a public or private corporation or a partnership or an association or a governmental agency, be accompanied by a signed certification of the preparer or person supervising the preparation of the response on behalf of the entity that the response is true and accurate to the best of that person's knowledge, information, and belief formed after a reasonable inquiry. c. A party shall make timely amendment to any prior response if it obtains information which indicates that the response was incorrect when made or, though correct when made, is now incorrect in any material respect. d. For any request to which a party fails or refuses to furnish all or part of the requested information, that party shall provide a written explanation of the specific grounds for its failure to completely and precisely respond.


2/6/2014 10:48:19 AM

Attorney Generals Written Statement waiving right to service of Commission Orders by U.S. mail for this proceeding.


Gregory T. Dutton Office of the Attorney General

2/6/2014 9:51:41 AM

Order Entered: 1. The Attorney General's motion is granted. 2. The Attorney General shall be entitled to the full rights of a party and shall be served with the Commission's Orders after the date of this Order. 3. The Attorney General shall comply with all provisions of the Commission's regulation, 807 KAR 5:001, Section 8, related to the service and electronic filing of documents. 4. Pursuant to 807 KAR 5:001, Section 8(9), the Attorney General shall file with the Commission within seven days from the date of this Order, a written statement that the Attorney General waives his right to service of any Commission Order by mail for purposes of this proceeding only, and certifies that he possesses the facilities to receive electronic transmission.


2/5/2014 3:10:16 PM

Big Rivers Electric Corporations Motion to Intervene


Tyson Kamuf Big Rivers Electric Corporation

BREC_Motion_to_Intervene_020514.pdf

Big Rivers Electric Corporation's Motion to Intervene

1/31/2014 2:40:23 PM

Motion to Intervene


Gregory T. Dutton Office of the Attorney General

Read_1st.pdf

Read First

1/28/2014 2:11:35 PM

20140128_PSC_No Deficiency Letter.pdf


1/21/2014 2:41:25 PM

Order Entered: (1) The petition of KIUC to intervene is granted. (2) KIUC shall be entitled to the full rights of a party and shall be served with the Commission's Orders and with filed testimony, exhibits, pleadings, correspondence, and all other documents submitted by parties after the date of this Order. (3) Should KIUC file documents of any kind with the Commission in the course of these proceedings, KIUC shall also serve a copy of said documents on all other parties of record.


1/17/2014 9:23:54 AM

JOINT APPLICATION OF LOUISVILLE GAS AND ELECTRIC COMPANY AND KENTUCKY UTILITIES COMPANY FOR CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY FOR THE CONSTRUCTION OF A COMBINED CYCLE COMBUSTION TURBINE AT THE GREEN RIVER GENERATING STATION AND A SOLAR PHOTO


Rick E. Lovekamp Louisville Gas and Electric Company and Kentucky Utilities Company

LGE_KU_CPCN_App_Test_Exh_1-17-14.pdf

Application, Testimony, and Exhibits

Petition_for_Confidential_Protection.pdf

Petition for Confidential Protection

Read_1st.pdf

Cover Letter

1/14/2014 12:07:04 PM

Kentucky Industrial Utility Customers Inc. Petition to Intervene


20140114_Kentucky Industrial Utility Customers Inc_Petition to Intervene.pdf

Kentucky Industrial Utility Customers Inc_Petition to Intervene

1/2/2014

20140102_PSC_Acknowledgement Letter.pdf


12/30/2013

LGE and KU Notice of Intent and Election to File Joint Application for Certificates of PCN for the Construction of a Combined Cycle Combustion Turbine at the Green River Generating Station and a Solar Photovoltaic Facility at the E.W. Brown Generating Stat


20131230_LG&E and KU_Notice of Intent and Election.pdf

LG&E and KU_Notice of Intent and Election